Vous êtes sur la page 1sur 4

MECHANICAL COMMISSIONING STATION: NTPC-RAMAGUNDAM SYSTEM : REF : M/ 8/4 PLANT ITEM : PNEUMATICALLY OPERATED GATES PLANT NOMENCLATURE: _________________________________________________

MANUFACTURER ___________________ SRL. NO. __________________________ NO . ACTIVITY STATUS (YES/NO) REMARKS 1 X 500 MW UNIT :7

LOCATION: SHEET 1 OF 2

1.

General conditions satisfy the site standing instruction as listed in the Plant Commissioning Essential Prerequisites (MS 1/1). The name plate agrees with the approved NTPC Plant Nomenclature, is clearly visible and securely fixed, durable and correlates with remote labels. The installation is complete and correct in accordance with the latest drawings and specifications. Access for adjustments, maintenance and repairs is satisfactory. Lubricating facilities are satisfactory and the correct lubricants have been applied. Check the gate plate for its correct operation in the vertical plane and straightness of gate frame.

2.

3.

4.

5.

6.

NAME MECH.ERECT. NTPC ELECT.ERECT. COMMNG. C&I BHEL ERECT. COMMNG.

SIGNATURE

DATE

CONTRACTOR

MECHANICAL COMMISSIONING STATION: NTPC-RAMAGUNDAM SYSTEM : REF : M/8/4 PLANT ITEM : PNEUMATICALLY OPERATED GATES NO . ACTIVITY STATUS (YES/NO) REMARKS 1 X 500 MW UNIT :7

LOCATION: SHEET 2 OF 2

7.

Check the location of the flat guide bars on the frame. The ends should not interfere with the travel of the plate or be in the path of movement. Check the centre line of power cylinder and gate for in line position. Check whether the piston rods are prependicular to the connecting beam. If not adjust clevis and lock nut.

8.

9.

10. Check the proper stroking of the gate plate and adjust limit switches (reference: C&I action). 11. Check the condition of packing in the gland. 12. Check for proper seal air connections.

NAME MECH.ERECT. NTPC ELECT.ERECT. COMMNG. C&I BHEL ERECT. COMMNG.

SIGNATURE

DATE

CONTRACTOR

MECHANICAL COMMISSIONING STATION: NTPC-RAMAGUNDAM SYSTEM : REF : M /8/5 PLANT ITEM : MANUALLY OPERATED GATES PLANT NOMENCLATURE: _________________________________________________ MANUFACTURER ___________________ SRL. NO. __________________________ NO . ACTIVITY STATUS (YES/NO) REMARKS 1 X 500 MW UNIT :7

LOCATION: SHEET 1 OF 2

1.

General conditions satisfy the site standing instruction as listed in the Plant Commissioning Essential Prerequisites (MS 1/1). The name plate agrees with the approved NTPC Plant Nomenclature, is clearly visible and securely fixed, durable and correlates with remote labels. The installation is complete and correct in accordance with the latest drawings and specifications. Access for adjustments, maintenance and repairs is satisfactory. Lubricating facilities are satisfactory and the correct lubricants have been applied.

2.

3.

4.

5.

NAME MECH.ERECT. NTPC ELECT.ERECT. COMMNG. C&I BHEL ERECT. COMMNG.

SIGNATURE

DATE

CONTRACTOR

MECHANICAL COMMISSIONING STATION: NTPC-RAMAGUNDAM SYSTEM : REF : M /8/5 PLANT ITEM : MANUALLY OPERATED GATES NO . ACTIVITY STATUS (YES/NO) REMARKS 1 X 500 MW UNIT :7

LOCATION: SHEET 2 OF 2

6.

Check the gate plate for its correct operation in the horizontal plane and straightness of gate frame. Check the location of the flat guide bars on the frame. The ends should not interfere with the travel of the plate or be in the path of movement. Check the proper stroking of the gate plate. Check the condition of packing in the gland.

7.

8. 9.

10. Check the length of the chain for easy operation.

NAME MECH.ERECT. NTPC ELECT.ERECT. COMMNG. C&I BHEL ERECT. COMMNG.