Vous êtes sur la page 1sur 12

ABSTRACT FOR NEWCONSTRUCTION OF MAJOR BRIDGE

Item No.

Item Description
SACRIFICIAL WELL

A.

B.

Quantity

Unit

Rate

Amount

Providing and Constructing Temporary Island 16 m


diameter for Construction of Well Foundation for 8m dia.
Well.
Assuming depth of water 4.0 m and height of island 4.5
m.
(As per Rate Analysis Attached)

4.000

Nos

528041.00

2112164.00

Providing and constructing one span service road to reach


island location from one pier location to another pier
location
(As per Rate Analysis Attached)

64.500

Rmt

6951.00

448340.00

Providing and Laying Cutting Edge of Mild Steel weighing


40 kg per metre for Well Foundation complete as per
Drawing and Technical Specification.
(As per Rate Analysis Attached)

2.375

MT

61249.00

145469.00

Plain/Reinforced Cement Concrete, in Well Foundation


complete as per Drawing and Technical Specification. Well
curb RCC Grade M20
(As per Rate Analysis Attached)

6.909

CUM

4170.00

28810.00

Providing and Laying Well steining of Mild Steel weighing


100 kg per cum for Well Foundation complete as per
Drawing and Technical Specification.
(As per Rate Analysis Attached)

45.380

MT

61249.00

2779498.00

Plain/Reinforced Cement Concrete, in Well Foundation


complete as per Drawing and Technical Specification.
(As per Rate Analysis Attached)
Well steining
PCC M20 Grade

453.803

CUM

4073.00

1848340.00

Sinking of 6m external diameter well (other than


pneumatic method of sinking) through all types of strata
namely sandy soil, clayey soil and rock as shown against
each case, complete as per drawing and technical
specifications. Depth of sinking is rekoned from bed level.
(As per Rate Analysis Attached)
Sandy Soil
upto 3m
Beyond 3m upto 10m depth
Beyond 10m upto 20m depth
Hard rock
Dewatering

9.000
21.000
4.090
0.000
42.270

Rmt
Rmt
Rmt
Rmt
Rmt

1497.00
2059.00
2161.95
57966.00
831.00

13473.00
43239.00
8842.00
0.00
35126.00

Providing and Laying Bottom plug of Mild Steel weighing


5 kg per sqm for Well Foundation complete as per Drawing
and Technical Specification.
(As per Rate Analysis Attached)

0.424

MT

61249.00

25963.00

Plain/Reinforcement concrete in Bottom plug complete as


per Drawing and Technical Specifications.
(As per Rate Analysis Attached)
PCC Grade M20

50.868

CUM

4073.00

207185.00

Item No.

Quantity

Unit

Rate

Amount

1175.713

CUM

1147.00

1348543.00

I
i)
ii)
iii)

backfilling with approved material.


(As per Rate Analysis Attached)
Ordinary Soil
Upto 3 m depth
3m to 6m depth
Above 6m depth

542.758
408.864
1094.594

Cum
Cum
Cum

41.00
47.00
57.00

22253.00
19217.00
62392.00

II
i)

Ordinary rock (not requiring blasting)


Depth upto 3 m

201.187

Cum

52.00

10462.00

III

Hard rock (requiring blasting)

0.000

Cum

745.00

0.00

I
i)
ii)
iii)

Add Extras as follows in the rates of the above items if


dewatering is resorted to
(As per Rate Analysis Attached)
Ordinary Soil
Upto 3 m depth
3m to 6m depth
Above 6m depth

542.758
408.864
1094.594

Cum
Cum
Cum

2.00
3.00
5.00

1086.00
1227.00
5473.00

II
i)

Ordinary rock (not requiring blasting)


Depth upto 3 m

201.187

Cum

4.00

805.00

III

Hard rock (requiring blasting)

0.000

Cum

21.00

0.00

Supplying, fitting and placing uncoated TMT bar


Reinforcement in foundation complete as per drawing and
Technical Specifications.
(As per Rate Analysis Attached)

