Introduction of current situation and policy on energy and natural Introduction of Power of Laoin Lao PDR resources Sector PDR
Presented by: Bounsy DETHAVONG Soulivong DARAVONG Deputy Manila, 4th June,2012
Minister of Energy and Mines Lao PDR Director of DEM 2009 Vientiane, 6 May
___________________________________________________ _______
Title of Presentation
1. Introduction of Power sector 2. Power Sector policy 3. Power Sector management
Increase a share of bio-fuel consumption in Transport Sector up to 30% by 2020; Establish a National Policy of Renewable Strategic Policy; Establish a National Strategic Plan for Biofuel development.
Development Status
65 Projects with estimated installed capacity of 20,000 MW Projects at Feasibility Study stages/with Memorandum of Understanding (MOU): 35 Projects with estimated installed
capacity of 7.270 MW
Projects at Preparation stage/with Project Development
Ownership of Generation
Installed Capacity: 2,534.2 MW: EdL 875 MW 2004 IPP: 1.639.2 MW, Provincial: 20 MW 2.9% 0.789 PROVINCES
IPP
EDL
44.6% 34.52
52.5% 64.68
EDL
IPP
PROVINCES
3.
Power Sector monitoring, inspection and examination were followed by Legal system for example Electricity Law, Water and Water resources Law, Environmental Law, Land Law, Forestry Law,Lao Electric Power Technical Standards and so on and so fort.
Project Development Agreement (PDA) Feasibility Study (FS) Design Criteria with Basic Design
(Form2 and Drawings)
Tender Documents
(Detailed Technical Specifications)
( construction stage )
Construction
Completion Certificate
Commencement of Operation