BILL OF MATERIALS AND COST ESTIMATE

PROJECT: A TWO-STOREY DUPLEX RESIDENCE


LOCATION: #18 Pines Street Green View Executive Village, Diliman Quezon City
OWNER:
Mr. And Mrs. Ben Hur C. Florendo
SHEET NO. : 1A OF 4
ESTIMATED BY: Arch. Maria Khristina F. Cao
DATE: February 15, 2012

ITEM NO.

DESCRIPTION

QUANTITY

UNIT

UNIT
PRICE

1.0 MOBILIZATION WORKS


1.1
Furnishing of Materials
Furnishing of Tools
Furnishing of Equipment

AMOUNT
25,000.00

Transportation of
Manpower
2. 0

3.0

LAYOUT, SITE, & EARTHWORKS


Layout & Stalking

12.00 lot

350.00

87,667.20
4,200.00

Site Cleaning
Temporary Facility

10.00 Lot
1.00 Lot

250.00
12,000.00

10,000.00
12,000.00

Soil Poisoning
Excavation
Backfilling & On - filling
Gravel Bedding

1.00
60.00
35.63
15.25

5,000.00
250.00
800.00
850.00

5,000.00
15,000.00
28,504.00
12,962.20

lot
Cu. m
Cu. m
Cu. m

STRUCTURAL WORKS
3.1

3.2

Column Footing
Portland Cement
Sand
Gravel
Reinforced Bars
#16 Tie Wire

9.94
2 ,000 bags
90.16 cm
75.6
1043.92
740 Pcs.

1,281,239.00
611,010.00
200.00
400,000.00
600
54,090.00
950
71,820.00
115

85,100.00

bags
cm

200
600
950

85,948.07
9600.00
3,360.00
9,927.50

Bdft.
Pcs.

25
300

15,387.75
42,000.00

Beam 1
Portland Cement
Sand
Gravel
Rebar / Steel
Form Lumber
6mm x 120mm marine
plywood

48
5.60
10.45
4,562.40
615.51
140

BILL OF MATERIALS AND COST ESTIMATE


PROJECT: A TWO-STOREY DUPLEX RESIDENCE
LOCATION: #18 Pines Street Green View Executive Village, Diliman Quezon City
OWNER:
Mr. And Mrs. Ben Hur C. Florendo
SHEET NO. : 1A OF 4
ESTIMATED BY: Arch. Maria Khristina F. Cao
DATE: February 15, 2012
4 CWN

1 Cwn
Form Oil
#16 tie wire
3.3

Form Lumber
6mm x 120mm marine
plywood
4 CWN

1 Cwn
Form Oil
#16 tie wire
Beam 3
Portland Cement
Sand
Gravel
Rebar / Steel
Form Lumber
6mm x 120mm marine
plywood
4 CWN

1 Cwn
Form Oil
#16 tie wire
3.4

60.00

879.00

6.94 Kg

65.00

415.10

40.00
14.68 Kg.

115

168.82

Beam 2
Portland Cement
Sand
Gravel
Rebar / Steel

3.4

14.65 Kg.

Beam 4
Portland Cement
Sand

98,970.55
54.00 bags
3.00 cm
6.00
4,562.40

200
600
950

10, 800.00
18,000.00
5,700.00
4, 562.40

701.91 Bdft.
130 Pcs.

25
300

17,547,75
39,000.00

60.00

961,20
514.80
45.00
1,840.00

16.02 Kg.
7,92 Kg
45.00
16.00 Kg.

15
.18
.36
4,562.40
51.01
1.00

65.00
115

bags
cm

200
600
950

Bdft.
Pcs.

25
300
60.00

3000.00
108.00
332.50
4,562.40
1,275.25
300.00

1.16 Kg.
.18 Kg
4.00 Li

65.00
90.00

696.00
11.70
3,600.00

.99 Kg.

115

11,385

4.00 bags
.22 cm

200
600

800.00
132

BILL OF MATERIALS AND COST ESTIMATE


PROJECT: A TWO-STOREY DUPLEX RESIDENCE
LOCATION: #18 Pines Street Green View Executive Village, Diliman Quezon City
OWNER:
Mr. And Mrs. Ben Hur C. Florendo
SHEET NO. : 1A OF 4
ESTIMATED BY: Arch. Maria Khristina F. Cao
DATE: February 15, 2012
Gravel
Rebar / Steel
Form Lumber
6mm x 120mm marine
plywood
4 CWN

1 Cwn
Form Oil
#16 tie wire
3.4

Floor Beam
Portland Cement
Sand
Gravel
Rebar / Steel
Form Lumber
6mm x 120mm marine
plywood
4 CWN

1 Cwn
Form Oil
#16 tie wire
3.4

Column
Portland Cement
Sand
Gravel
Rebar
Form Lumber
6mm x 120mm marine
plywood
4 CWN

1 Cwn
Form Oil

950

418.00

25
300

4,562.40
1,241.50
300.00

1.00 Kg.

60.00

60.00

.95 Kg

65.00

61.75

4.00 Li
21.82 Kg.

90.00
115

3,600.00
2,508.15

71.00 bags

200

14,200.00

3.91 cm
7.82
4,562.40
Bdft.
1.00 Pcs.

