SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008)

Rev 3 SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Soil Sampling, Testing and Review of Test Reports
PROJECT TITLE

30-Jun-08 DATE APPROVED QR NUMBER

SAIC-A-1001
WBS / BI / JO NUMBER

20-Feb-10

CIVIL-

C-117

CONTRACTOR / SUBCONTRACTOR

SHAYBAH RESIDENTIAL AND INDUSTRIAL COMPLEX FACILITY EXPANSION PROJECT


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION

10-00774-0001
EQPT CODE SYSTEM ID.

MMG
PLANT NO.

N/A
LAYOUT DRAWING NUMBER

SAMPLING OF SAND FILL MATERIAL


REV. NO. PURCHASE ORDER NUMBER QUANTITY INSP. EC / PMCC / MCC NO. MH's SPENT TRAVEL TIME WORK PERMIT REQUIRED?

BORROW PIT # 2, SABKHA 113


SCHEDULED INSPECTION DATE & TIME

N/A
ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER

09/21/2011 08:00 AM
SAUDI ARAMCO TIP NUMBER

SAUDI ARAMCO USE ONLY

SATIP-A-114-01
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

1.1
RH/H

RH/H
REFERENCE PASS FAIL N/A RE-INSP DATE

ITEM No. A

ACCEPTANCE CRITERIA Laboratory Testing All quality tests and sampling shall be performed by a Saudi Aramco approved laboratory in the presence of Contractor and Saudi Aramco Representatives. The laboratory's Quality Personnel assigned to the Work must be technically competent to perform their duties and shall have a recommendation for approval from Saudi Aramco to perform applicable Tests. Tests are performed in accordance to applicable Standards in the presence of Contractor and Saudi Aramco Representatives. Gradation, density and moisture content control test are performed at the following frequencies: one standard sieve analysis (ASTM C 136, ASTM D 422 or ASTM D 1140) and one Modified Proctor Test per ASTM D 1557 with corresponding Proctor curve for each type of fill material or where there is a change in the type or source of the material. For cohesionless free draining soils, ASTM D4253 Maximum Index Density and Unit Weight of Soils Using a Vibratory Table and ASTM D 4254 Minimum Index Density and Unit Weight of Soil & Calculation of Relative Density shall also be performed. Fill Materials Fill materials consists of gravel, sand and/or marl. The maximum size of fill materials shall be one-half ( ) the lift thickness or 75mm, whichever is less. Select Fill Materials The amount of material passing the 50mm sieve shall be 100%. The amount of material passing the No. 200 sieve shall be between 020%. The portion of the material passing the No. 40 sieve shall have a maximum Liquid Limit (LL) of 35 and Plasticity Index of 12 as per ASTM D 4318.

A1

SAES A-114 Section 5.1.1

A2

Schedule "Q" Section 5.5 Schedule "Q" Section 1.4

A3

A4

SAES-A-114 Sec. 6.3.3.1

A5

SAES-A-114 Sec. 6.3.3.1

B1

SAES-A-114 Sec. 6.2.1 SAES-A-114 Sec. 6.2.1

B2

C1

SAES-A-114 Sec. 6.2.2 SAES-A-114 Sec. 6.2.2

C2

C3 Note: Liquid Limit and plastic limit tests are not required if material has less than 15% passing the No.200 sieve.

SAES-A-114 Sec. 6.2.2

1 of 2

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008)

Rev 3 SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Soil Sampling, Testing and Review of Test Reports
PROJECT TITLE

30-Jun-08 DATE APPROVED QR NUMBER

SAIC-A-1001
WBS / BI / JO NUMBER

20-Feb-10

CIVIL-

C-117

CONTRACTOR / SUBCONTRACTOR

SHAYBAH RESIDENTIAL AND INDUSTRIAL COMPLEX FACILITY EXPANSION PROJECT


ITEM No. D ACCEPTANCE CRITERIA Marl Cap Materials The maximum size of fill materials shall be one-half ( ) the lift thickness or 75mm, whichever is less. The amount of material passing the No. 200 sieve shall be between 1135%. Capping materials shall have a maximum Liquid Limit (LL) of 35 and a maximum plasticity index of 12 as per ASTM D4318.

10-00774-0001
REFERENCE PASS FAIL

MMG

N/A

RE-INSP DATE

D1

SAES-A-114 Sec. 6.3.2.10 SAES-A-114 Sec. 6.3.2.10 SAES-A-114 Sec. 6.3.2.10

D2

D3

REMARKS:

TO WITNESS FOR THE SAMPLING OF SAND AT BORROW PIT # 2, SABKHA 113,

REFERENCE DOCUMENTS: 1- SAES-A-114 -- Excavation and Backfill, 28 April 2004 2- Schedule Q

Contractor / Third-Party
Construction Representative*
Name, Initials and Date: Work is Complete and Ready for Inspection:

Saudi Aramco
PMT Representative
Name, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

MR. MAOYED
Performed Inspection Work / Rework May Proceed

MR. GENE PERALTORE


T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Name, Initials and Date:

PID Representative

MR. ZIAUL HAQ


Quality Record Approved:

Name, Initials and Date:

MR. M. MAGALLANES Jr.


T&I Witnessed QC Record Reviewed Work Verified

QC Supervisor
Name, Sign and Date:

Proponent and Others

MR. M. NICOLAS

Name, Organization, Initials and Date:

*Person Responsible for Completion of Quality Work / Test

Y = YES

N = NO F = FAILED

2 of 2