Académique Documents
Professionnel Documents
Culture Documents
The Objective of this course is to give Field Teams a hands on experience of solving engineering problems.
Mains (WAPDA 03 )
ATS
Generator (03 )
D I S T R I B U T I O N P A N E L
10A, 2P
10A, 2P
Tower Lights
Emergency Lights
RF Antenna
10A, 2P
10A, 2P
Fire Device
E.L.C.B. 25A Sockets
M/W Antenna
16A, 2P
32A, 2P
BTS Cabinet
Microwave IDU
DC Supply -54V
(D.P)
Batter y Backu p
LVD
CONTENTS
Introduction Equipment Description Installation and Wiring Maintenance and Component Replacement Handling
ATS
Generator (Standby Source) Load
D.P
ATS
is a schedule duty mean s to do the work in such a manner that nothing should be pending in order to avo id alarms.
PM
Cable Glands
ATS Components
3
0 1 2
Fus es
Electromechanicall y Relay
Magnetic Contactors
Indicators
Circuit
Interlock Unit
Front Mount
Contacts Status
Mains control () Gen set control() Gen Auto Start Input (1) Input (2) Input (3) Input (1) Input (2) Input (3) Input (1) Input (2) Input (3) Input (1) Input (2) Input (3) Output (A1) Output (B2) Output (C3) Output (A1) Output (B2) Output (C3) Output (A1) Output (B2) Output (C3) Output (A1) Output (B2) Output (C3)
OFF
1 (Mains)
2 (Auto)
3 (Gen)
Before PM
After PM
Coil
Coil
NC
NC
Type Pole
Rated Current
17.5 mm
4 Pole
Thank You
20