Académique Documents
Professionnel Documents
Culture Documents
16:00-16:50 FE-1 Water transfer from SM Rodnik water tank 1. Close-out ops
16:05-17:35 CDR Physical Exercise (TVIS), Day 3
17:00-17:25 FE-1 On-Orbit Hearing Assessment with EarQ Software
17:25-18:25 FE-1 Physical Exercise (RED)
17:35-18:35 CDR Ethernet cable installation from BRI to MPEC coder
18:25-19:15 FE-1 Emergency, Warning Book Update
18:35-18:45 CDR RED bolt maintenance
18:35-18:50 FE-2 EPO - Plant Photos
18:50-19:00 FE-2 O2 level check
19:00-19:05 FE-2 Transfer TVIS/RED/CEVIS/HRM data to MEC
19:10-19:15 FE-2 SSC file server reboot
19:15-19:20 FE-2 OCA SSC router reboot
19:20-19:35 Daily Planning Conference (S-band)
19:35-20:05 DINNER
20:05-20:30 Daily Food Prep
20:30-21:30 CDR, FE-2 Pre-sleep
20:30-21:25 FE-1 Pre-sleep
21:25-21:30 FE-1 Water transfer from SM Rodnik water tank 1. Close-out ops
21:30-06:00 SLEEP
Task List FE-1 GSF-JAXA. ТБУ temperature monitoring (in the morning)
Note: See OSTP for references to US activities.
End of Radiogram