14.742

Tonne

47778.00

704355.00

Plain/Reinforcement concrete in Open Foundation


complete as per Drawing and Technical Specifications.
PCC Grade M15
(As per Rate Analysis Attached)

33.139

Cum

3484.00

115455.00

133.225

Cum

4068.00

541959.00

10

Item Description
Sand Filling in Foundation Trenches as per Drawing &
Technical Specification
FOUNDATION

Earth work in excavation for foundation of structures as per


drawings and technical specifications, including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious matter, dressing of sides and bottom and

Plain/Reinforcement concrete in Open Foundation


complete as per Drawing and Technical Specifications.
RCC Grade M30
(As per Rate Analysis Attached)

Item No.

Item Description
SUBSTRUCTURE

A
a)
b)
c)
B
a)
b)
c)
C
a)
9

10

11

Quantity

Unit

Rate

Amount

Supplying, fitting and placing TMT bar Reinforcement in


substructure complete as per drawing and Technical
Specifications.
(As per Rate Analysis Attached)

78.068

Tonne

47883.00

3738142.00

Providing weep holes in brick masonary/Plain/reinforced


concrete abutment, wing wall/ return wall with 100 mm
dia AC pipe, extending through the full width of the
structures with slope of 1V:20H towards drawing foce.
Complete as per drawing and Technical Specifications.
(As per Rate Analysis Attached)

4.000

Each

385.00

1540.00

Plain/Reinforced cement concrete in substructure complete


as per Drawing and Technical Specifications.
(As per Rate Analysis Attached)
Abutment
RCC Grade M30
Height upto 5m
Height beyond 5m and upto 10m
Height above 10m

140.798
77.967
94.680

Cum
Cum
Cum

4287.00
4392.00
4540.00

603602.00
342432.00
429848.00

Pier
RCC Grade M30
Height upto 5m
Height beyond 5m and upto 10m
Height above 10m

47.100
47.100
49.455

Cum
Cum
Cum

4287.00
4392.00
4540.00

201918.00
206863.00
224526.00

Return wall
PCC Grade M20
Height upto 5m

78.667

Cum

4073.00

320411.00

Plain/Reinforced cement concrete in substructure


complete as per Drawing and Technical Specifications
(As per Rate Analysis Attached)
In Cap RCC Grade M30

118.234

Cum

4287.00

506868.00

Plain/Reinforced cement concrete in substructure complete


as per Drawing and Technical Specifications.
(As per Rate Analysis Attached)
In Pedestal RCC Grade M40

4.194

Cum

4402.000

18464.00

512000.000

Cu.Cm

0.304

155868.00

Supplying, fitting and fixing in position true to line and


level elastomeric bearing conforming to IRC: 83 (Part-II)
section IX and clause 2005 of MoRTH specifications
complete including all accessories as per drawing and
Technical Specifications.
(As per Rate Analysis Attached)

Item No.

Item Description
SUPERSTRUCTURE

12

13

14

15

16

17

18

19

Quantity

Unit

Rate

Amount

Supplying , Fitting and placing TMT bar reinforcement in


superstructure complete as per drawing and Technical
Specifications
(As per Rate Analysis Attached)

95.772

Tonne

49161.00

4708257.00

Furnishing and placing reinforced/prestressed cement


concrete in superstructures as per drawing and Technical
Specifications
Dirt Wall in RCC M30
(As per Rate Analysis Attached)

23.702

Cum

4800.00

113769.00

Backfilling behind abutment, wing wall and return wall


complete as per drawing and Technical Specifications.
(As per Rate Analysis Attached)

1856.342

Cum

547.00

1015419.00

Providing Drainage Spouts complete as per drawing and


Technical specification and as per clause 2705 of
specifications.
(As per Rate Analysis Attached)

42.000

Each

3570.00

149940.00

(Provisional Rates)

