Quotation for the Maintenance of fire fighting system M/S : C/O( SUB : Dear sir.

Thank you for your request . We are very pleased to answer your request. Below are the best prices for your requirements :
FIRE FIGHTING SYSTEM

NO. 1.

DESCRIPTIONS

QTY

U. PRICE 180

T. PRICE 2880

2.

Sprinkler head 1/2 16 npt , bronze finish , 95 C deg. temp. rating . Make USA Deluge valve a / w 1 SET Flooding valve , Solenoid valve non explosion proof and Alarm & Eest trimming and Electric actuation Make : USA
(1-4)

9400

9400

4 OS & Y gate valve Make : USA 2. Test & drain valve Make : USA 3. Heat detector with base , 135 F , Explosion proof Make : USA 4. Preaction deluge panel 2 zone Make : USA 5. Manual call point break glass type Make : USA 6. 6 Fire Alarm bell Make : USA 7. Multi alert horn Make : USA 8. Flasher red beacon Make : USA 9. Installation material like B. S. Medium pipes , Fittings , etc. Installation Labor , design , Testing & commissioning TOTAL

1.

1 1 2

870 590 280

870 590 560

1 1 1 1 1 lot

4200 200 120 180 190 lot

4200 200 120 180 190 24900

44090

(2-4) SUB :STORE NO. DESCRIPTIONS

QTY

U.

T.

Uprigh sprinkler head 1/2 , brass finish , 155 F deg. temp. rating . MAKE : USA 2. 4 Alarm check valve c / w basic triming , retarding champer and water motor alarm . 3. 4 OS & Y gate valve 4. Test & Drain valve 1 5. Vertical bladder tank 150 gallon complete with ( 4 ) 1 manual ball valves with sight glass assembly 6. Foam concentrate 3 % per gallone 7. Installation material like B. S. Medium pipes , Fittings , etc. Installation Labor , design , Testing & commissioning TOTAL
(3-4)

1.

20

PRICE 28

PRICE 560

3800

3800

1 1 1 set

900 590 43150

900 590 43150

120 lot

70 lot

8400 22500

79900

NOTES :

1 - This quotation is purely based on the information provided by you .Any change in the information will alter the quote accordingly . 2 - Our scope of work dose not includes the pipeline from the builing to the pump room , as these details were not availble to us . 3 - The installation includes the pipeline from the Risers only . No civial work is considered in our offer . 4 - The new fire fighting system shall be connected to the existing 500 GPM fire pump set according to the informations provided from your end . The quotation is valid for two weeks only . We hope that the above will meet your requirment . Please , feel free to contact us if you need any further assisstance . BEST REGARDS, Tariq Ali Aba Yazeed SALES MANAGER (4-4)