Contents
1. Thermal Power Plant modeling 2. Viable Financial model 3. Learnings 4. Questions Unanswered
Choose Optional Packages Desalination Plant/RO Plant MGR Railway Siding Unloading Equipment at Jetty Rolling Stock/Locomotive FGD Plant Township & Colony Length of Transmission Line till Tie Point (in km)
2. Mandatory Packages
Mandatory Packages
S.No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Package
Steam Generator Island Turbine Generator Island Water System Fuel Oil Handling & Storage System Ash Handling System Coal Handling System Mechanical-Miscellaneous Package Switchyard Package Transformers, Switchgear, Cables, Cable Facilities, Grounding & Lighting Packages Emergency DG Set C&I Package Chimney Civil Works Initial Spares Cooling Tower TOTAL Total Benchmark Hard Cost for Power Station (INR Crores/MW)
Installed capacity Project cost per MW Annual Plant load factor Auxiliary Power Consumption Plant Efficiency Plant gross heat rate
Specific Fuel oil Consumption Calorifica value coal Fuel oil cost Coal Cost per Tonne assumed including transportation Annual Fuel oil consumption equity debt interest on loan interest on working capital depreciation Rate life of plant O & M charges Return on equity Minimum alternate Tax
SI.No 1
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Units MW
Rs.Crores Rs. Crores/MW MU MU MU Kcal/Kwh Mill Tonnes Kg/Kwh Rs.Crores ML Rs.Crores Rs.Crores Rs.Crores Rs.Crores Rs.Crores Rs.Crores Rs.Crores Rs.Crores Rs.Crores Rs.Crores Rs.Crores Rs./kwh Rs./kwh
2640 11938.08 4.522 19657.44 1670.882 17986.56 1875 8.332074 0.423864 2083.019 19.65744 78.62976 2161.648 1.2E-07 1002.799 143.257 630.3306 358.1424 555.1207
Learning
Little technical knowledge is a prerequisite for modeling Calorific value of fuel, distance of point of injection, distance from water and fuel source.
Questions Unanswered
How to find other indices values? What kind of Tax Rates have to be applied? Is there any reference document for calculating Plant civil works cost? How to minimize the cost of overall project?