62.112

Metre

9160.00

568946.00

Furnishing and placing reinforced/prestressed cement


concrete in superstructures as per drawing and Technical
Specifications
Girder & Slab in RCC M30
(As per Rate Analysis Attached)

522.213

Metre

4800.00

2506624.00

PCC M15 Grade levelling course below approach slab


complete as per drawing and Technical Specifications.
(As per Rate Analysis Attached)

12.165

Cum

3370.00

40996.00

Reinforced cement concrete Approach slab including


reinforcement and formwork complete as per drawing and
Technical Specification. RCC M25
(As per Rate Analysis Attached)

23.987

Cum

6424.00

154093.00

Providing and laying of an elastomeric slab seal expansion


joint, catering to right or skew (less than 20 deg.,
moderately curved with maximum horizontal movement
upto 50 mm, complete as per approved drawings and
standard specifications to be installed by the
manufacturer/supplier or their authorised representative
ensuring compliance to the manufacturer's instructions for
installation and clause 2606 of MoRTH specifications for
road & bridge works.

Item No.
Item Description
20
Provision of an Reinforced cement concrete crash barrier
at the edge of road, approaches to bridge structures and
medians, constructed with M30 grade concrete with HYSD
reinforcement conforming to IRC:21 and dowel bars 25mm
dia. 450mm long at expansion joints filled with premoulded
asphalt filler board , keyed to the structure on which it is
built and installed as per design given in the enclosure to
MOST circular No. RW/NH -33022/1/94-DO III dated 24
june 1994 as per dimensions in the approved drawing and
at locations directed by engineer, all as specified etc.
complete.
Crash barrier RCC Grade M30

21

22

Quantity

Unit

Rate

Amount

(As per Rate Analysis Attached)

197.660

RMT

2643.00

522415.00

Providing and laying Bituminous Concrete on prepared


surface with specified graded crushed stone aggregates
premixed with bituminous binder as per job Mix formula
and 2% filler lime or cement by weight of total aggregate as
per job mix. Transporting the mix to the work site, laying
with a hydrostatic paver finisher to the required grade level
and alignment, rolling with roller to achieve the desired
compactions per MORT &H specification complete in all
respect excluding cost of tack coat. (The Rate is for Bitumen
Content @ 5.0% by weight of total mix)
(As per Rate Analysis Attached)

86.363

Cum

7695.00

664565.00

1079.540

Sq.m.

508.00

548406.00

Providing & laying 25 mm thick Mastic Asphalt wearing


course with paving grade bitumen 14% by wt. of mix ,
filler, fine & coarse aggregate , meeting the requirements
given in table 500-29 of MORT&H specifications, prepared
by using mastic cooker and laid to required level and slope
after cleaning the surface, including providing antiskid
surface with bitumen precoated fine grained hard stone
chipping of 13.2 mm nominal size at the rate of 0.005 cum
per 10 sqm and at an approximate spacing of 10 cm center
to center in both directions, pressed into surface when the
temperature of surface is not less than

1000C,

protruding 1mm to 4mm over mastic surface etc. complete,


excluding tack coat . (Mix design is required for each case).
(As per Rate Analysis Attached)

TOTAL FOR NEWCONSTRUCTION OF MAJOR BRIDGE =

28273588.00

NEWCONSTRUCTION OF MAJOR BRIDGE AT CH.- 539+800.00


DATA
Abutment (L)

Abutment (R)

