Abutment
Abutment
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
railing 8" slab deck 75" 73" 4" 99" 75" 4" 73" 4.0' = 48" 71"
20.0' = 240"
deck
8"
99"
BT-63
63"
bearing
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
Railing
Bent cap
4.0'
30"
5.0'
8.5'
20.0'
Foundation
Foundation
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
Abutment
Abutment
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
Abutment
Bent cap
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
Abutment
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
railing
Ground level
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
Z = -6.083' Z = -6.25'
Z = -6.25'
Z = -6.083' Z = -8.25'
Abutment
Bent
22.0'
Z = -30.25'
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
10
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
11
Default materials
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
12
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
13
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
14
Specify the Frame Sections used for the bent cap, bent columns, and girders
BT-63 Girders
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
15
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
16
See the next page for a hidden result of selecting a Rectangular concrete section
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
17
Selecting a Rectangular concrete Frame Section automatically adds the default reinforcing steel A615Gr60 (note default sizes, etc.) to the list of Defined Materials
Confirm by going back to Step 3.1 in the Bridge Wizard
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
18
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
19
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
20
Deck Sections
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
21
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
22
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
23
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
24
Bearings
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
25
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
26
Abutments
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
27
Bearing "fixed" abutment support Same abutment named Abutments used at both ends of the bridge Recall that the bearings are not part of the abutment definitions
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
28
Bent
The bent consists of the bent cap and the bent columns. The fixity condition at the base of the column is part of the bent definition. In Option 1 the columns are assumed fixed at the ground level, as shown below. A different fixity definition will be required in Option 2 (pile/cap foundation)
Bent
Columns assumed fixed at ground level
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
29
Assumed bearing condition at the bent The deck sections in both spans are assumed continuous across the bent cap. This is permitted only when both deck sections on either side of the bent are the same. The deck sections are supported (at the undersides of the girders) on pinned bearings that lie transversely along a single bearing line at the centerline of the cap.
Deck sections in both spans lie on same bearing line Pinned bearing Bent cap
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
30
1 2
The cap "fits" in bridge such that the origin of the cap coordinate system is at the left end of the cap, viewed in the structure +X direction
Y Z X
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
31
View from X = 0
22.0' 5.0' 1
Bent cap 3.0'
4.0'
30"
5.0' 8.5'
22.0'
20.0'
Fixed base
Fixed base
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
32
Bent
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
33
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
34
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
35
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
36
Z X
Line load named RIGHTRAIL: Global coordinate system gravity load ( -Z direction )
Assume 300 lb/foot = 0.3 kip/foot Assume applied 9" = 0.75 ft from right edge of bridge
VIEW
"Left" and "right" bridge edges are as seen looking along the bridge layout line, in the +X global coordinate direction
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
37
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
38
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
39
Z X Layout line Bearing Start abutment Bent End abutment Span from bent to end abutment 80 ft
Deck sections, bearings, abutments, and the bent will be assigned to Bridge Object after the Bridge Object has been created
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
40
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
41
Default Bridge Object Reference Line based on Layout Line defined in Bridge Wizard Step 2
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
42
Name the Bridge Object Bridge_object and then divide it into two segments by inserting a bent at X = 80 ft.
Note that the "Bent" shown above is a generic term. It is not the bent Bent_fixed_base defined in Bridge Wizard Step 4.4. This specific bent will be assigned to the Bridge Object in Wizard Step 7.
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
43
This panel could be used to assign deck sections, bearings, abutments and bent properties. However, the Bridge Wizard will be used in this example
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
44
Start abutment
Bent
End abutment
It only takes one Deck Section assignment for both spans because one Bridge Object includes both spans
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
45
This is the only Bridge Object that has been defined. It is used by default.
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
46
Since there has been defined only one Deck Section, by default it is assigned to both spans included in the Bridge Object
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
47
End Abutment
Bent
Start Abutment
Bent
In the Bridge Object definition, Start Abutment, Bent and End Abutment are the names of specific points along the layout line
Start Abutment
End Abutment
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
48
railing 8" slab deck 75" 73" 4" 99" 75" 4" 73" 4.0' = 48" Roller bearing Pinned bearing 20.0' = 240" Roller bearing 71"
Ground level
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
49
Details and dimensions assumed at the start (X = 0) and end (X = 160 ft) abutments
Z
rail
Z
rail
X
73" 75" 71" 8" deck slab
X
8" deck slab
BT-63 girder
Roller bearing
Z = - 75"
Z = - 73"
BT-63 girder Action point of bearing (assumed at mid-depth of bearing assembly)
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
50
Default
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
51
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
52
Repeat at End Abutment ( X = 160 ) - in this example, end abutments are the same
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
53
railing 8" slab deck 75" 73" 4" 99" 75" 4" 73" 4.0' = 48" Roller bearing Pinned bearing 20.0' = 240" Roller bearing 71"
Ground level
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
54
8" deck
rail
99"
75"
73"
71"
Z = -75"
Z = -73"
4.0' = 48"
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
55
Default
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
56
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
57
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
58
Default
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
59
Each Line Load extends from X=0 to X=160 Assign railing loads to DEAD load case
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
60
Update Linked Model to incorporate the assignments just made to the Bridge Object Bridge_object :
Bearings, Abutments, Bent, Line Loads
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
61
This step assembles the Bridge Structural Model used for analysis and design
Note: Could also Update as Spine Model Using Frame Objects for most cases.
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
62
Still in Home Tab because Bridge Wizard has been used up to this point
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
63
Note: Could also create a bridge model by Updating as Spine Model Using Frame Objects for most cases.
1. Open Bridge Tab. 2. Turn off Automatic Update. 3. Use manual Update from now on
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
64
In the Bridge tab, manually Update to get back to the Area Object Model for remainder of this Example
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
65
Use this portion of Home tab to select and control viewing the model
Z Y X
Default view: 3-d skeletal view
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
66
Pan (move image within view area) Rotate image (takes some getting used to)
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
67
Move through planes defined by grid lines (during drawing or editing) Refresh displayed image (useful at times)
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
68
Set Display Options (not all options are available at the same time)
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
69
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
70
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
71
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
72
XZ perspective view
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
73
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
74
YZ perspective view
Z (up)
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
75
Perspective view
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
76
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
77
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
78
Toggle Action between Run and Do Not Run Select Do Not Run
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
79
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
80
Deflection at bent due to elastic shortening of the bent columns and the piles
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
81
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
82
Various deflections
Z (U3)
X (U1)
U3 = -0.0263 in U3 = -0.2947 in
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
83
Moment diagram
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
84
Z
Node J (end of girder)
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
85
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
86
Railings:
L = 80 ft
Mneg(max) =
w L2 8
(AISC Manual)
Mneg =
w L2 8
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
87
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
88
R = 369.5 kips
Rubberband Zoom
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
89
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
90
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
91
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
92
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt
93
Save as:
Example2-Two-Equal-Span-Option1.bdb
This is the option just completed in which the two columns are fixed at their bases
Save as:
Example2-Two-Equal-Span-Option2.bdb
This will be the starting point for the next option in which pile-cap/piles foundation will be used
10/20/2011
Example2-Two-Equal-Spans-Option1-Final.ppt