General Objectives

1.Quality of Service Management -Call Drop Rate (CDR) < 1% -Call Setup Success Rate (CSSR) > 95% -BI Call Setup Blocking Rate (CSBR) < 1.8% 2. Management Radio Network Optimization KPIs -% of worst cells in the Network with CSSR< 95%= <10% of total network cells -% of worst cells in the Network with BI CSBR > 1.8% = < 6% of total network cells -% of worst cells in the Network with Handover Success Rate <90% = < 6% of total network cells 3.Traffic Management -BI TCH Blocking Rate(TBR)<2% -BI SDCCH Blocking Rate(SBR)<2% 4.Co-ordination of Radio Network Optimization processes - Databases Management & Continuous improvement of optimization processes

5.Radio Environment Design -Continuous check & optimization of the Radio Network Design -Cell Database preparation & Validation

Some More General Points 3.New sites Planning. 4.Validation of Drafts, VSWR and frequency planning Wos. 5.follow up the redesign for on air sites. 8. Site surveys for critical sites (eg Indoor coverage) and special projects (e.g. TMBs) 9.Follow up the updating of planning tool. 10. Handle all problems affecting the planet tool. 11. Follow up all upgrades of tool. 1.New site design planning. 2.Site survey (Site survey visit, Candidate nominations and Candidates evaluation and selection) 3.Technical site survey visit (Technical visits and Generation of a Draft form) 4-New site parameter planning (i.e. , frequency, neighbours, etc) 5-Integration report analyses(from quality team). 6.redesign the on air sites 5.responsible for maintenance and update of the RF plan database. 6.In-charge of all transmission of VSWR, D1s/SAMs and DRAFTs to other sections.

Actions steps
1.Manage TCH Availability 2. Optimize the Radio network environment 3. Optimize the call establishment & management process. 1. Make sure each cell in the network is performing properly all worst cells and provide an action plan. 2. Isolate 3. Make sure the number of worst cells in the network compared with the total network cells is kept as low as 1. TCH & SDCCH Resource management. 2. HR Implementations Enabling & disabling. 3. BTS Upgrades/Downgrades, new sites/minis follow up. 1. Follow network optimization requests with other sections. & Management of Optimization Databases. 2. Creation 3. Make sure all drafted Optimization Action plans are implemented in scheduled time. 1. Site redesigns LAC designs and Optimization. 2. Site/BSc Migrations follow up and validation. 3. Prepare and validate Cell Databases.

pecial projects (e.g. TMBs)

Candidates evaluation and selection) n of a Draft form)

DRAFTs to other sections.

General Objectives
1.Radio Measurements -Perform and Analyze Radio drive tests. -Analyze radio measurements and give reports to RF & Optimization engineers. up on the implementation of suggested actions suggested to -Follow optimization Performance Benchmarking 2.Network team after radio measurements -Prepare Monthly reports comparing Iraqna Network with Competitors' networks. -Prepare and follow up on network optimization/planning aimed at improving network performance. and validation). -Integration reports (processing 3.Network Performance Analysis -Perform initial trouble shooting of network problems. -Analyze the network problems through drive tests, Indoor Measurements and Daily Stats. 1.Network Quality of Service Management -Call Drop Rate(CDR) < 1% -Call Setup Success Rate (CSSR) > 95% -BI Call Setup Blocking Rate (CSBR) < 1.8% -BI TCH Blocking Rate (TBR) < 2% -BI SDCCH Blocking Rate (SBR) < 2%

Actions steps
1. Perform radio measurements. 2. Prepare reports identifying problems in the field. 3. Make sure RF & Optimizations teams act on the problems identified and also confirm the status in the field after implementation of the action plans. 1. Perform drive test and prepare reports to compare Iraqna and competitors performance. 2. Follow network optimization actions through field analysis. 3. Prepare integration reports for new sites under OTI responsibility. 1. Participate in trouble shooting of network problems 2. Isolate network problems use of Drive tests/Daily stats. 3. Use of necessary tools in trouble shooting TEMS, K15. 1. Perform radio measurements. 2. Prepare reports identifying problems in the field. 3. Make sure RF & Optimizations teams act on the problems identified and also confirm the status in the field after implementation of the action plans.

3.New sites Planning. 4.Validation of Drafts, VSWR and frequency planning Wos. 5.follow up the redesign for on air sites. 8. Site surveys for critical sites (eg Indoor coverage) and special projects (e.g. TMBs) 9.Follow up the updating of planning tool. 10. Handle all problems affecting the planet tool. 11. Follow up all upgrades of tool. 1.New site design planning. 2.Site survey (Site survey visit, Candidate nominations and Candidates evaluation and selection) 3.Technical site survey visit (Technical visits and Generation of a Draft form) 4-New site parameter planning (i.e. , frequency, neighbours, etc) 5-Integration report analyses(from quality team). 6.redesign the on air sites 5.responsible for maintenance and update of the RF plan database. 6.In-charge of all transmission of VSWR, D1s/SAMs and DRAFTs to other sections.