This Chronogram attempts to map the camera movements, placement of characters and architectural space, sound and gestures

within a 5 minute clip of Win Wenders Wings of Desire. The diagram proves the difficulties in showing all these elements accurately in two dimensions.

Storyboard
After condisering the storyboards content and narrative, we decided to solely use information from the Spitalfields Development Group books as the historic and present day content. However, the text is mis-interpreted by the alien who does not understand metaphorical corporate spiel. Therefore we will animate the pictures within the book to represent the literal translation of the text. We hope that, as well as educating the viewer about the history and economic drivers of the site, the short film will communicate the interpretation of the coprporate language effectively.

1. Starts in Aliens home - Alien recieves an e-card from a friend in Spitalfields

2. E-card opens up on computer interface and message is read.

7. Alien explores publications produced by Spitalfields development Group in the 21st Century. The text is very positive and so the alien decides to take a trip there.

8. He then travels through his portal to Spitalfields

3. Alien researches the history of Spitalfields.

4. Roman graveyard image

9. Travelling to Earth

10. He explores the areas that are described in the publications.

11. Against the positive phrases from the books the alien hears peoples thoughts and sees scewnes beyond the frames of the pictures, which paint a more realistic view of the area as a whole. 5. St. Spital Hospital image 6. Present day Christ Church image.

Film Stills

N
1

Osborn Street

B
3

Key Plan 1:1250

1. Grey powder-coated aluminium brise Soliel. 2. Double-glazed, aluminium framed window. 3. 240 mm cross-laminated timber floor panel. 4. Turf, topsoil, drainage crates, damp proof membrane, 500 mm CorbiaxDeck deck system with self-compacting in-situ concrete 300/400 mm, sand blasted shuttering (underside). 5. Paving, damp proof membrane, 240 mm CorbiaxDeck deck system in-situ concrete slab. 6. Suspended ceiling: slotted cross-laminated timber: silver fir, with layer of acoustic insulation; 240 mm CorbiaxDeck deck system in-situ concrete slab, damp proof membrane, paving. 7. Pebbles, 60 mm screed, damp proof membrane, slab. 8. Fire Curtain: grey powder coated steel. 9. Suspended glue laminated beam with integrated lighting. 10. Laminated oak flooring, 60mm screed, 10mm footstep sound proofing, 240mm CorbiaxDeck deck system in-situ concrete slab. 11. 400 mm Self-compacting in-situ concrete 300/400 mm, sand blasted shuttering (underside); retaining wall. 6 8 11 8

10

Perspective Detailed Section B-B 1:75

Construction Sequence

1. Existing buildings demolished and debris removed from site.

2. Site excavated. Excavated earth used to build up street level ground to raised ground floor level.

3. Basement tanking: Drainage laid, formwork erected and retaining wall cast.

7. Glulam secondary structure erected.

8. Raised ground floor cast in-situ with hollow-core, reinforced concrete system. This is extended at the front and rear over the previously excavated and compacted soil to form a raised public plaza that runs through with the ground floor level.

9. External ground floor walls erected and Glulam structure craned into position and propped up until connected to the concrete ceiling.

10. Formwork erected with openings for platforms and atrium. Hollow-core, reinforced in-situ concrete slab poured. After the concrete slab has set a drainage system is laid and then soil for planting.

4. Damp proof membrane laid and concrete walls and hollow-core concrete slab cast.

5. In-situ concete stair cores and structural fins cast in formwork to form the primary structure.

6. Formwork erected and in-situ hollow core concrete lower ground floor slab cast with central circular dipped area and integral pipe for rainwater collection.

11. First floor pre-fabricated, cross laminated floors and walls erected and joined.

12. Second floor pre-fabricated, cross laminated timber floors and walls erected.

13. Pre-fabricated, cross laminated timber roof constructed, insulation and zinc seamed roof installed.

14. Glazing and internal walls fitted; first fix electric cables installed; and plant and second fix electrics installed including pv panels.