Productivity Quality Delivery Safety Material Energy Morale Kaizen Title: To Reduce the setup time for 25mm width part numbers Problem/Present Status:
a.25mm width part number taking 270min setup time ,when compared to all other part number it taking 15-20 min.
Company TIMKEN
MM/YY NOV 11
S.No
T1- 1
Before Improvement:
W H E E L
W H E E
L
85 mm GUIDE ROD ASSEMBLY
GUIDE PLATE
1INCH PART
After improvement:
W H E E L
W H E E L
(b) Quantitative
2 setup per month for 25mm width parts 30sec cycle time for 1 piece 1080 piece produced with this available time
Guide plates Qualification required to do for 25mm part number which takes 4hrs
Guide plate adjustment assembly has to be shifted from its position to new drilled position Guide plate adjustment stroke is less
Standardization:
100 mm 1INCH PART
GUIDE ROD ASSEMBLY
100 mm
GUIDE ROD ASSEMBLY GUIDE PLATE
Guide plate adjustment stroke is less for 25mm width part number Guide Plate adjustment stroke length increased to avoid the shifting of guide plate assembly Lead screw rod increased by 15mm each side
Kaizen Sheet
Productivity Quality Delivery Safety Material Energy Morale Kaizen Title: To decrease the setup time for Diamond Change in Cone Rib Grinders
Company TIMKEN
MM/YY
S.No
JAN2012
T1-2
Implemented Area: X3-RIB grinder Implemented by: Praveen Kumar Pathak Wasim Akram Jagadeeswaran.D Result/Benefit: (a) Qualitative 1. Easy to remove the diamond
Problem/Present Status:
1. 15min. For removing the diamond 2. 180min. Break down due to wrong mounting/Removing of diamond collet nut
Before Improvement:
Real Root Cause Identification: After Improvement: To remove the diamond , difficult to hold the stem and remove the nut.
(b) Quantitative 1. Diamond Change/ month = 150 Time saved/ diamond Change = 12 min. Time Saved/month = 150*12 =1800min 2.Break down time reduced from 3 hrs to Zero Hrs due to improper diamond Entry/Removal 3.Spare parts of nut and collet (a). Ordering time (b). Ordering cost (c). inventory are eliminated
Standardization: 1.Machine manual Updated 3.Monthly PM check list updated for checking the screw thread Root cause Idea to eliminate root cause Counter-measure Stem of diamond turner changed Collet and nut is difficult to handle in this machine Changed the collet stem design to screw locking method 5 RIB Grinder How many places this Kaizen can be deployed horizontally
Kaizen Sheet
Productivity Quality Delivery Safety Material Energy Morale
Company TIMKEN
MM/YY
S.No
JAN2012
T1-3
Kaizen Title: To Reduce the Breakdown time due to improper indexing of the table
Implemented Area: JX1-Close In Press Implemented by: Praveen Kumar Pathak Wasim Akram Jagadeeswaran.D Result/Benefit: (a) Qualitative 1.Shaft damage avoided 2.Operator fatigue reduced 3. Manual Mode of operating the press not required
Problem/Present Status:
1.Table indexer not working due to shaft getting damage frequently
Before Improvement:
INDEXER TABLE
Free space
M O T O R
After Improvement:
INDEXER TABLE
Shaft key getting misaligned from the slot during the rotation
screw
(b) Quantitative 1.Machine down time reduced from 2 hrs to zero
Slot in the female shaft which allows the key to come out from the motor shaft
M O T O R
Slot in the female shaft which allows the key to come out from the motor shaft Spacer filled in the female shaft and grub screw locking provided Gap filled with grub locking
Nil