Pier

Return

GL
RTL
Soffit
FL
Soft Rock RL
Hard Rock RL
Level at 5m From
Foundation Top

276.605
279.870
277.475
259.705
262.605
259.605

277.060
279.870
277.475
262.160

272.398
279.870
277.475
258.375

278.725
279.870

262.060

257.898

266.725

265.805

268.260

264.675

280.608

Level at 10m From


Foundation Top

270.805

273.260

269.675

285.608

Dia of Pier
Length of Abutment

2.000
12.422

Skew =
Skew Factor

15 0
1.035

Overall Span
LBL

21.50
270.530

No of Spans
Pier
Cap Top Width
Pier Top Width
Side slopes 1:
No. of Abutment

275.308
Length of Return (Left)
Length of Return (Right)
Top of Pier Cap
276.925
Level
Top of Left Abt. Cap Level

276.975

Top of Right Abt. Cap Level

276.975

3.600
3.600

No. of Pier
Deck Slab (C)
(E)
Pier Foundation Bottom

4.0
RCC
1.24
2.3
0
2
3
0.225
0.200
0.4

Sloping Portion Ht. 0.9


Diameter of sacrificial well ( r ) 6.0

MEASUREMENTS
Item
No.

Description

No.

Length
(m)

4.0

Breadth
(m)

Depth
(m)

Unit

Quantity

Nos

4.000

A) SACRIFICIAL WELL
1

Temporay Island

Service Road

Nos

4.000

for 1st Pier

1.000

21.500

Total

RMT

21.500

for 2nd Pier

1.000

21.50+ 21.50

RMT

43.000

for 3rd Pier

1.000

43 + 21.50

RMT

64.500

RMT

64.500

Total
3

Cutting edge of mild steel weighing 40


kg per metre

Circumference

2*p*r

56.549

MT
Add 5% for wastage or for Dowel bar
Total

2.262
0.113

MT

2.375

m3

6.909

Well Curb (RCC M20)


0.3

Area
0.15

Circumfernce

0.045
0.077
56.549

0.122

m2

0.64
0.015
angle
m3

6.909

Quantity of Well Steining =

m3

453.803

R/F @ 100 kg/cum =

MT

45.380

MT

45.380

m3

453.803

m3

453.803

RMT

14.090

Total
5

Well Steining
R/F @ 100 kg/cum

Well Steining (PCC M20)


0.5
height of P1
height of P2
height of P3
Avg height

height

Sinking of well
A.

B.

In Sandy Soil

In Hard rock

Dewatering

height of P1
height of P2
height of P3
Avg height

height of P1
height of P2
height of P3
Avg height

17.940
16.115
14.095
16.050

15.5
13.27
13.5
14.090

0.000
0.000
0.000
0.000
14.090

Circumfernce
Area

56.549
8.03

Depth below bed level upto 3m


Beyond 3m upto 10m depth
Beyond 10m depth
upto 3m
RMT

3.000
7.000
4.090
9.000

3 to 10m

RMT

21.000

Above 10m

RMT

4.090

RMT

0.000

RMT

0.000

RMT

42.270

Remarks

Item
No.
8

Description

No.

Length
(m)

Bottom Plug
R/F @ 5 kg/Sqm

Breadth
(m)

Depth
(m)

Quantity of Bottom Plug =


R/F @ 5 kg/Sqm =

Bottom plug (PCC M20)


2
0.9

Unit

Quantity

m2

84.780

MT

0.424

MT

0.424

m3

50.868

Area

28.260

m3

50.868

Area
Avg Height

28.260
16.050

m3

1360.719

Area foundation block

16.000

m3

19.200

9.923

m3
m3

139.015

Remarks

Sacrificial well
0.4
4
10

Sand Filling

Deduction for Pier

Pier

3.142

1175.713

ROAD TOP LEVEL


279.870
CROSS GIRDER

CRASH BARRIER RCC M30

APPROACH SLAB
LEVELLING
COURSE OF
APPROACH
SLAB

26.791

TOP LEVEL OF
ABUTMENT CAP

SOFFIT LEVEL
277.475

POT PTFE BEARING


WITH RCC PEDESTRAL

276.975

600 mm THK.
FILTER MEDIA

ABUTMENT
FOUNDATION
LEVEL

259.705
LEVELLING COURSE
( PCC M15 )

PIER FOUNDATION
LEVEL

258.375
A) FOUNDATION
Abutment (Left)

Abutment (Right)

