Demolition Work 1. Personals involve 1. Site Supervisor 2. General workers 3. Breaker Operator 4. Backhoe Operator 5.

Dump Truck Driver 2. Equipment Involve 1. Breaker 2. Backhoe 3. Dump truck 4. Electrical Breaker 5. Electrical Cutter 3. Methodology 1. Site Supervisor will brief to all personal on the location work and existing power supply cable route (if any) 2. Power supply point for the tools must be agreed by TNB and position of supply cable shall not obstruct or endanger other concurrent work. 3. Any existing electrical supply located in the demolition work area shall be decommission. 4. Firstly, determine plinth to be demolish and push a side stone chipping. 5. Then, breaker shall break the plinth foundation. All foundation debris will be hauled and dump outside from PMU area. 6. All hole of ex-plinth will be fill with earth and stone chipping on top. 7. After all demolished debris taken out from site, existing platform shall be level. 4. Safety precautions 1. Proper PPE must be wear during the work. 2. All electrical supply to existing store to be shut off. 3. Worker must be caution for traffic during the work. 4. Protect any live equipment near to demolition work. 5. Workers should be caution of any flying debris from demolition work.

Vous aimerez peut-être aussi