Vous êtes sur la page 1sur 24

Overview of the Floating Production Sector

Presentation by James McCaul at the 18th Annual Floating Production Systems Conference and Exhibition
December 1, 2001
International Maritime Associates, Inc. Washington, DC, USA Tel: 202-333-8501 Fax: 202-333-8504 E-mail: imaassoc@msn.com Website: www.imastudies.com

The Presentation Will . . .

Profile the current inventory of floaters Characterize the current order backlog Identify potential new floater projects Describe the longer term outlook for new floaters

International Maritime Associates, Inc.

-2-

www.imastudies.com

154 Floating Production Systems Now Available


15 Tension Leg Platforms

38 Production Semis
92 FPSO Vessels

9 Production Spars

International Maritime Associates, Inc.

-3-

www.imastudies.com

Where Floating Production Systems Are Now Operating


19 12 6 2
P MI O O TL SE PS FS F

1
P MI O O TL SE PS FS F

12 1 5 5 15 1
P MI O O TL SE PS FS F

12 1

9 3

P MI O O TL SE PS FS F

25 12 1 1 1
P MI O E O TL SE PS RG FS F A B O R P

P MI O R O TL SE PS PA FS F S

19 14 1
P MI O O TL SE PS FS F

P MI O O TL SE PS FS F

3
P MI O O TL SE PS FS F

19 10

2
P MI O O TL SE PS FS F
Not shown are 4 FP SOs and 2 sem is that are off-field and stacked. Units in the GOM include 2 FSOs off Mexico and 1 FSO off Colom bia

International Maritime Associates, Inc.

-4-

www.imastudies.com

Geographic Distribution of Production Floaters Now Operating


West Africa No. Europe No. Europe

FPSOs
Brazil

21% 21% 11% 11% 37%

32%
3% 3% 8% 5%

Semis
West Africa GOM Other Asia/Pac

50%
Other Brazil

Asia/Pac

TLPs
13% 80%
GOM

No. Europe

Spars
GOM

7%
Asia/Pac

100%

International Maritime Associates, Inc.

-5-

www.imastudies.com

30 Year Growth in Number of Floaters Has Been Impressive


160
154

Spar TLP

Number of Installed Units

120

1993 to 2003 + 267%

Semi

80 FPSO
42

40
16 1

0
74 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 000 001 002 003 9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 as of year end

International Maritime Associates, Inc.

-6-

www.imastudies.com

Over the Past 7 Years 101 Floating Production, 30 Storage Systems Have Been Installed
- - - - - Where Installed - - - - 19

7 3 1 1
P MI SO FSO TL SE FP P MI O O TL SE PS FS F P MI SO FSO TL SE FP

9 1

11
P MI SO FSO TL SE FP

1 17 3 7 11 6 3
P MI O O TL SE PS FS F P MI SO FSO TL SE FP

1
P MI SO FSO TL SE FP

P MI O R O TL SE PS PA FS F S

1
P MI SO FSO TL SE FP

P MI SO FSO TL SE FP

The FSO in the GOM is off Mexico

International Maritime Associates, Inc.

-7-

www.imastudies.com

Production Floater Installations Over Past 7 Years


Area Northern Europe Gulf of Mexico West Africa % of Installations 26% 19% 18% Type 19 FPSOs, 7 semis 9 TLPs, 9 spars, 1 semi 17 FPSOs, 1 semi

Brazil
Asia/Pacific Other
International Maritime Associates, Inc.

17%
16% 5%
-8-

11 FPSOs, 6 semis
15 FPSOs, 1 TLP 5 FPSOs
www.imastudies.com

Almost 11 MB/D Oil Processing Capacity Now On Floating Production Systems


14.5 mb/d at end 2005 10.8 mb/d + 32% at end 2003 On Order

0.1 mb/d at end 1983

1.3 mb/d at end 1992

83 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 000 001 002 003 004 005 9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2
International Maritime Associates, Inc. -9www.imastudies.com

37 Floating Production Systems and 5 Storage Systems are on Order


(as of November 2003)

4 TLPs 2 mini, 2 wellhead

25 FPSO Vessels 12 new, 11 conversions, 2 upgrades


4 Production Semis all new 4 Production Spars all new 5 FSOs 1 new, 4 conversions
International Maritime Associates, Inc. - 10 www.imastudies.com

Where Floating Production and Storage Systems on Order are to be Installed


1
TL P I SO EM FSO P S F

1
P MI O O TL SE PS FS F

4
P MI O O TL SE PS FS F

4 2
P TL

2
M SE I R SO PA FP S

10 1 2 2 1 2
P MI O O TL SE PS FS F

P MI O O TL SE PS FS F

P MI O O TL SE PS FS F

P MI O O TL SE PS FS F

P MI O O TL SE PS FS F

Not shown is 1 speculative FPSO hull (Aoka Mizu) that has been completed but not yet assigned to a field.

International Maritime Associates, Inc.

- 11 -

www.imastudies.com

Production Floaters Now on Order


(as of November 2003)

Where to be Installed West Africa


Gulf of Mexico Asia/Pacific Brazil Northern Europe Other
International Maritime Associates, Inc.

