Vous êtes sur la page 1sur 8

back cover Size: A4 cover

Laying a
strong foundation
for a secure and
sustainable future

Jindal ITF Ltd.


Jindal ITF Centre, 28 Shivaji Marg,
New Delhi-110 015, India
Tel.: +91 11 45021983/984
Fax: +91 11 45021982
Email: info@jindalaquasource.com,
info@jindalecopolis.com
www.jindalitf.com

Part of the O.P. Jindal Group


inside front cover page 1

One vision.
One dream.
Adding value to life and

living.
The infrastructure arm of Jindal SAW Ltd., Jindal ITF is a part of
the US$ 12 billion O.P. Jindal Group (4th largest business house
in India) with established leadership positions in steel, mining,
power, energy, infrastructure, water, wastewater, solid waste Inspired by
nature.
management and waste to energy.

Jindal ITF continues to add economic and social value to the


economy and is making rapid strides with its ventures in
portable water, wastewater, industrial water management Driven by
services, waterborne transportation, municipal solid waste to
energy management and rail infrastructure - laying a strong
foundation for a secure and sustainable future. passion.
Jindal ITF is a driving impetus behind development of
sustainable infrastructure that matches global standards.
Venturing into new areas of business in various sectors,
Jindal ITF - the infrastructure arm of Jindal SAW Ltd. is
making rapid progress in sectors as diverse as:

Water, Wastewater and Solid Waste Management


Domestic Transport & Logistics
Transportation Equipment Fabrication
page 2 page 3

A clear future, JITF Aquasource


projects
drop by drop.
JITF Aquasource provides Total Water Solutions
and is committed towards innovative processes for
optimisation of Water and Wastewater Management.
Angul, Orissa
Projects are executed on: Raw Water Intake and
Concessions, Public Private Partnerships (PPP), Build, Cross- Country Pipeline
Own, Operate and Transfer (BOOT), Build, Operate and
Transfer (BOT), Engineering, Procurement and Contraction JITF Aquasource is executing this project
(EPC) with long term Operation and Maintenance (O&M). under Engineering, Procurement and
Contraction (EPC) category. Located Pipeline Laid Under River Bridge
Services: 200 Km from the capital city
• Raw water intake and conveyance systems Bhubaneswar, the project comprises
designing, civil engineering, construction,
• Water transmission pipelines and distribution systems
supply, laying, jointing and commissioning
• Drinking water treatment facilities of Raw Water Intake Pump House &
• Wastewater and effluent treatment plants Cross-Country Pipeline and Transmission
line from River Brahmani.
• De-salination plants
• Pre-treatment, de-mineralization and condensate Pipeline: 26.5 Km MS twin line
polishing units for the industry Pump House - Pump Floor
Total Investment: `239.4 Crore

Intake Pump House - Fore Bay Area

Area of Bridge & Railway Crossing


of Pipeline
page 4 page 5

JITF Aquasource JITF Aquasource


projects projects

Naya Raipur, Chattisgarh Barmer, Rajasthan


Development of Water Supply System Raw Water Cross Country Pipelines,
Reservoirs and Pumping System
JITF Aquasource is working with Naya Raipur
Development Authority for the development JITF Aquasource has received the project on
of Water Supply System in Naya Raipur under Operations & Maintenance (O&M) concession
a Build, Operate and Transfer (BOT) concession Set-up of Cement Mortar Lining Intake Pump House at Mohangarh framework for a period of 10 years. The project
frame-work. The project comprises designing, comprises Cross-Country Raw Water Pumping
development, operations and maintenance System that encapsulates the pipeline, one
of water supply/treatment facilities for a intake pumping station and three intermediate
concession period of 8 years. boosting stations for Lignite Fired Thermal
Power Project of 1080 MW (8x135) capacity.
Capacity: 102 MLD This project scope includes designing,
Revenue Model: Bulk water supply to the supplying, erecting, testing, commissioning and
client on annuity basis operations & maintenance of the project.
Total Investment: `150 Crore
Master balancing reservoir Intermediate Pump House at Kanod Pipeline: 184 KM
capacity: 3500 Kilo liter, 21 meters staging Total Investment: `311.95 Crores

Guniting in Progress Water Reservoir at Sangad

Plate Load Test in Progress Intermediate Pump House at Akal


page 6 page 7

A green earth,
JITF Aquasource
projects once again
JITF Ecopolis was set up with the key objective
of addressing the urban waste management
problem. JITF Ecopolis is all set to commission
Rajkot Municipal Corporation India’s first commercial Waste-to-Energy plant in
New Delhi and will be the largest-of-its-kind
Water Distribution Project operational in Asia.

JITF Aquasource was awarded this project in In a short span of two years of operations,
March 2010. The project scope includes designing JITF Ecopolis has been recognized for its efforts
and engineering of the sewage treatment plant of and won accolades.
Model of the Rajkot Project
45 MLD capacity and supply of treated water to the
industries in Rajkot. The project is based on Build, It has ambitious expansion plans and is actively
Own, Operate and Transfer (BOOT) Concession bidding for other similar projects.
Framework for a period of 30 years.