600
950

2,346.00
7,419.50
4,562.00

.44
4,562.40
49.65 Bdft.
1.00 Pcs.

20.88
10.32
51.00
21.82

123.00
6.79
13.58
1,967.60
1,104,90
31

25
300

Kg.

60.00

Kg

65.00

Li
Kg.

115

bags
cm

200
600
950

Bdft.
Pcs.

25
300

54.32 Kg.
26.89 Kg
153.08 Li

60.00

65.00

300
1,252.80
670.80
51.00
2,509.30

24,600
4,074.00
12,901
1,967.60
27,615.50
9,300
3,259.20
1,682.85
153.08

BILL OF MATERIALS AND COST ESTIMATE


PROJECT: A TWO-STOREY DUPLEX RESIDENCE
LOCATION: #18 Pines Street Green View Executive Village, Diliman Quezon City
OWNER:
Mr. And Mrs. Ben Hur C. Florendo
SHEET NO. : 1A OF 4
ESTIMATED BY: Arch. Maria Khristina F. Cao
DATE: February 15, 2012
#16 tie wire
3.5

3.5

Slab on Grade
Portland Cement
Sand

46.31 Kg.

115 5,325.85

919.00 bags
51.03 Cm

200
600

183,000.00
30,618.00

Gravel

102.05

950

96,9447.50

Gravel Bedding
10 mm Rebar
#16 Tie wire

102.05
153.05 Kg.
8.16 Kg.

25
300

102.05
3,826.25
2, 448.00

Wall Footing
Portland Cement
Sand
Gravel
Gravel Bedding
10 mm Rebar
#16 Tie wire

4.0 MASONRY W0RKS


A
ROUGHING WORKS
4.1
6 CHB (Wall Plastered)
Portland Cement
Sand
10mm Deformed bar
#16 Tie wire
6 CHB
4.2
4 CHB (Wall plastered) or Fastem
Portland Cement
Sand
10mm Deformed bar
#16 Tie wire
4 CHB

42.00
2.30
4.60
2.30
312.53
4.87

bags
Cm

42.00
2.30
4.60
2.30
312.53
4.87

Kg.
Kg.

254,685.28
223.40
360.34
30.02
158.61
9.38
2,792.48
319.16
359.05
29.94
226.60
13.40
3,989.48

Sq,m
bag
Cm
Kg.
Kg.
Pcs.
Sq,m
bag
Cm
Kg.
Kg.
Pcs.

125,300.14
205..00
550.00
40,00
69.00
10.00
131,975.98
205..00
550.00
40,00
69.00
10.00

BILL OF MATERIALS AND COST ESTIMATE


PROJECT: A TWO-STOREY DUPLEX RESIDENCE
LOCATION: #18 Pines Street Green View Executive Village, Diliman Quezon City
OWNER:
Mr. And Mrs. Ben Hur C. Florendo
SHEET NO. : 1A OF 4
ESTIMATED BY: Arch. Maria Khristina F. Cao
DATE: February 15, 2012
4.3

4.3

Concrete Topping ( For slab)


Portland cement
Sand
Others
Glass Blocks

FINISHING WORKS
TILES
200 X 200 MM
300 X 300 MM
Tile Mortar (Ordinary tile)
Portland Cement
White cement
sand
Polished Ceramic (granite)
tiles
400 x 400 mm

363.52 Sq. M
109.06 Bag
9.06 cm

205.00
550.00

96.00 Pcs.

120.00

27,354.00
22,357.00
4,9833.00
11,520.00
11,520.00

35.00
65.00

389,551.05
12,410.00
7,66.005
4,745.00

219.00 Pcs.
73.00 pcs
1.80
1.00
1.00
1.00

Sq. m
bag
bag
Cu m

205.00
110.00
555.00

Sq m
210.00 pcs

865.00
205.00
110.00
550.00
94,950.00

450.00

94,950.00

5.0

CARPENTRY WORKS
Cabinets, closets, shelves,
woodworks

7.0

FENESTRATION WORKS

328.840.00

DOORS

103,500.00
Aluminum metal Glass Doors
Steel Door
Solid Panel Door
Venner Flush door

180,000.00

sqft
1.00 Sets
3.00 sets
4.00 pcs

380.00
10,000.00
8,00.00
5,00.00

BILL OF MATERIALS AND COST ESTIMATE


PROJECT: A TWO-STOREY DUPLEX RESIDENCE
LOCATION: #18 Pines Street Green View Executive Village, Diliman Quezon City
OWNER:
Mr. And Mrs. Ben Hur C. Florendo
SHEET NO. : 1A OF 4
ESTIMATED BY: Arch. Maria Khristina F. Cao
DATE: February 15, 2012
Steel gate
B
WINDOW
Aluminum Framed Glass
Window / roof
7.0

