MUDA
MURA
MURI
Operation = Work + MUDA Work = Increases Value of Production (Work) = MUDA = Increases Cost of Production (Waste) =
vf/kd mRiknu laxzg ifjogu] ys tkuk izfr{kk djuk Lo;a dk;Zokgh dk;ZdrkZ fd xfrfof/k
3. Conveyance (Transport)
4. Waiting 5. Operation Itself 6. Movement of Worker 7. Bad Quality
[kjkc xq.k
Loose Money
/ku dh ccZknh
Increase Bin or Rack for Storage Material oLrq j[kus ds chu vkSj jSd esa o`f
MUDA of Stock
Required Qty. 500 in a Day But Making Pcs 1000 Nos. in a Day ?
Increase Workers Increase Bin or Rack for Storage Material
Loose Money
/ku dh ccZknh
800.0 Kgs
NO MUDA
in 3 Times
MUDA
MUDA of Waiting
Searching Tools or Others Material
1. Searching Right Tools Waste Time 2. Searching Proper Location Waste Time
Reduce Operation
Rough Drilling & Counter Drilling Operation to be Clubbed
1. 2. 3. 4.
Manpower Saving = 1 Operator Setting Time Reduced from 1 Hrs. to Zero (Cycle Time, Loading/Unloading) Single Piece Flow Single Tool Setting
3.
4.
MUDA
NO MUDA
A Mixture Carrying
= Capacity 300.0 Kgs.
vf/kd cks>
Material Carrying Capacity 100.0 Kgs.
Loading Material
2 X 300.0 Kgs.