The concrete for speedier formwork turnaround

Low Cost Apartment in Shah Alam, Selangor

Desaminium Resort Development

The special formulation of the concrete mix allows the concrete to achieve a high early strength of 10 N/mm2 in 12 hours.

Applications
UltraRapid10@12 is designed to achieve high early strength of 10 N/mm2 in 12 hours with a pumpable characteristic. UltraRapid10@12 can be used for the following structures: Residential and commercial structures Precast and prestressed concrete Bridges and civil engineering projects Any structure that requires high early strength

4. Di m e n s i o n a l a c c u r a c y a n d g o o d watertightness
Dimensional accuracy in repetitive units allows minimal construction joints during the casting of UltraRapid10@12 and the monolithic structure eliminates leakage problems at the joints.

5. Reduce labour cost and total project cost


UltraRapid10@12 shortens the construction period with easier placement of concrete and faster turnaround of formwork. Labour costs are reduced with minimised plastering works due to its smooth finishing and good workability. Therefore the total project cost is reduced (refer to Figure 3).

Due to ease of placement, large pour sizes are achievable with reduced labour and machinery requirements.

Technical Characteristics
Slump Typical Initial Setting Time Typical Final Setting Time Compressive Strength at 12 Hours Compressive Strength at 28 Days Compliance 100 + 25 mm 4 to 6 Hours 5 to 7 Hours 10 N/mm2

Site Practice
UltraRapid10@12 can be placed by crane or pump. As UltraRapid10@12 is designed to a specific set of criteria, the addition of water on site is strictly forbidden. The formwork must be constructed and checked to ensure that it remains tight and rigid. (refer to Figure 1)

Above 30 N/mm
2

MS 523 & BS 5328

Benefits
1. High early strength for faster removal of formwork
UltraRapid10@12 is able to achieve 10 N/mm2 in 12 hours. With the early strength gain,formworks can be removed sooner and concrete can withstand construction loads earlier than normal concrete. UltraRapid10@12 works very well with standard repetitive units to reduce construction time.

Pix not sharp. need high-res. scan

2. Go o d w o r k a b i l i t y, p u m p a b i l i t y a n d placability
UltraRapid10@12 allows 75 mm to 125 mm (3 - 5 inches) slump. With the designed slump, concrete workability, pumpability and placing qualities are improved.
Figure 1 : Desaminium Resort Development in Serdang, Selangor

3. Good surface appearance and increased surface durability, with minimal honey combing and rubbing cost
UltraRapid10@12 is easier to pump, place and finish, resulting in a more uniform, denser, smoother and better surface appearance. A quality surface with minimal finishing operations and touch-ups can also reduce finishing costs (and labour costs). Finishing can commence immediately after the removal of theformwork due to its early strength characteristic.

Pix not sharp. need high-res. scan

Staff Quarters in Kuala Lumpur General Hospital

Compressive Strength Development 45

Compressive Strength (N/mm2)

40 35 30 25 20 15 10 5 0 0 5 10 3 Days 30 N/mm2 3 Days 15 N/mm2 7 Days 24 N/mm2

14 Days 34 N/mm2

28 Days 40 N/mm2 28 Days 37 N/mm2

UltraRapid10@12

G30P

14 Days 30 N/mm2 7 Days 30 N/mm2

15 10
15 Days

1 Day 13 N/mm2

12 Hours 10 N/mm2 1 Day 9 N/mm2 12 Hours 6 N/mm2

5
Figure 2 : Typical Compressive Strength Development Graph for Normal Concrete and UltraRapid10@12

Type of System Formwork

Day 1 2 3 4 5

6 7 8 9 10 11

Using Normal Concrete


Wall: Rebar Formwork Concreting Min Period to strike formwork Slab: Formwork BRC Concreting Min period to strike formwork

Reference Sites
The information given in this leaflet is based on our past projects; it should be considered indicative. Our experts are always ready to answer any specific questions that you may have.
Savings of 3 Days per Cycle

Using UltraRapid10@12
Wall: Rebar Formwork Concreting Min Period to strike formwork Slab: Formwork BRC Concreting Min period to strike formwork

Desaminium Resort Development by Desaminium Jaya Sdn Bhd (40,000m3) from year 2001 to 2002 Mixed Development at Kulai, Johor by PJD Construction Sdn Bhd (5,000m3) from year 2002 to 2003 Apartment at Precinct 9, Putrajaya by Setia Precast Sdn Bhd (60,000m3) from year 1997 to 2000 2 Blocks of 18-Storey Low Cost Apartment at Pantai Dalam, Kuala Lumpur by KLJ Builders for Syarikat Perumahan Negara (20,000m3) from year 2003 to 2004 2 Block of Staff Quarters in Kuala Lumpur General Hospital by Ribaru Bina Sdn Bhd (10,000m3) from January to September 2003 800 units of Low Cost Housing in Section 7, Shah Alam by Pembinaan Tegap Tunas Sdn Bhd (2,500m3) from September to October 2003 Low Cost Apartment in Bukit Raja, Klang by R & W Managment Sdn Bhd (2,000 m3) from January to November 2003 Tiara Bay Apartment in Port Dickson by PJD Marketing Sdn Bhd (6,000m3) from April 2002 to 2004 Desaminium Resort Development by Desaminium Jaya Sdn Bhd (40,000 m3) from year 2001 to 2003 Mixed Development project at Kulai, Johor by PJD Construction Sdn Bhd (5,000m3) from year 2002 to 2003 Apartment in Precint 18, Putrajaya by Prinsiptek (M) Sdn Bhd (564m3) in 2005

Typical Concreting Schedule - Tunnel Form System


Type of System Formwork Day 1 2 3 4 5

6 7 8 9 10 11

Using Normal Concrete


Wall: Rebar Formwork Concreting Min Period to strike formwork Slab: Formwork BRC Concreting Min period to strike formwork

Savings of 3 Days per Cycle

Using UltraRapid10@12
Wall: Rebar Formwork Concreting Min Period to strike formwork Slab: Formwork BRC Concreting Min period to strike formwork

Typical Concreting Schedule - Table Form System Figure 3 : Comparison of Concreting Schedules Between Using Normal Concrete and UltraRapid10@12 for Different Construction Methods

Figure 4 : Low Cost Apartments in Bukit Raja, Klang, Selangor

Figure 5 : Low Cost Apartments in Pantai Dalam, Kuala Lumpur

CONCRETE

LAFARGE CONCRETE (MALAYSIA) SDN BHD (95483-H)