Design of Non-overflow Dam

# Following steps are followed to design a Non-

overflow Dam: Selection of Dam profile Stability analysis

A. Selection Of Dam Profile : On the basis of existing dam section of same height (if possible). In general ,

U/S taken as flat.


D/S slope taken as .9 horizontal to 1.0 vertical Base width => b = 0.748h Top width may be taken 6 to 9m

B. Stability Analysis :1.


Determination of load and their moment:-

a) Dead weight b) Water pressure c) Uplift forces d) Earthquake Pressure

e) Silt Load
f) Wave Pressure

2. Tabulation of forces and moment 3. Determination of stresses

Problem StatementDesign the non- overflow section of a gravity dam with the following data :1. 2. 3. 4. 5. 6. 7. 8. 9. R.L. of deepest foundation level R.L. of roadway at the top of dam Maximum pond level Maximum tail water level Location of centre of drainage from u.s. face of dam Roadway width at the top Upstream face Downstream face of dam Safe bearing capacity 100m 161m 152m 123.9m 7m 6.1m vertical 0.9 h to 1 v 15 kg/cm2

10. Minimum allowable shear friction factor:under normal loading = 5.0

Under abnormal loading= 4.0


11. Maximum coefficient of sliding under normal loading 12. Horizontal seismic coefficient 13. Vertical seismic coefficient 0.75 = 0.2g = 0.1g

Solution:Case 1 Following parameter are considered :1. Reservoir full 2. No tail water 3. Uplift considered 4. Drains working 5. Horizontal earthquake acceleration upstream

6. Vertical earthquake acceleration downward

Sign convention:-

1- All clockwise moment about heel as negative.


2- All anticlockwise moment as positive.

S.no. Item

Calculation

Vertic al force (t)

Ho Leve Moment riz r arm tm ont al (t)

WEIGHT

1
2

W1
W2

6.1X6.72X2.4 49 2 61X54.9X2.4 4019 2

4.06 -198
18.3 - 73548

S. Item no .

Calculation

Verti cal force (t)

Hor Leve Moment izo r arm tm ntal (t)

HYDRODYNAMIC FORCE DUE TO EARTHQUAKE


3 V= .726Py 0.726 X P=Cawh (0.73X.2X52X1) X 52 M= 0.299 X 0.299Py2 (.72X.2X52X1)X 522 287

- 6136.2

S. Item no .

Calculation

Vertic al force (t)

Ho Lev Moment riz er tm ont arm al (t)

WATER THRUST
4 F= 0.5xWH2 .5 x 1 x 522 1352 52/3 -23434.6

S. Item no .

Calculation

Vertic Lev Moment al er tm force arm (t)

UPLIFT FORCE
5 U1
U2 U3

.5 x 7 x 34.67
7 x (52 34.67) .5 x 47.9 x 17.33

-121.3 7/3
-121.3 3.5 -415 23

282
423 9545

S. Item no .

Calculation

Verti cal force (t)

Hor Leve Moment izo r arm Tm ntal (t)

INTERTIAL FORCE DUE TO EARTHQUAKE 6 Pev Pehw1 Pehw2 (49 + 4019) X 0.1 49 X 0.2 4019 X 0.2 - 407 10 27.15 11050 58.76 -588

804 61/3 -16348

S. Item no .

Calculation

Vertic al force (t)

Ho Leve Moment riz r tm ont arm al (t)

INTERTIAL EFFECT DUE TO VERTICAL EARTHQUAKE 7 Pwev = wha 1 X 522 X 0.1 / 2 135 52/3 2340

S.no . 1 2 3 4 5

Item Weight Hydrodynamic force due to earthquake Water thrust Uplift force Inertial force due to earthquake