Pier

Return

3.418
0.000
0.000

Soil =
Soft Rock =
Hard Rock =

14.000
3.000
0.000

15.000
0.000
0.000

14.500
0.000
0.000

1.0

12.629

5.310

3.000

m3

201.187 Soil

1.0

12.629

5.310

3.000

m3

201.187 Soft rock

12.629

5.310

0.000

m3

3.000

201.187 Soil

536.499 Soil

186.032 Soil

Earthwork in Excavation
a) Abutment (L)
Height Upto 3 m

1.0
0.5 Height bet. 3 to 6 m
0.30
0.6
2.81

1.0
0.6 Height above 6 m

2.30

12.629

5.310

12.629

5.310

8.000

1.0

12.629

4.910

3.000

m3

1.0

12.629

4.910

0.000

m3
3

1.0

0.000 Hard rock

Abutment (R)
Height Upto 3 m

0.6
2.41

2.30

0.000 Soft rock

0.5

1.0
Height bet. 3 to 6 m

12.629

4.910

0.000

0.6

1.0
Height above 6 m

12.629

4.910

3.000

m3

186.032 Soil

1.0

12.629

4.910

9.000

m3

558.095 Soil

0.3

0.000 Hard rock

Item
No.

Description

No.

Length
(m)

Breadth
(m)

Depth
(m)

Unit

Quantity

Remarks

2.0

3.900

3.069

3.000

m3

2.0

3.900

3.069

0.000

m3

0.000

0.000 Hard rock

9.995 Soil

83.716 Soil

b) Return
Left -

Height Upto 3 m

2.0
Height bet. 3 to 6 m

3.069

0.418

2.0

3.900

3.578

3.000

m3

2.0

3.900

3.578

0.000

m3
3

Height bet. 3 to 6 m
2.0
Height Upto 3 m

3.900

3.578

0.000

3.900

3.578

0.418

m3

0.000 Soft rock


0.000 Hard rock

11.650 Soil

Excavation in Soil

m3

542.758

Excavation in Soft Rock

m3

201.187

Excavation in Hard Rock

0.000 Soft rock

Height Upto 3 m

2.0

Total

3.069

3.900

2.0
Right -

3.900

71.823 Soil

0.000

408.864

Height bet. 3 to 6 m

Excavation in Soil

Height above 6 m

Excavation in Soil

m3

1094.594

Excavation in Soil

m3

542.758

Excavation in Soft Rock

m3

201.187

Excavation in Hard Rock

m3

0.000

Height bet. 3 to 6 m

Excavation in Soil

m3

408.864

Height above 6 m

Excavation in Soil

m3

1094.594

Dewatering
Quantity as per item no. 1=

Total

Height Upto 3 m

Foundation TMT Re-bar


a) Abutment (L)
@ 120 kg/m3
1.0

12.422

5.110

0.600

m3

38.087

1.0

12.422

1.300

0.500

m3

6.211
44.298

1.0
1.0

12.422
12.422

4.710
1.300

0.600
0.500

m3
m3

35.106
6.211
41.317

3.0

4.000

4.141

0.400

m3

19.876

3.0

3.150

3.261

0.900

m3

27.734
47.610

m3

85.615

m3

47.610

MT
MT

10.274
4.166

1.842

b) Abutment (R)
@ 120 kg/m3

Foundation Block @ Pier


@ 87.5 Kg/m3

Total

Total Quantity of Reinforcement @ 120 Kg/m3


Total Quantity of Reinforcement @ 87.5 Kg/m3
b) Return
@ 5 Kg/m2
Left
2.0

3.069

0.300

m2

2.0

3.900

0.300

m2

2.340

23.941
28.123

2.0

3.069

3.900

2.0

3.578

0.300

m2

2.0

3.900

0.300

m2

2.340

2.0

3.578

m2

27.905
32.392

m3

60.514

MT

0.303

Total

MT

14.742

Right

3.900

Total
Total Quantity of Surface Reinforcement @ 5 Kg/m2

2.147

Foundation PCC M15


Levelling Course
a) Abutment
b) Pier

1.0

12.629

5.310

0.100

m3

6.706

1.0

12.629

4.910

0.100

m3

6.201

3.0

4.200

4.348

0.100

m3

5.478

Item
No.

