Civil engineers main role is in surveying, planning, designing, estimation and execution of structures like buildings, roads, bridges, railways, ports, airports, dams, canals, water and waste water treatment plants, water distribution network and sewerage system. To use scientific and engineering principles for solutions of different engineering problems To solve different engineering problems with the help of field experience, laboratory techniques, mathematical models, using computer and information technology. To implement management techniques for better management of man, material, machines and money.
Before Construction
Feasibility study Surveying Site investigation Planning Design and drawing Estimating Planning & Scheduling
Before Construction
In the beginning technical feasibility, environmental impact assessment and economical viability of the project are studied. Surveying includes preparing site plan, contour map and measurement of field dimensions and levels. Soil investigation includes collecting data regarding soil and bearing capacity of soil. Soil investigations is done for the purpose of foundation design. On the basis of the data collected planning, designing, are carried out and drawings are prepared. Estimates are prepared to know the probable cost of completion of work and detailed planning and scheduling are prepared to carry out different activities in time without any delay.
During Construction
Dealing with clients Consulting engineer and contractors
During Construction
Owner, engineer and contractor are the three constituents of a construction team in engineering profession, hence continuous liaison among themselves is a very essential for the speedy progress of the work. Execution of work is actual construction carried out on the site with materials and equipments, by the skilled and unskilled work force, under the technical guidance and supervision of engineer in charge. During the construction engineer has to supervise the work carried out as per the specifications for quality control. Costing is the accounts procedure of arriving at the actual cost of construction.
After Construction
Maintenance and repairs After the construction regular maintenance of structures is to be carried out Valuation Valuation is carried out for the purpose of sale, purchase and many others purposes.
Project Management
Five Ms of project management
1. Material 2. Money 3. Manpower 4. Machines 5. Management
Big Project
Small Project
6 Basic Steps
Step 5: Communicate
Bar Chart
CPM Network
Automation in Construction