Vertical force (t) 4068

Horizontal force (t) 287 1352

Moment (tm) -73747 -6159 -23435 10250 -9561

-657 -407 814

Inertial effect due to vertical earthquake


TOTAL

-135
2869 2453

2340
-100312

# Stress analysis :Eccentricity e = 33.1 27.5 sz = SW + SW 6 e T T2

= 2869 + 2869 X 6 X5.6 54.9 54.92 = 52.3 + 32 szd = 84.3 t/m3


szu = 20.3 t/m3

Principal stresses :sp = sz sec2 F

sp = 2.03 kg/cm2
sp = 15.3 kg/cm2

Co-efficient of sliding = SH = 2451 = 0.85 SW 2869


Check for shear friction factor = 2869 X 0.7 + 54.9 X 210 2451 = 5.5 hance OK

Case 2 Following parameter are considered :1. Reservoir full 2. No tail water 3. Uplift considered

4. Drains working
5. Horizontal earthquake acceleration upstream 6. Vertical earthquake acceleration acting up 7. Silt is considered

S. Item no .

Calculation

Vertic al force (t)

Hor Leve Moment izo r arm Tm ntal (t)

INTERTIAL FORCE DUE TO EARTHQUAKE 6 Pev Pehw1 Pehw2 (49 + 4019) X 0.1 49 X 0.2 4019 X 0.2 + 407 10 27.15 11050 58.76 -588

804 61/3 -16348

S. Item no .

Calculation

Ve Horizon Leve Moment rti tal r tm cal (t) arm for ce (t)

WATER THRUST
4 F= 0.5xWH2 .5 x 1.36 x 522 1838.7 52/3 -23434.6

S.no . 1 2 3 4 5

Item Weight Hydrodynamic force due to earthquake Water thrust Uplift force Inertial force due to earthquake

Vertical force (t) 4068

Horizontal force (t) 287 1838.72

Moment (tm) -73747 -6159 -31871 10250 -9561

-657 407 814

Inertial effect due to vertical earthquake


TOTAL 3818

135
3075

2340
-128183

# Stress analysis :Eccentricity e = 33.6 27.5 = 6.1 sz = SW + SW 6 e T T2

= 3818 + 3818 X 6 X6.1 54.9 54.92 = 69.5 + 46.4 szd = 115.9 t/m2
szu = 23.1 t/m2

sp = sz sec2 F spd = 11.6 kg/cm2 spu = 2.3 kg/cm2 Co-efficient of sliding = SH = SW 3075 = 0.805 3818

Check for shear friction factor = 3818 X 0.7 + 54.9 X 210 3075 = 4.6 hance OK

Case 3 Following parameter are considered :1. Reservoir full 2. No tail water 3. Uplift considered

4. Drains working
5. Horizontal earthquake acceleration upstream 6. Vertical earthquake acceleration acting up 7. Waves force considered

S. Item no .

Calculation

Ve Horizon Leve Moment rti tal r tm cal (t) arm for ce (t)

WAVE PRESSURE
4 F= 2 x (hW)2 2x 1.52 4.5 52.6 -237

S.no . 1 2 3 4 5

Item Weight Hydrodynamic force due to earthquake Water thrust Uplift force Inertial force due to earthquake

Vertical force (t) 4068

Horizontal force (t) 287 1352

Moment (tm) -73747 -6159 -23435 10250 -9561

-657 407 814

6
7

Inertial effect due to vertical earthquake


Pwaves TOTAL

-135
4.5

2340
-237

3818

2592.5

-119979

# Stress analysis :Eccentricity e = 31.4 27.5 = 3.9 sz = SW + SW 6 e T T2

= 3818 + 3818 X 6 X3.5 54.9 54.92 = 69.5 + 46.4 szd = 19.9 t/m2
szu = 39.1 t/m2

sp = sz sec2 F
spd = 17.9 kg/cm2

spu = 4 kg/cm2
Co-efficient of sliding = SH = SW 2592.5 = 0.68 3818

Check for shear friction factor = 3818 X 0.7 + 54.9 X 210 2592.5 = 5.5 hance OK