Description
c) Return

No.

Length
(m)

Breadth
(m)

Depth
(m)

Unit
3

Quantity

Left

2.0

3.900

3.048

0.300

Right

2.0

3.900

3.256

0.300

m3

7.620

Total

m3

33.139

7.133

Foundation RCC M30


a) Abutment (L)

Abutment (R)

1.0

12.422

5.110

0.600

m3

38.087

1.0

12.422

1.300

0.500

m3

6.211

35.106

1.0

12.422

4.710

0.600

1.0

12.422

1.300

0.500

m3

6.211

3.0

4.000

4.141

0.400

m3

19.876

3.0

3.150

3.261

0.900

m3

27.734

b) Pier
Foundation Block

Total

133.225

B) SUBSTRUCTURE
6

Substructure TMT Re-bar


a) Abutment (L)
@ 120 kg/m3
Stem

1.0

12.422

0.300

15.720

m3

58.584

Counterfort

3.0

0.500

C/S Area=

24.146

m3

36.219

16.045

15.403

64.545

3.0

0.500

0.640
3.310

19.500

12.422

0.300

13.265

m3

49.435

0.500

C/S Area=

17.742

m3

26.612

3.0

0.500

0.640

13.590

m3

13.046

2.0

0.500

2.910

17.045

m3

End Wall

2.0

0.500

Stem

1.0

Counterfort

3.0

Abutment (R)
@ 120 kg/m3

End Wall

49.601
313.446

Total Quantity of Reinforcement of Abutment @ 120Kg/m3

37.613

b) Pier
@ 87.5 Kg/m3
3.0

Area=

3.140

15.250

m3

143.655
143.655

Total Quantity of Reinforcement of Pier @ 87.50Kg/m3

12.570

c) Returns
@ 5 Kg/m2
Left
Outer Side

2.0

4.283

3.600

m2

30.834

Inner Side

2.0

3.870

3.600

m2

27.864

C/s Area

4.0

c/s Area

4.718

m2

18.873

36.400
32.942

Right
Outer Side

2.0

5.056

3.600

Inner Side

2.0

4.575

3.600

m2

6.208

C/s Area

4.0

c/s Area

24.831
171.743

Total Quantity of Surface Reinforcement of Return @ 5Kg/m2

MT

0.859

Abutment cap
@ 185 kg/cum

Quantity for Abutment Cap in m3 =

12.112

MT

2.241

Quantity for Pier Cap in m3 =

106.122

MT

24.408

Quantity for Pedestal in m3 =

4.194

MT

0.377

MT

78.068

0.000

Pier Cap
@ 230kg/cum
Pedestal
@ 90kg/cum

Total
7

Weep holes
Abutment

2.0

12.422

-0.230

3.0

3.310

-0.230

m2

0.000
6.696

Return(L)

2.0

3.600

0.930

m2

Return(R)

2.0

3.600

0.930

m2

6.696

Total

m
Nos.

13.392
4.285

Total

Nos.

4.000

1000mm C/C in Staggered Manner

Remarks

Item
No.
8A

Description

No.

Abutment RCC M30


0.3
Left

Length
(m)

Abt.cap bott.
276.525

Breadth
(m)

Depth
(m)

Level Upto 5m Ht.


265.805

Level At 10m Ht.


