Principle Design (Min.

score 250 to move further)

PDE

Mass Transit Control Table Signalling Scale Plan SER/IMR Bookwiring Track Circuit Bonding Plan DTG-R/CBTC Scale Plan WESTRACE Data Design Auto Wiring MCT/DMC Data Preparation Correlation Drawings Design Note

Min. Items 2 2 2 2 2 2 2 2 2 2

Item Score 10 10 10 10 10 10 10 10 10 10

Min. Score 20 20 20 20 20 20 20 20 20 20

Mainline Scheme Plan Bonding Plan Free wired Int. designs Control Tables LAP TFM Schematic Cable Plan / Schematics Route Table Aspect Sequence Chart Signal Design Specification Stage Designs Fringe Designs

Min. Items 2 2 2 2 1 2 2 2 2 1 2 2

Item Score 10 10 10 10 10 10 10 10 10 10 10 10

Min. Score 20 20 20 20 10 20 20 20 20 10 20 20

No

Yes

No

T-Gate-2

Evaluation Committee

Yes

Yes

Dimetronic Verification of Screen Design Data

Min. Items 15 5

Item Score 4 20

Min. Score 60 100

Data WESTLOCK Data SSI Data WESTRACE Data Axle Counter Data

Min. Items 2 1 1 2

Item Score 20 40 40 20

Min. Score 40 40 40 40

Training-2

No

Gate-2

Verification ERTMS Design Data

No

Eligibility

DE
Mass Transit

Detailed Design (Min. score 400 to move further)


Min. Items 4 2 2 2 2 2 2 8 4 4 2 2 5 5 2 2 Item Score 20 10 10 5 10 10 10 5 5 5 10 10 2 2 10 10 Min. Score 80 20 20 10 20 20 20 40 20 20 20 20 10 10 20 20 Mainline LCD Multi Case REB/SER Free Wired Interlocking Design TFM/Datalink/AC Schematics LC Gate Designs Bonding Plan LAP Axle Counter Data Stage Work Designs Cable Schematics Control Table Scheme Plan FDM/TDM Designs Modular Signalling Case Design Correlation Drawings Record Updates Min. Items 4 2 1 2 2 2 2 2 4 2 2 2 2 4 5 5 Item Score 10 20 30 10 10 10 10 10 5 10 10 10 10 5 2 2 Min. Score 40 40 30 20 20 20 20 20 20 20 20 20 20 20 10 10

Yes

Tuesday, July 03, 2012

Score Card
All activities in BOLD are mandatory to be completed At least 4 activities to be performed with minimum score in addition to mandatory activities for ADE - Mass Transit & Mainline cells At least one activity to be performed with minimum score in addition to mandatory activities for ADE - Data cell At least 6 activities to be performed with minimum score in addition to mandatory activities for DE - Mass Transit & Mainline cells At least 2 activities to be performed with minimum score in addition to mandatory activities for DE - Data cell At least 3 activities to be performed with minimum score in addition to mandatory activities for PDE - Mass Transit cells At least 5 activities to be performed with minimum score in addition to mandatory activities for PDE - Mainline cells All activities to be performed for Dimetronic cell

Yes

T-Gate-1

Yes

Evaluation Committee

Yes

SER/IMR Bookwiring Control Table Signalling Scale Plan Track Circuit Bonding Plan DTG-R/CBTC Scale Plan DTG-R Data Preparation WESTRACE Data Design Location Case Design MCT Screen Design Auto Wiring MCT/DMC Data Preparation C3D Data Preparation Correlation Drawings Record Updates Design Note Cable Schematics

No

No

Training-1

No

Gate-1

Dimetronic
CTC/PLO Graphic Screen Design CTC/PLO Data Generation CTC/PLO Data Testing ERTMS Data entry using GDE tool ERTMS Data Compilation ERTMS Data Simulation and Testing

Min. Items
15 10 15 20 10 10

Item Score
4 4 4 4 4 4

Min. Score
60 40 60 80 40 40

Data
Screen Design SPECTRA Design WESTLOCK Data WESTRACE Data SSI Data ATP Data Design

Min. Items 6 5 2 2 2 2

Item Score 5 10 30 20 20 10

Min. Score 30 50 60 40 40 20

No

Eligibility

ADE
Mass Transit Microstation/AutoCAD Location Case Design Auto Wiring Bonding Plan SER Bookwiring Auto site Cable Schematics MCT Screen Modification work Westrace I/O Auto site or Front End Processor Scale Plan

Yes

Base Design (Min. score 200 to move further)


Min. Items 30 10 5 5 2 10 2 5 3 2 Min. Items
10 10 10 10

Gates
Min. Items 30 10 2 2 5 5 2 3 5 Item Score 1 2 5 5 4 2 10 3 2 Min. Score 30 20 10 10 20 10 20 9 10

Item Score 1 2 2 3 5 2 5 2 4 5 Item Score


4 4 4 4

Min. Score 30 20 10 15 10 20 10 10 12 10 Min. Score


40 40 40 40

Eligibility
Minimum score to be eligible to go to Gate for vertical/lateral movement Evidences will be checked during the process Minimum score to be achieved in each category until & unless specified

Mainline Microstation/Auto CAD Location Case Design Screen Design Tracing Work Red/Green mod work Level Crossing REB / SER Bonding Plan Cable Schematics

Completion of all activities listed will be certified by Reporting Manager Gate


Test conducted to verify the capabilities to move further

Generic Guidelines Any lateral movement from one domain to other, within same competency level will follow below generic path where X denotes current domain & Y denotes target domain
No

T-Gate
Test conducted based on trainings received
Min. Items
10 10 5 5

Training

T-Gate

Yes

Dimetronic
CTC/PLO Graphic screen design using PCGE/CTC tool CTC/PLO Data Generation ERTMS Data entry using GDE tool ERTMS Data Compilation

Data
Microstation/GCSS/WTW/ Spectra tools Screen Design (GSIM/WESTCAD) Interface Data Design Simulation Data

Item Score
3 4 10 10

Min. Score
30 40 50 50

Evaluation Committee
Test the knowledge & check the competency for the next level Review the evidences of the score card

Credit criteria to be defined for lateral movement Any lateral movement on requirement basis

~3 Yrs

~5 Yrs

~7 Yrs

Vous aimerez peut-être aussi