By ROBINSON.H.J
Another occasion one of the MFT processor failed. Processor was removed and put back. Processor was not ok. EPROM of the processor was removed. The same was inserted in a new processor. The new processor was inserted into the rack. Immediately the unit tripped.
&
RSFF
Q
R
ON DELAY
All nozzle valve closed All trip valve closed All feeder off All HAG closed All scanner no flame Both PA fan off No Boiler trip command
RSFF
S
Q R
X
NVS
No MFT
TRANB TRANB
MFT
R TRANB Boiler on
Unit 1 was running with 210 Mw. Suddenly the load fluctuates from 0 to 210 Mw. EHC position was hunting between 50% to 100%. Boiler load was reduced by cutting out mills. EHG was switched off by the operator. EHG gone to 100%. Load was maintained according to the boiler pressure.
hr
+ hact
PI
To EHG coil
Max
Unit 2 was running with full load. Suddenly load reduced to zero. Unit tripped on reverse power protection. EHG circuits checked and found ok. Program in honeywell system checked. Error found in load set point program. The faulty program was removed and the problem was solved.
and load set < act load + 11 then set cmc 102.op = load set else set cmc 102.op = act load set load set = act load
CMC 102
O/P card
Load controller
Pr Prtd Final Load ref Desk R/L Load ref CMC O / P 0-250mw 0-10v Delayed Load ref 0-10v Pr P Load controller + + + + M I N + hrpc
Pr
Pr
PI
PDP
Stop ref Set pressure Desk R/L Load grad 2.5-25 Mw / min On / off M I N Set freq TSE Infl On / off Act freq Act pressure
Desk R/L
Load limit
0-10v
Speed controller
Nr
No load speed correction Speed ref value Time dept speed ref + 0-10.8V N act
hrnc
0-10.8V
TSE infl
Fast track on follow up MV3 Stop ref limiter
Speed transducer
CONTROL TRANSFER
10.5V
+ + hrnc
Speed control o / p
Load control o / p
hrpc
M A X
M I N
M I N
hrprc
hr
To EHC coil
Pressure control o / p