270.805

Unit

Quantity

Height upto 5m
`

0.3
0.15

1.0

12.422

0.300

5.000

m3

18.634

3.0

0.500

C/S Area=

24.146

m3

36.219

3.0

0.500

0.640

5.000

m3

4.800

2.0

0.500

3.310

5.000

m3

16.550
76.202

1.0

12.422

0.300

5.000

m3

18.634

3.0

0.500

0.640

5.000

m3

4.800

16.550
39.984
21.317

Height bet 5m to 10m


0.300
16.370
16.220

0.500

3.310

5.000

1.0

12.422

0.300

5.720

m3

3.0

0.500

0.640

6.045

m3

5.803

2.0

0.500

3.310

9.500

m3

31.445
58.565

2.0

Height above 10m


260.305

Foundation =
Level

259.71

Height upto 5m

Right

1.0

12.422

0.300

5.000

m3

18.634

3.0

0.500

C/S Area=

17.742

m3

26.612
4.800

3.0

0.500

0.640

5.000

m3

2.0

0.500

2.910

5.000

m3

14.550
64.596

1.0

12.422

0.300

5.000

m3

18.634

3.0

0.500

0.640

5.000

m3

4.800

14.550
37.984
12.168

Height bet 5m to 10m

0.500

2.910

5.000

1.0

12.422

0.300

3.265

m3

3.0

0.500

0.640

3.590

m3

3.446

2.0

0.500

2.910

7.045

m3

20.501
36.115

Height Upto 5m

Total
Total

m3
m3

140.798

Height Bet. 5 to 10m

2.0

Height above 10m

Foundation

Height Abv. 10m


B

Pier RCC M30

Width at 5m
2.000

0.53

77.967

Total

5.000

m3

47.100

47.100

94.680

Width at 10m
2.000

1.48
2.000
B

15.250

16.550

4.000

2.000

259.68

2.300 0.15
0.9

0.85

2.300

0.4
4.000

0.10

4.200
A) Height upto 5m

3.0

Area =

3.140

B) Height bet 5m to 10m

3.0

Area =

3.140

5.000

3.0

Area =

3.140

5.250

m3

49.455

Height Upto 5m

Total
Total

m3
m3

47.100

Height Bet. 5 to 10m

C) Height above 10m

Height Abv. 10m

Total

47.100
49.455

Remarks

Item
No.
C

Description

No.

Return Walls PCC M20


Left
3.850

Length
(m)

Breadth
(m)

Depth
(m)

Unit

2.0
Section 2

3.600

c/s area =

0.157

m3

1.132

2.0
Section 3

3.600

c/s area =

2.391

m3

17.217

2.0
Section 4

3.600

c/s area =

1.217

m3

8.761
4.575
2.287
33.972

Level At 5m
280.608

Quantity

Level At 10m
285.608

Height upto 5m
Section 1

0.6211
1.35

3.16
3

5.000
1.370

0.797
4

0.233

0.797

2.0
Section 5

3.600

c/s area =

0.635

m3

2.0

3.600

c/s area =

0.318

m3

2.0
Section 2

3.600

c/s area =

0.361

m3

2.598

2.0
Section 3

3.600

c/s area =

2.823

m3

20.326

2.0
Section 4

3.600

c/s area =

1.696

m3

12.209

6.375

0.797
2.448
Right
4.545
Height upto 5m
Section 1

0.621
2.05
3.72
5.000
3

0.941

2.075
1

0.353

2.0
Section 5

3.600

c/s area =

0.885

2.0

3.600

c/s area =

0.443

m3

3.188
44.695

Height Upto 5m

Total

m3

78.667

Height Bet. 5 to 10m

Total

m3

0.000

Height above 10m

Total

m3

0.000

0.941
0.941
2.956

RCC M30 in Caps


1.24

0.30
0.15

0.300
i) Abutment Cap

2.0

12.422

1.240

0.300

m3

9.242

2.0

12.422

(1.24+0.3)/2

0.150

m3

2.870

3.0

2.300

m3

55.200

2.300

10.000
(2.3+10)/2

0.800

3.0

1.200

m3

50.922

Total

m3

118.234
1.568

ii) Pier Cap


2.3
0.80
1.20
10
0.80
1.20
2.3

10

11

Pedestal RCC M40

8.0

0.700

0.700

0.400

m3

8.0

0.700

0.700

0.310

m3

1.215

8.0

0.700

0.700

0.225

m3

0.882

8.0

0.700

0.700

0.135

m3

0.529

Total

4.194

Elastomeric bearing
32.0

40.000

40.000

10

Cu.Cm.

