Académique Documents
Professionnel Documents
Culture Documents
the
wireline
Perforate
Monitor
Interventio n
Stimulate
Abandon
the
wireline
Wireline - History
1926: Socit de Prospection lectrique 1927: First log in Pechelbronn - France 1971: Flopetrol acquisition 1986: Flopetrol merges with Wireline, creating Wireline & Testing
1977: 1989:
1995:
1998: the
Platform Express
MAXPRO/PSP/Evergreen
wireline
the
wireline
the
wireline
Basic Set-Up
1. Logging unit Truck or offshore unit 2. Wireline cable 3. Sheave wheels 4. Primary depth measurement system: IDW 5. Primary tension sensor: CMTD 6.
the
wireline
Surface equipment
the
wireline
the
wireline
Abandon
the
wireline
Evaluatio n
the
wireline
Wireline Logs
Lithology Resistivity Porosity
(How much
SP,Caliper RXOZ, 10, 20,30,60, HMIN, PEFZ, DPHZ, the wireline GR (0-150) 90 (0.2-2000 ohmm) HMNO NPOR (60% - 0%)
Density (RHOZ)
Triple Combo 90 FT
PEX
1500
the
wireline
38 FT
1600
Nuclear Logging
the
wireline
the
wireline
the
wireline
the
wireline
the
wireline
Perforat e
Perforating Services
Wireline conveyed or Tubing conveyed
the
wireline
Monitor
Interventio n
Production Services
RST* Reservoir Saturation Tool Gamma ray detector Oil holdup Gas indicator FloView* tools Bubble velocity Water holdup Fluid marker Spinner injector
the
wireline
the
wireline
the
wireline
the
wireline