INTRODUCTION
Kanti Bijlee Utpadan Nigam Limited (KBUNL) which is totally coal fired Thermal Power Station. There are two units of each 110MW installed capacity. To take over Muzaffarpur Thermal Power Station (2*110MW), a subsidiary company named Vaishali Power Generating Company Limited (VPGCL) was incorporated on September 6,2006 with NTPC contributing 51% of equity and
balance equity was contributed by Bihar State Electricity Board. The company
was rechristened as Kanti Bijlee Utpadan Nigam Limited on April 10, 2008. Present equity holding is NTPC 64.57% & BSEB 35.43%. Company is Renovating and modernising the existing unit and establishing new plant.
MECHANICAL DESIGN
Boiler. Furnace. Turbine. Super Heater & Re- Heater. PA,FD & ID Fan. Cooling Tower
4.ASH HANDLING
HRH
BOILER DRUM
PA FAN MILL
CRH
GENERATOR
RH
CONDENSOR
HPT
MISOR
IPT
DEARATOR
LPT CEP
COAL FURNACE
OIL DRAFT
LPH BFP
ID FAN
CHIMNEY
Working Principle
The basic working principle of thermal power plant is based on Rankine Cycle. A central steam station basically works on the Rankine Cycle .Steam is produced in the boiler, is expanded in the prime mover Turbine and is condenser to be fed into the boiler.
1. Coal to Steam
Coal and water are the primary inputs to a thermal power plant .This process of conversion of water to steam by using heat energy produced by burning of coal by producing heat takes place in boiler and its auxiliaries. Feed water is supplied to the boiler drum by boiler feed pumps, where water is heated and converted into saturated steam.
Steam to Mechanical
There are three type of turbine used in the plant High Pressure Turbine Intermediate Turbine Low Pressure Turbine
STEAM FLOW
S.HEATER
H.P
I.P
L.P
R.H.
condenser
working and the second unit is under R&M process. We are generating 90MW out
of 110MW and giving to the substation. The transmission is done through three phase, double circuit system. With the help of transformer, we are converting 11kv to 220kv and fed to substation, It is then step down to 132kv and feeded to BSEB and local areas. Equipments used in transmission of power: Sub-Station 1) Control Room 2) Switchyard
Two main component for generation of electricity:1.Generator:- The electric power is generated by the help of it. Mechanical power is converted into Electric power. A generator consists of rotor which of carbon brushes. The rotor rotates at 3000 RPM in case of any fault if production of plants stops then we have bearing motor which rotates shaft of turbine continuously and rotor at 65 rpm. This is because if shaft doesnt rotates then due to load it may bend.
By step up transformer or generating transformer we increase the value of power from 110MW to 220MW. The 6.6 KV is used for internal purpose and rest of the power is supplied.
WATER FLOW
B O I L E R STEAM
C O N D E N S E R COOLING
HOT WATER
TOWER
PLANT
D.M.
ECONOMIZER
COOL WATER
B.F.P
AIR HEATERS
PRIMARY AIR CYCLE IGNITERS
ECONOMIZER
SUPER HEATERS REHEATERS
Bibliography
1)
2) 3)
www.ntpc.net
Power Plant Engg. By P.K.Nag Manual List of Plant Equipments (NTPC)