Presentation outline
Understanding basics of switchyard Switchyard equipments and schemes Components of switchyard: Breakers, Isolators, Earth switch, CT, CVT, Wave trap etc Brief Description of modes of transmission Conclusion
25 December 2013
PMI Revision 00
What is a Switchyard ?
It is a switching station which has the following credits : (i) Main link between Generating plant and Transmission system, which has a large influence on the security of the supply.
(ii) Step-up and/or Step-down the voltage levels depending upon the Network Node.
(iii) Switching ON/OFF Reactive Power Control devices, which has effect on Quality of power.
25 December 2013 PMI Revision 00 3
SWITCHYARD EQUIPMENTS
Equipments commonly found in switchyard : 1. Lightening arrestor 2. Current transformer 3. Voltage transformer 4. Power transformers / I.C.T. 5. Bus bar and clamp fittings 6. Support structure 7. Isolators 8. Circuit Breaker 9. Wave traps 10. Earthing switch
25 December 2013 PMI Revision 00 4
Functions of various equipment : * Transformers : - Transforms the voltage levels from higher to lower level or vice versa, keeping the power constant. * Circuit breakers : - Makes or automatically breaks the electrical circuits under Loaded condition. * Isolators : - Opens or closes the electrical circuits under No-load conditions. * Instrument transformers : - For stepping-down the electrical parameter (Voltage or Current) to a lower and safe value for Metering and Protection logics. * Earth switch : - Used to connect the charged body to ground to discharge the trapped charge to have a safe maintenance zone.
25 December 2013 PMI Revision 00 5
* Lightning arrestors : - Safe guards the equipment by discharging the high currents due to Lightning. * Overhead earth wire : - Protects the O/H transmission line from Lightning strokes. * Bus bar : - Conductors to which a number of circuits are connected. * Wave Traps/Line traps : - Used in PLCC circuits for Communication and telemetering. * Reactive Power control devices : - Controls the reactive power imbalance in the grid by switching ON/OFF the Shunt Reactors, Shunt Capacitors etc., * Current Limiting Reactors : - Limits the Short circuit currents in case of faulty conditions. 25 December 2013 PMI Revision 00 6
25 December 2013
PMI Revision 00
25 December 2013
PMI Revision 00
25 December 2013
PMI Revision 00
Bus Isolator
GT 20.5/400KV
25 December 2013
Gen Bay
PMI Revision 00
Feeder Bay
10
25 December 2013
PMI Revision 00
11
Switching Scheme
* System Security * Operational Flexibility * Simplicity of Protection arrangements * Ability to limit the Short Circuit levels * Maintenance * Ease of extension * Total land area * Cost
25 December 2013
PMI Revision 00
12
Single Sectionalized
Bus-bar system
I/C Feeders
CB Bus-bar Isolators
O/G Feeders
25 December 2013 PMI Revision 00 13
Bus Coupler
Main Bus
Isolators
25 December 2013 PMI Revision 00 14
CB
O/G feeder
I/C Supply
25 December 2013 PMI Revision 00 15
Main 1 Main 2
Feeder 2
25 December 2013
Tie CB
PMI Revision 00
Feeder 1
16
Air Blast CB :
25 December 2013
PMI Revision 00
17
25 December 2013
18
FEATURES OF ISOLATORS
OPERATES UNDER NO LOAD CONDITION INTERLOCKED WITH BREAKERS AND EARTHSWITCHES SHOULD WITHSTAND EXTREME WIND PRESSURES MOTOR DRIVEN AND HAND DRIVEN LOCAL AS WELL AS REMOTE OPERATION POSSIBLE ISOLATES SECTIONS FOR MAINTENANCE USED TO SELECT BUS BARS CT SWITCHING FOR BUS BAR PROTECTION
25 December 2013
PMI Revision 00
19
25 December 2013
PMI Revision 00
20
Current transformers
Purpose : - To step-down the high magnitude of current to a safe value to incorporate Measuring and Protection logics Current transformers are used for the instrumentation, protection or metering of power systems.
