Design Realisation

Final Scheme Drawings


ARCT 1054 Tommy Clarke Unit 15

Contents: Introduction Site Location Exterior View Construction Sequence GA Basement Floor Plan GA Ground Floor Plan GA First Floor Plan GA Second Floor Plan GA Third Floor Plan Section AA Section BB Ramp Movement Rear Facade Entrance Exhibition Space Market First Floor Market Second Floor Bar Space Chronogram

Introduction
The Following Portfolio is to be read in conjunction with the Design Realisation Report. It completes the design realisation and concludes the City and Landscape, Professional Studies and Design Detail. This Document is a continuation gives an overview off all these reports with additional information to support Design and Detail and as such should be read along side these and the January Portfolio.

l St orn ane Osb ck L Bri ea d


i Wh

ing
te c p ha el g Hi h S e tr et
S e it
Wh

5 40

ch ite

urc

s Pas

age

Wh it ec hu rc h La ne

Fig 2: Site in context Scale: 1:10000

Co mm er ci al Rd

The site is located at 64-68 Whitechapel high street. It is in the heart of the whitechapel high street conservation area. These group of building have been selected for restoration under the high street 2012 scheme. The building are of historical interest and have fallen into state of disrepair due to years of neglect. The site is a prime location as it is marks the gateway from the city along the once proposed Olympic route to Stratford. The project is split into two separate procurements one for the facade restoration being undertaken by Jullian Harrp Architects and the building behind new whitechapel community market.

Fig 3: Site Location Scale: 1:1000

st rne sbo ng to O di Lea klane ic Br

Wh

it

Wh it ec ha pe l Hi gh St re et

ec

hu

rc

pa

ss

ag

Al St dga at te io n Eas t

General Arrangement Plans Basement Plan

8.

7.

6.

5.

4.

3.

2.

9. 10.

11.

12. 13.

16. 17.

14.

Void Above

1. Key: 1. Exhibition Space 2. Stair/Lift Core 3. Male W/C 4. Disabled W/C 5. Female W/C 6. Admin Office 7. Tea/Coffee Area 8. Manager Office 9. Staff Change 10. Cleaners Store 11. Kitchen 12. Prep Area 13. Dry Store 14. Staff Room 15. Cold Store 16. Riser/Dummy Waiter 17. Service Lift

15.

Basement Plan Scale 1.100

General Arrangement Plans Ground Floor

2.

2.

2.

1.

4. 7.

5. 3.

7. 6.

Void Above

Key: 1. Reception 2. Retail Pitches 3. Cafe 4. Stair/Lift Core 5. Ramp 6 Service Lift 7. Riser

Ground Floor Plan Scale 1.100

General Arrangement Plans First Floor

Void

1.

1.

1.

1.

1.

2. 4.

1. 1. 1. 1. 1. 1. 1.

1.

5. Void Above 4. 3. 1. Key: 1. Retail Pitches 2. Stair/ Lift Core 3. Service Lift 4. Riser 5. Ramp

1.

1.

First Floor Plan Scale 1.100

General Arrangement Plans Second Floor

Void

1.

1.

1.

1.

1.

1.

2. 4.

1. 1. 1. 1. 1. 1. 1.

1.

5. Void Above 4. 3. 1. Key: 1. Retail Pitches 2. Stair/ Lift Core 3. Service Lift 4. Riser 5. Ramp

1.

1.

Second Floor Plan Scale 1.100

General Arrangement Plans Third Floor

2.

1. 3. 4.

8.

8.

8.

8.

6.

4.

Void 5. 7. 8. Key: 1. Stair/ Lift Core 2. Exterior Terrace 3. Bar/ Restaurant 4. Riser/ Dum Waiter 5. Service Lift 6. Ramp 7. Bar Store 8. Retail Pitches

Third Floor Plan Scale 1.100

General Arrangement Plans Section AA

Section AA Scale 1.100

General Arrangement Plans Section

Section BB Scale 1.100

Sequence of Construction

Demolition and Basement excavation, new pylons to support the structure are bored and poured along with the ground source hear pump.

Construction of Lift shaft and stair core these play and important role in the structure. Crane erected in side lift shaft.

Construction of basement loading bearing walls and first columns go in.

Ground floor slab constructed using precast planks and crannied into place

Structure erected floor by floor.

Works to the facade work in conjunction with the new market building incase problems arise and can be sorted on site.

As most of the structure is constructed of site the steal columns and beams can be crannied in and bolted together allowing speed to the construction.

The main decorative structural steel column can now begin to be seen.

Second floor structure going in.

Facade works become more apparent.

Second floor structure goes in. The bracing to the facade structure goes in tying the facade to the super structure of the market.

Facade closely follows.

Third Floor slabs go in.

Final structure frame is erected.

Roof and roof light get constructed topping of the building and 1st and second fix can begin once the building water tight.

Axonometric views

Entrance Visual

Exhibition Space

Market

Bar Area Third Floor