Capacity: 45 MLD
Revenue Model: Sale of Industrial Grade Tertiary
Treated Water
Total Investment: `100 Crore
Model of the Rajkot Project

Bhavnagar Municipal Sitarganj - Concession


Corporation Project: Design, Finance, Develop,
Construct, Commission, Operate,
Project: Build, Own, Operate and Transfer of Maintain and Manage - Common
Sewage Treatment Plant (STP) to Effluent Treatment Plant (CETP)
recycle Wastewater
Location: Eldeco Sidcul Industrial Park,
Capacity: 45 MLD STP and Distribution network Sitarganj, Uttrakhand
Client: Bhavnagar Municipal Corporation – Capacity: 4 MLD
Bhavnagar, Gujarat
Client: J ESIPL CETP Sitarganj LTD.
Contract: BOOT Concession agreement
Contract: Build, Own, Operate and Transfer
Scope: Design, Finance, Build, Supply, Deliver, (BOOT) model
Erect, Commission, Operate &
Scope: • Designing, Financing, Developing,
Maintain
Constructing, Commissioning,
• Sewage Treatment Plant Operating, Maintaining and
• Concession period 25 Years Managing SIDCUL-ELDECO SPV
• 45 MLD Water Treatment Plant • PPP Model EPC
• Pipeline & distribution, metering and • 29 Years O&M
collection • Tariff based on KPIs
• Pumping stations, reservoirs, pipeline
page 8 page 9

JITF Ecopolis
projects

Timarpur-Okhla Municipal
Solid Waste Management JITF Ecopolis

Project, New Delhi


Project Model
awards
India’s first commercial Waste-to-Energy plant
to generate 20MW of power by using 1950
tonnes (more than 200 truck loads) of
Municipal Solid Waste.

Set up with an investment of `200 crore, the


plant will use about a third of the daily Hon'ble CM of Delhi Smt. Sheila Dikshit
lays the foundation stone JITF Ecopolis receives
Municipal Solid Waste of Delhi, which stands at
anything between 6000 and 8000 tonnes per Frost & Sullivan
day. Thus helping resolve two critical issues
faced by New Delhi - municipal waste disposal Excellence Award
and power shortage.
The Frost & Sullivan Environment Excellence
This project is registered with UNFCCC for Awards are given in recognition of the inspiring
earning carbon credits. and exemplary achievements by companies
operating in the environment industry.
Project Model: Build, Own, Operate and Transfer Project Work in Progress
(BOOT) JITF Ecopolis received the coveted Frost &
Sullivan Excellence Award for the ‘Waste-to-
NDMC and MCD will be providing the waste Energy Deal of the Year 2010’ in the Municipal
free of cost. Waste-to-Energy segment.

This initiative targets to bring electricity to more This award was received in recognition for India’s
than 600,000 homes in India. first commercial Waste-to-Energy plant to generate
20MW of power by using 1950 tons (more than
200 truck loads) of municipal solid waste. CEO, Allard M. Nooy
Project Work in Progress receiving the prestigious award
page 10 page 11

Jindal Manila Water Development


Company
Jindal Manila Water Development Company (JMWDC) is a
50:50 partnership / joint venture between JITF Water
Infrastructure Ltd and Manila Water Company Inc.

Manila Water Company Inc. is engaged in construction, Primary Sedimentation Plant


operation, management, maintenance, rehabilitation, and
expansion of waterworks, wastewater and treatment facilities
related to the provision of water supply and sewerage
services; it also has ongoing operations in Vietnam & Australia.

The partnership aims to


Every success story - Bring world-class Water and Wastewater Services

starts with a - To pool resources and core strengths to undertake projects

dream.
in the areas of:
Basin Top View
• Concession Contract
• Long-Term Operation and Maintenance
• Build, Own, Operate and Transfer (BOOT)/Build, Operate

And continues with partnership. and Transfer (BOT)


• Technology and Advanced Process Solutions
- Non Revenue water reduction Solutions
- 24 x 7 water supply

Manila Water is guided by the principle of sustainable growth Dam Water Source
in its efforts to provide quality drinking, affordable and
reliable water, wastewater and environmental services to the
communities it serves.

Manila Water has been acclaimed as a shining example of a


successful public-private partnership not only in the
Philippines but even in the international community.

MWC Pumphouse
page 12 inside back cover

Transport solutions

for today
& tomorrow.
Jindal ITF Kobelco Eco Limited Other business interests of Jindal ITF span across a gamut of transport
solutions addressing the varied needs of the Indian economy.

JITF Water Infrastructure Ltd and Kobelco Eco -


Solutions Co Ltd jointly entered into water
treatment market in India combining the technical
and financial resources. KOBELCO ECO-SOLUTIONS
is the core environmental business of the Jindal Vector is setting new standards in cargo
KOBE STEEL Group, Japan. KES Head Office
transportation along the Indian coastline and
inland waterways. With a fleet of eight vessels,
The alliance is dedicated to offer reliable and including five Container Ships, options from
sophisticated solutions in the Indian water market. Short Sea Shipping Containers to Break Bulk
Kobelco-Eco Solutions offering solutions that strive Ships… and an assurance of reliability.
to find the best way to live in harmony with the
natural environment and contribute to local
communities. Its strong presence, diverse expertise
and established knowledge base allow it to identify
opportunities, optimize resource utilization and
share best practice and lessons learnt globally. KES Harima Plant With the development of the India Maritime
Technology Park in Gujarat
Kobelco Eco-Solutions Group’s environmental as the state's first maritime industry cluster, JITF
activities include the treatment of water and Shipyards is moving
wastewater, industrial water, pure water, and swiftly towards new frontiers.
wastewater, as well as wastewater treatment and
recycling, PCB detoxification, plant construction that
includes industrial/regional cooling and heating towers,
and maintenance and inspection services.

The alliance prides itself in the ability to tailor


KES Technical Research Centre Jindal Rail Infrastructure at its 120 acre Vadodara
solutions for its clients.
site is manufacturing wagons using aluminum
and steel that weighs less, and create greater
space inside. This intelligent use of resources will
result in carrying additional resources of nearly
240 tonnes.

Vous aimerez peut-être aussi