% of Orders 32%
22% 22% 16% 3% 5%

Type

10 FPSOs, 2 well-TLPs
2 TLPs, 2 semis, 4 spars 8 FPSOs 6 FPSOs 1 semi 2 FPSO
- 12 www.imastudies.com

6 Year Trend in Orders for Floating Production Systems


(average order intake per month)

3.00 2.00 1.00 0.00 1.00 1.40 0.75 0.750.75 0.40 1.00 1.50 0.83

2.80 2.00

2.25

1.80 0.50

1.50

76 Month Average 1.3 Units Per Month

0.75 1.00

9 9 8 7 8 9 8 00 '00 '01 '01 '01 '02 l '02 '03 '03 '03 '9 '9 l '9 '9 t '9 '9 '9 ' r r v p n n b p n n b n u c ct u ct a a o e a e e e a u u u J J O J J -S 7-F r-J l-O 8-F ar- g-N 9-M r-S 0-J b-J ul-O - M pr2- 03- 03n u a p 0 0 9 1 9 9 e ' ' J J ' A ' ' M Au A F M l' Ju ct ' '0 g v c b u ct v e u o e J O O o F D A N N

International Maritime Associates, Inc.

- 13 -

www.imastudies.com

87 Floating Production Systems are Planned or Under Study


(as of November 2003)

3
Ultra-Deepw ater >5000' Deepw ater 3000'-5000' <3000' w ater depth

10 10

3 3 12 3 5 1 il z ra B 1 6

22% 41% 37%

1 5 4 1 3 1

a ic r f A .

co i ex M f fo l u G

SE

a si A

tr s u A

ia al o. N
- 14 -

e p ro u E

na i h C

da a an C

r e th

International Maritime Associates, Inc.

www.imastudies.com

Projects in the Bidding or Final Design Stage


(as of November 2003)

11 4 3 3

1
na i h C

0
da a an C

0
pe o r u E o. N

1
er h t

.A

ic fr

az r B

il th u So tA s ea

sia us A

al tr

ia ul fM o f

co i ex

International Maritime Associates, Inc.

- 15 -

www.imastudies.com

Some Near Term Projects . . .


Akpo Roncador P-54 Marlim Leste Tahiti Merganser/Vortex Peng Lai 2

Agbami
Kizomba C/D Block G Usan/Ukot

International Maritime Associates, Inc.

- 16 -

www.imastudies.com

Projects Planned or Under Study


(as of November 2003)

14

12

12

10 6 4 3 3

1
da a an C

ul

fM o f

c xi

o Br

il z a W

.A

i fr

ca

tA s ea h ut o S

sia

pe o ur E o. N

u A

lia a r st

na i h C

er th

International Maritime Associates, Inc.

- 17 -

www.imastudies.com

Some Longer Term Projects . . .


Southern Alaminos Canyon FPSO/shuttle tanker or production semi/pipeline? Block 31 Angola large FPSO Bonga Southwest large FPSO, maybe joint development with Aparo Marlim Sul/Roncador 3 or 4 additional large FPSOs or semis Gehem/Ranggas TLP/production barge combo, like West Seno
International Maritime Associates, Inc. - 18 www.imastudies.com

The Long Term Outlook for Floater Orders is Very Favorable

International Maritime Associates, Inc.

- 19 -

www.imastudies.com

85

Trend in World Oil and Gas Consumption


Natural Gas Consumption Growing 2.2% Annually

2600

Gas -- Billion Cubic Meters

Oil -- Millions of B/D

75

2300

Oil Consumption Growing 1.2 % Annually

65
9 19 2 9 19 3 9 19 4 95 9 1 9 19 6 9 19 7 9 19 8 9 19 9 0 20 0 01 0 2 02 0 2

2000

Source: BP

International Maritime Associates, Inc.

- 20 -

www.imastudies.com

Long Term Oil and Gas Demand


IEA expects global energy demand to increase at a rate of 1.7% per year over next 30 years Oil and natural gas to supply 90% of the increased demand

Oil consumption is expected to rise at an annual rate of 1.6%


Gas consumption is expected to double by 2030
International Maritime Associates, Inc. - 21 www.imastudies.com

Futures Price of Crude


($ per bbl)
40 $/BBL
Futures Price as of Nov. 10, 2003

30

Spot Price of W TI Crude

20
Futures Price as of Feb. 14, 2003

10

Source: Wall Street Journal

0
6 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 '8 ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' c e ec ec ec ec ec ec ec ec ec ec ec ec ec ec ec ec ec ec ec ec ec ec ec D D D D D D D D D D D D D D D D D D D D D D D D

International Maritime Associates, Inc.

- 22 -

www.imastudies.com

Our February 2003 Forecast of Requirements for Floating Production Units


High Forecast
280 240 200
Number of Units

270 * 245 *

Low Forecast

160 120 80 40 0
74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 06 08 09 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 as of year end

Actual

Forecast

International Maritime Associates, Inc.

- 23 -

www.imastudies.com

This Forecast Would Produce Orders for 62 to 89 FPUs Between 2003-2008


Composition of orders is expected to be - 60% FPSOs - 30% spars or TLPs - 10% production semis These orders would generate $22 to 31 billion capex In February 2004 we will revisit this forecast and extend the forecast period from 2004 to 2009
International Maritime Associates, Inc. - 24 www.imastudies.com

Vous aimerez peut-être aussi