Scope of Work
Extension of existing 33KV overhead line by 2350 meters.
Erection, installation and supply of all essential items ie. ACSR conductor, structures, insulators, earthing and 33KV Miscellaneous material

Supply of complete set of electrical equipments and facilities for 33KV Station.
2 Nos. Of ACDBs with MCB Street Light Fitting complete with 4x24 Watt T5 Lamps

Supply and Installation of 1000KVA Transformer(33KV/0.433KV) with standard auxiliaries and fittings. Shifting and Installation of 750KVA Transformer already available at site Supply and Installation of 415V Main Switchgear
2 Nos. 1600 Amp ACB incomer feeder from 33KV/0.433KV(1Spare) 1 No. 800 Amp ACB feeder for outgoing supply to 415V Switchgear at Barge-1 1 No. 630 Amp ACB feeder for outgoing supply to 415V Switchgear at Barge-1 1 No. 16 Amp Switch/Fuse feeder for Lighting Control Transformer feeder

Supply and Installation of 415V Switchgear at Barge-1


1 No. 800 Amp ACB incomer feeder from 415V Main Switchgear 5 Nos. 630 Amp ACB feeder to feed power supply to 4 Nos.,180KW Recovery Pump Motor 1 No. 16 Amp Switch/Fuse feeder for Lighting Control Transformer feeder

Extension of existing 415V Switchgear at Barge-2


If constrains,0.4KV Supply Panel to feed 2 Nos. Recovery Water Booster Pump Motors Breakers, Switches, Contactor, along with Control, Protection and Metering Requirements

Supply and Installation of 0.4KV switchgear panel for 4 Nos. of 30KW Ash Slurry Booster pump Motors- 2 Nos.(Optional)
Breakers, Switches, Contactor and Panels along with Control, Protection and Metering Requirements

Supply and Installation of 0.4KV Switchgear Panel for feeding 4 Nos. 40KW Ash Slurry Booster Pump Motors(Optional)
Breakers, Switches, Contactor and Panels along with Control, Protection and Metering Requirements

Supply and E&C of Electric Motors:


Recovery Water Pumps Motor 180KW-4 Sets Recovery Water Booster Pump 150KW-2Sets Ash Slurry Booster Pumps 30KW(PH1)- 4 Sets(Optional) Ash Slurry Booster Pumps 30KW(PH2)- 4Sets(Optional) Ash Slurry Booster Pumps 40KW(PH3)- 4Sets(Optional)

Power and Control Cabling:


Interconnections of 1000KVA transformer with 415V main switchgear Main Switchgear to Switchgears at Barge-1 and Barge-2 2 Nos. of 150KW Booster Pump feeders with 415V main switchgear at Barge-2 Motors for optional Ash Slurry booster pumps for PH1,PH2 and PH3 (Optional Item) All other control and power cables as required for completion of system

Cable trays, Racks, Glands, Lugs

Earthing (Substation, 33KV Overhead Line, metal fencing and all other Electrical
Equipments)

Illumination (Switchgear Room, Barges and Transformer S/S and Dam Control Room)

Terminal Points
33KV Line from where it is to be extended