Radiogram No. 6024nu Updated Form 24 for 08/31/07


ПЗУ Memory Unit Replacement and Test with ВД-СУ Mode off/on and БИТС2-12 Power off/on
GMT CREW ACTIVITY

06:00-06:10 Morning Inspection


06:10-06:40 Post-sleep
06:40-07:30 BREAKFAST
07:30-07:55 Prep for Work
07:55-08:10 Daily Planning Conference (S-band)
08:10-08:15 Prep for Work
08:15-08:30 ISS Crew and ГОГУ (RSA Flight Control Team) Weekly Conference (S-band)
Cleaning FGB ГЖТ [Gas-Liquid Heat Exchanger] detachable screens 1, 2, and
08:30-09:30 CDR
3
09:30-10:30 CDR Screen cleaning in FGB fans ЦВ1 and ЦВ2
08:30-10:00 FE-2 Physical Exercise (TVIS)
On MCC-M Go Replacement of ПЗУ-А [ROM-A] ЮА114М in БИТС2-12
08:30-09:05 FE-1
ТА968МА (ПЦБ) [Central Unit Subsystem]. Tagup (S-band)
09:05-11:05 FE-1 CARDIOCOG. Experiment ops
10:00-11:00 FE-2 Physical Exercise (RED)
11:00-12:30 FE-2 Water container transfers
11:00-12:00 CDR Physical Exercise (RED)
11:05-11:20 FE-1 PLANTS-1. MIS-LADA mode change
11:25-11:30 FE-1 Weekly maintenance of TVIS bearings
Elektron activation and temperature monitoring on Secondary Combustion Unit
11:30-11:40 FE-1
(БД)
11:40-13:10 FE-1 Physical Exercise (TVIS), Day 3
Config setup to transfer water from Progress 361 Rodnik water tank 1 to SM
12:00-12:40 CDR
Rodnik water tank 1, and flush Gas-Liquid Separator [ГЖС]
12:30-12:45 FE-2 Power panel reconfig to connect CBCS
12:45-13:15 FE-2 Reconfig of Node1 distribution panel
13:10-13:25 CDR, FE-1 IMS tagup (S-band)
13:25-14:25 LUNCH
14:25-14:45 FE-2 IMS update
14:25-14:30 FE-1 Compressor activation for water transfer
14:30-14:45 CDR, FE-1 Conference with correspondent of Rossiyski Kosmos magazine (S-band)
14:45-15:05 Flight Director / ISS Crew Tagup (Ku + S-band)
Transfer water from Progress 361 Rodnik Water Tank БВ1 to SM Rodnik Water
15:05-15:10 FE-1
Tank БВ1 (monitoring)
15:05-15:45 CDR СОЖ Maintenance
15:05-15:35 FE-2 On-Orbit Hearing Assessment with EarQ Software
Transfer water from Progress 361 Rodnik Water Tank 1 to SM Rodnik Water
15:30-16:00 FE-1
Tank 1 (monitoring)
15:35-18:35 FE-2 Water container transfers
15:45-16:05 CDR On-Orbit Hearing Assessment with EarQ Software
Page 2 of 2

16:00-16:50 FE-1 Water transfer from SM Rodnik water tank 1. Close-out ops
16:05-17:35 CDR Physical Exercise (TVIS), Day 3
17:00-17:25 FE-1 On-Orbit Hearing Assessment with EarQ Software
17:25-18:25 FE-1 Physical Exercise (RED)
17:35-18:35 CDR Ethernet cable installation from BRI to MPEC coder
18:25-19:15 FE-1 Emergency, Warning Book Update
18:35-18:45 CDR RED bolt maintenance
18:35-18:50 FE-2 EPO - Plant Photos
18:50-19:00 FE-2 O2 level check
19:00-19:05 FE-2 Transfer TVIS/RED/CEVIS/HRM data to MEC
19:10-19:15 FE-2 SSC file server reboot
19:15-19:20 FE-2 OCA SSC router reboot
19:20-19:35 Daily Planning Conference (S-band)
19:35-20:05 DINNER
20:05-20:30 Daily Food Prep
20:30-21:30 CDR, FE-2 Pre-sleep
20:30-21:25 FE-1 Pre-sleep
21:25-21:30 FE-1 Water transfer from SM Rodnik water tank 1. Close-out ops
21:30-06:00 SLEEP
Task List FE-1 GSF-JAXA. ТБУ temperature monitoring (in the morning)
Note: See OSTP for references to US activities.
End of Radiogram