C&I PROBLEM CASE STUDY

By ROBINSON.H.J

MFT PROCESSOR PROBLEM


Two MFT processors in FSSS panel Both will be in service One processor in unit-2 failed The processor was removed The same processor was put back The processor was ok The unit was also not affected

Another occasion one of the MFT processor failed. Processor was removed and put back. Processor was not ok. EPROM of the processor was removed. The same was inserted in a new processor. The new processor was inserted into the rack. Immediately the unit tripped.

PURGE LOGIC IN PURGE PANEL


Purge ready Purge PB

&

RSFF

Q
R

ON DELAY

Purge complete 300 sec

All nozzle valve closed All trip valve closed All feeder off All HAG closed All scanner no flame Both PA fan off No Boiler trip command

Purge ready &

RSFF

Purge Complete For MFT trip

S
Q R
X

NVS

No MFT

TRANB TRANB
MFT

Loss of all fuel


AB any ign vlv open CD any ign vlv open DE any ign vlv open EF any ign vlv open Q NVS OR S RSFF

MFT ch-1 ON delay 5 sec

R TRANB Boiler on

All ign vlv closed

All HONV closed & Loss of all fuel

All LONV closed

All feeders off

EHG HUNTING PROBLEM

Unit 1 was running with 210 Mw. Suddenly the load fluctuates from 0 to 210 Mw. EHC position was hunting between 50% to 100%. Boiler load was reduced by cutting out mills. EHG was switched off by the operator. EHG gone to 100%. Load was maintained according to the boiler pressure.

EHC position controller


Position set point

hr

+ hact

PI

To EHG coil

Max

EHC position feedback-1

EHC position feedback-2

0 to 100% EHC position 0V at transmitter o / p

-6V to +6 V at transmitter 50% at card o / p

0to -10V at card 0 / p

LOAD SUDDENLY GONE TO ZERO

Unit 2 was running with full load. Suddenly load reduced to zero. Unit tripped on reverse power protection. EHG circuits checked and found ok. Program in honeywell system checked. Error found in load set point program. The faulty program was removed and the problem was solved.

Faulty program in honeywell system


If load set > act load 11

and load set < act load + 11 then set cmc 102.op = load set else set cmc 102.op = act load set load set = act load

4 to 20 mA Operator set point

CMC 102

O/P card

Load set point to EAST panel

Load controller
Pr Prtd Final Load ref Desk R/L Load ref CMC O / P 0-250mw 0-10v Delayed Load ref 0-10v Pr P Load controller + + + + M I N + hrpc

Pr

Pr

PI
PDP

Stop ref Set pressure Desk R/L Load grad 2.5-25 Mw / min On / off M I N Set freq TSE Infl On / off Act freq Act pressure

Actual Load 0-10Kg 0-12.5Mw Pr f On / off Pr max Set freq +

Isolated grid operation Freq > 50.6 P> 5% load

Act freq On / off 5% droop

_ + 30 Deg _ _ 25Mw / min _ + Pr max

Desk R/L

Load limit

0-10v

Speed controller

Nr

Nrtd Speed controller

Desk R / L SGC Turb Follow up Dn /Dt

No load speed correction Speed ref value Time dept speed ref + 0-10.8V N act

PDP 5%droop +/_ 150 rpm +/_ 10V

hrnc

0-10.8V

TSE infl
Fast track on follow up MV3 Stop ref limiter

Speed transducer

CONTROL TRANSFER

10.5V

+ + hrnc

Speed control o / p

Load control o / p

hrpc

M A X

M I N

M I N
hrprc

hr

To EHC coil

Pressure control o / p