18.00 m

2,750.00
225,340.00

593.00 ft

HARDWARE

380.00

LS

225,340.00

40,000.00

Hinges
Drawer Guide
Locksets
Roller Catches
8.0

9.0

PAINTING WORKS
9.1

Exterior Wall

223.40 m

380.00

84,892.00

9.2

Interior Wall

319.16 m

350.00

111.706.00

9.3

Ceiling

279.31 m

320.00

88,379.20

9.4

Steel

310.00

0,00

9.5

Wood Surface

88.00 m

330.00

29,040.00

140.00

185,933.00
140.00
140.00

205.00
550.00
580.00

20,543.00
6,970.00
1,650.00
1,740.00

PLUMBING WORKS
9.1
Catch Basin
12 Square W.I. Floor Drain
9.2

285,977.00

Septic Tank
Cement
Sand
3/4 Gravel

serts
1.00 pcs
9.00
34.00
3.00
3.00

Cu. M.
bags
Cu. m
Cu.

BILL OF MATERIALS AND COST ESTIMATE


PROJECT: A TWO-STOREY DUPLEX RESIDENCE
LOCATION: #18 Pines Street Green View Executive Village, Diliman Quezon City
OWNER:
Mr. And Mrs. Ben Hur C. Florendo
SHEET NO. : 1A OF 4
ESTIMATED BY: Arch. Maria Khristina F. Cao
DATE: February 15, 2012
Rebar
#16 Tie wire
4 CHB
6 CHB
100 mm dia Tee

45.00
8.00
37.00
169.00
3.00

100 mm dia PVC


9.3

Fixtures
Kitchen Sink
Lavatory
Water Closet
Floor Drain
Soap Holder
Tissue Holder
Cleanout
Lavatory Faucet
Kitchen Faucet
Hose BIbb
Gate / check / Ball valve
Water Meter
9.5
Roughing in

ELECTRICAL WORKS
Ceiling Outlet
Refrigerator Outlet
Aircon outlet
Panel Board
50 amp,60 amp, 125 amp
Roughing in
11.0
SCAFFOLDING
12.00
DEMOBILIZATIN WORKS
TOTAL

kgs
pcs
pcs
pcs
Pcs

150.00
69.00
8.00
10.00
65.00

6,750.00
552.00
296.00
1690.00
195.00

2.00 pcs

350.00

700.00

2
2
5
3
4
4
8
2
2
6
13
1

set
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
LS

2,600
785
2, 800
60
320
460
30
200
200
80
120
2500
136,000.00

10.0

157,154.80
5,600
1570
14000
180
1280
1440
240
400
400
480
1560
2500
136,000.00
222,900.00

1.00
1.00
1.00

pcs
Pcs
pcs

152.00
888.00

LS
set
LS

130.00
65.00
65.00
2 , 500.00
1, 450.00
170.00

2 , 500.00
220,400.00
150,960.00
40, 000.00
3,060,356.08

BILL OF MATERIALS AND COST ESTIMATE


PROJECT: A TWO-STOREY DUPLEX RESIDENCE
LOCATION: #18 Pines Street Green View Executive Village, Diliman Quezon City
OWNER:
Mr. And Mrs. Ben Hur C. Florendo
SHEET NO. : 1A OF 4
ESTIMATED BY: Arch. Maria Khristina F. Cao
DATE: February 15, 2012
SUMMARY:

BILL OF MATERIALS AND COST ESTIMATE


PROJECT: A TWO-STOREY DUPLEX RESIDENCE
LOCATION: #18 Pines Street Green View Executive Village, Diliman Quezon City
OWNER:
Mr. And Mrs. Ben Hur C. Florendo
SHEET NO. : 1A OF 4
ESTIMATED BY: Arch. Maria Khristina F. Cao
DATE: February 15, 2012
Summary:
1.0 MOBILIZATION WORKS
2. 0

LAYOUT, SITE, & EARTHWORKS

3.0

STRUCTURAL WORKS

4.0 MASONRY W0RKS


7.0
FENESTRATION WORKS
7.0
HARDWARE
8.0
PAINTING WORKS
9.0
PLUMBING WORKS
9.3
Fixtures
10.0 ELECTRICAL WORKS
11.0
SCAFFOLDING
12.00
DEMOBILIZATIN WORKS
TOTAL

25,000.00

LS

888.00

set
LS

170.00

87,667.20
1,281,239.00
254,685.28
328.840.00
40,000.00
285,977.00
185,933.00
157,154.80
222,900.00
150,960.00
40, 000.00
3,060,356.08

Vous aimerez peut-être aussi