512000.00

Total

Nos

512000.00

C) SUPERSTRUCTURE
12

Superstructure TMT Re-bar


Dirt Wall @ 185 kg/cum

Quantity Of Dirt Wall =

23.702

(23.702*185)/1000

MT

4.385

RCC girder & Slab @ 175 kg/cum

Quantity Of RCC Girder & Slab =

522.213

(522.213*175)/1000

MT

91.387

TMT

MT

95.772

Remarks

Item
No.
13

Description

No.

Length
(m)

Breadth
(m)

Depth
(m)

2.0
2.0
2.0

12.422
12.422
12.422

2.830
0.100
c/s Area

0.300
0.100
0.005

Unit

Quantity

RCC M30 in Dirt Walls


0.3
0.1
0.25

0.150
2.830

14

m3

Total

23.702
720.25

Filling in Counterfort
Left

1.0

3.310

11.422

19.050

m3

Right

1.0

2.910

11.422

16.595

m3

551.60

m3

-91.28

309.91

Deduction of Counterfort
Filling in Return

2.0

3.600

2.0

15

21.093
2.484
0.124

m3
m3
m3

3.600

11.180

3.850

11.180

4.545

Total

m3

860.00

Nos.

42.000

365.86
1856.342

(For 20 m2 area 1 Drainage Spout is Provided)

Drainage spout

C/S Area =

11.00*21.5*4

Total
16

Elastomeric
seal Exp. Joint

Slab Abutments
Pier

17

Superstructure (Girder & Slab) -

2.0
3.0

12.422
12.422
Total
0.700

Nos

42.000

RMT
RMT

24.845
37.267

RMT

62.112

0.900

0.900

0.700

18.860
0.925
0.15

1
1.28
0.325

0.625
Section -1-1

Depth of
Cross Girder

Section -1-1

18

0.15 RCC M30 Girder 0.25 For 20m Span


Straight Portion-

Span(L) = 21.500
PLAN OF GIRDER
4.0
4.0
4.0
4.0

4.0
4.0
4.0
4.0

18.860
18.860
18.860
18.860

0.625
0.475
0.325
0.625

0.250
0.150
1.280
0.150

m3
m3
m3
m3

47.150
21.500
125.532
28.290

Tapering Portion-

4.0
4.0
4.0
4.0

8.0
8.0
8.0
8.0

0.900
0.900
0.900
0.900

0.625
0.475
0.325
0.625

0.250
0.150
1.280
0.150

m3
m3
m3
m3

4.500
2.052
11.981
2.700

End Portion -

4.0

8.0

0.700

0.625

1.830

m3

25.620

Cross Girder -

4.0

9.0

0.300

1.675

1.430

m3

25.869

Deck Slab -

4.0

21.500

12.422

0.213

m3

227.019

Total

m3

522.213

PCC M15 for levelling course


2.0

19

21

11.422

0.150

Total

m3

12.165

0.300

m3

23.987

Superstructure RCC M30


Crash Barrier

2.0

3.500

11.422

Total

RMT

197.660

Total

RMT

197.660

0.04

m3

98.830

23.987

40mm thk. Bituminous Concrete


2.0

98.140

11.000

Total
22

12.165

M25 conc. For Approach slab


2.0

20

3.550

86.363
86.363

25mm Thk. Mastic Asphalt


1.0

98.140

11.000
Total Mastic asphalt

m2

1079.540
1079.540

Remarks