This document is broadly covering the existing configuration which is being used by JPL in Project System Module Project Profile Project Type User Status Profile Network Profile Network Type Scheduling Parameters Progress Analysis Confirmation Budgeting Investment Profile
1.2 References
System R11 and Client 100 is being used for preparing the Configuration Guide.
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu OPSA Project System---Structure---Operative Structure---Work Break Down Structure---Create Project Profile
@ Jpl
A new Project Profile ZPS0001 is created for JPL for 4x600 MW Power Plant. All project structures created for progress tracking will be created with this project profile
The following are the status profile which are used in the JPL Project Profile
1. ZPS00001 Status Profile for Project Definition 2. ZPS00002 - Status Profile for WBS
Organization data basically contains the Organization details like controlling area/Company Code /Plant
@ Jpl
A new Project Profile ZPM0001 is created for JPL for Overhauling Project only for scheduling the activity in the project system.
Organization data basically contains the Organization details like controlling area/Company Code /Plant
@ Jpl
A new Project Profile ZCL0001 is created for JPL for 4x250 MW Power Plant in the system.
Organization data basically contains the Organization details like controlling area/Company Code /Plant
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu SPRO Project System---Structure---Operative Structure---Work Break Down structure---Create Project Type
@ Jpl
A new Project Type 05 to 17 is created for JPL covering the entire project which is as given below
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu OPS7 Project System---Structure---Operative Structure---Work Break Down Structure---Specify applicants
@ Jpl
An applicant 03 is created for JPL.
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu OPS6 Project System---Structure---Operative Structure---Work Break Down Structure---Specify Person Responsible)
@ Jpl
A new Project Type 01 to 13 is created for JPL as shown below.
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu OPUK Project System---Structure---Operative Structure---Work Break Down Structure---User Interface Settings --- Define Field Selection for WBS Jindal Power Ltd. Classification : Internal Page 14 of 45
For the modifiable fields, you use indicators to determine how individual fields are displayed on the screen: Field is ready for input (default setting) Field requires an entry (required entry) Field is only displayed Field is hidden Field is highlighted
@ Jpl
Procedure
To carry out the activity, choose one of the following navigation options:
OK02 Project System---Structure---Operative Structure---Network Structure---Network User Status- Create Network User Status Profile
@ Jpl
Following are the Network User Status Profile created for JPL power project. - ZPS00001 Status Profile for Project definition - ZPS00002 -- Status profile for WBS - ZPS00003 Status Profile for Network
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu OPSC Project System---Structure---Operative Structure---Network--Maintain Network Types
@ Jpl
ZPS1 is the Network type created for JPL with the object class as INVST /settlement profile as ZPS2 & status profile as ZPS00003
@ Jpl
ZCON is the Network type created for JPL with the object class as INVST /settlement profile as ZPS2 & status profile as ZPS00003. The different network types are made basically for progress tracking of 4 X 600 MW power plant
@ Jpl
ZENG is the Network type created for JPL with the object class as INVST /settlement profile as ZPS2 & status profile as ZPS00003. The different network types are made basically for progress tracking of 4 X 600 MW power plant
@ Jpl
ZSUP is the Network type created for JPL with the object class as INVST /settlement profile as ZPS2 & status profile as ZPS00003. The different network types are made basically for progress tracking of 4 X 600 MW power plants
Procedure
To carry out the activity, choose one of the following navigation options:
OPUV Project System---Structure---Operative Structure---Network-Settings for Network- Specify parameters for Network Type
@ Jpl
The Network type which is mapped out here against the plant 2200 is ZPS1 /ZENG/ZPM1/ZSUP/ZCL1
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu OPU6 Project System---Dates---Scheduling--- Specify Parameters for Network Scheduling
@ Jpl
The following are the control parameters defined for the JPL Power Project Order Type --- ZPS1/ZCON/ZSUP/ZENG Scheduling type --- Backward Start Dates in the past --- 730 Automatic Scheduling on saving
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu OPST Project System---Confirmation---Define Confirmation Parameters
@ Jpl
Below is the confirmation parameter defined for JPL
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu OPJK Project System---Material---Availability Check--- Define Checking Control
Which check rule is to be used and whether a check is to be carried out, is specified depending on plant and network type and the business transaction, for example, whether the check is to take place when creating or releasing a network
@ Jpl
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu OPUU Project System---Structure---Operative Structure---Network--Settings for NetworkMaintain Network Profiles
The data which is entered here in the network profile is copied into the header, activities, and activity elements when network is created These values can be overwritten.
@ Jpl
ZPS0001/ZCL0001/ZPM0001 is the network profile configured for JPL as shown below
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu OPUA/OPUB/OPUC Project System---Structure---Operative Structure---Network--User Interface Settings--- Define Field selection for Networks
@ Jpl
The following is field selection defined for JPL
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu -NAProject System---Progress---Progress Analysis
Measurement methods, fields and defaults are provided with the standard system and you can use them to carry out progress analysis
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu SPRO Project System---Progress---Progress Progress Version Analysis--Maintain
@ Jpl
A new progress version JPL was created for the purpose of project progress tracking
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu SPRO Project System---Progress---Progress Analysis---Define Statistical Key Figures
@ Jpl
Three different key figures for 1000 controlling area has been configured. They differ in how they are used. The following usage types are possible: Non-aggregated POC Aggregated POC POC for results analysis
Procedure
To carry out the activity, choose one of the following navigation options:
@ Jpl
The settings are made per controlling area For the project version JPL, Estimates and Work methods have been made as default plan and actual methods
Procedure
To carry out the activity, choose one of the following navigation options:
@ Jpl
Availability control For JPL ZPS001/ZPM001/ZCL001 budget profile has been configured which is given below
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu SPRO Project System---Cost---Budget---Define Tolerance Limits
You activate availability control for a certain budget profile. You can specify one or more tolerance limits for each activity group for a budget profile.
Selected actions (warning, warning with mail to person responsible for project, error message) are triggered when these limits are reached.
@ Jpl
The following are the limits which are defined for JPL project.
Procedure
To carry out the activity, choose one of the following navigation options: Transaction Code IMG Menu OITA Investment Management --- Project as Investment Measures--Master Data --- Define Investment Profile)
@ Jpl
For JPL a new investment profile ZPS001 has been configured with the inv meas ast class as 2100 Line item settlement and list of origins would be active.