25 December 2013
PMI Revision 00
21
Voltage transformers
Purpose : - To step-down the high magnitude of voltage to a safe value to incorporate Measuring and Protection logics. Voltage transformers serve a number of functions in a power system. They are required for the operation of many types of instrumentation and relay protective systems. They measure voltage and in conjunction with CT , they measure power. They feed synchronizing equipment. They can be used as coupling capacitors in power line carrier network.
25 December 2013
PMI Revision 00
22
IRON CORE
PRIMARY WINDING
25 December 2013 PMI Revision 00 AC EXCITATION SOURCE 23
CAPACITIVE VOLTAGE TRANSFORMER Primary voltage is applied to a series of capacitors group. The voltage across one of the capacitor is taken to aux PT. The secondary of the aux PT is taken for measurement and protection. SECONDARY VOLTAGES(110 VOLTS AC) FOR METERS AND ENERGY METERS VOLTAGES FOR PROTECTIVE RELAYS VOLTAGES FOR SYNCHRONIZING DISTURBANCE RECORDERS AND EVENT LOGS OVERFLUX RELAYS PLCC
25 December 2013 PMI Revision 00 24
CVT internals :
Bus
Intermediate PT
25 December 2013
PMI Revision 00
25
Lightning Arrestors
25 December 2013
PMI Revision 00
26
Purpose :
- To discharge the high voltage surges in the power system due to lightning to the ground. Apparatus to be protected : * Overhead linesEarth/Ground wires (PA=30 deg) * HV equipmentLAs * Substation...Lightning Masts, Earth wires
25 December 2013
PMI Revision 00
27
Types :
Rod gap LA :
* Gap length is such that the break-down occurs at 80% of the spark voltage * After the surge, the arc in the gap is maintained by the normal supply voltage. So, only used as a back-up. Insulator
Rod gap
Equipment body
25 December 2013
PMI Revision 00
28
Earth Switches
25 December 2013
PMI Revision 00
29
25 December 2013
PMI Revision 00
30
Isolator
25 December 2013
31
Source
Isolator
Isolator
Load
CB
Earth S/W
25 December 2013
PMI Revision 00
32
Wave Trap
25 December 2013
PMI Revision 00
33
Transmission Line
S/S-1 S/S-2
Wave Trap
To control room of S/S-1
Wave Trap
* Wave trap is used for Protection of the transmission line and communication between the Substations. * VHF signal is transmitted from one end to the another through the same power line. * Sends inter-trip signal to the other end CBs so that fault can be isolated at the earliest time.
25 December 2013 PMI Revision 00 34
BASIC ARRANGEMENT OF WAVE TRAP AND COUPLING CAPACITOR POWER FREQ -50 KHZ LINE
30KHZ TO 500KHZ
STATION BUS
LMU IMPEDENCE 75 OHMS
PLC C
25 December 2013 PMI Revision 00 35
Modes of Transmission
25 December 2013
PMI Revision 00
36
AC transmission
Advantages
- Power can be generated at high voltages. - Step-up/Step-down is possible.
Disadvantages
- Requires more copper. - Due to Skin effect, the effective resistance is increased - Continuous loss of power due to charging current even when the line is open. - Requirement of Transposition of conductors.
25 December 2013
PMI Revision 00
37
DC transmission
Advantages
- Low cost due to less copper requirement - No Stability and synchronising problems. - Asynchronous lines (Interregional ties) - No increase in Fault level if interconnected. - Less Corona and RI. - Better Voltage regulation due to absence of Inductance. - Requires less insulation as the potential stress is less
Disadvantages
- Higher generation is not possible due to commutation - Step-up/Step-down is not possible. - Limitations in HVDC CBs, Switches etc.
25 December 2013 PMI Revision 00 38
Cost
Break Even distance
Cost of Substation
25 December 2013
500
PMI Revision 00
700
900
km
39
25 December 2013
PMI Revision 00
40
THANK YOU
25 December 2013
PMI Revision 00
41