Académique Documents
Professionnel Documents
Culture Documents
AGENDA
INTRODUCTION EXPORTING TOOLS AND NAVIGATION TECHNIQUES SETUP CLASH DETECTION FIRST MEETING MEETING FOLLOW-UP FOLLOWING MEETINGS TIPS AND TRICKS BEYOND CLASH DETECTION
INTRODUCTION
CLASH DETECTION
WALK-AROUNDS
TIMELINER
WHEN DO WE START?
~50-75% Design Development - Walls and architectural design should be set - Model should be detailed Existing model should be accurate Having regularly scheduled meetings Have a regularly scheduled upload date
EXPORTING
FILE TYPES
NWD Complete data. Can be shared and viewed with Navisworks Freedom or other Navisworks programs. NWF Master file set with links to reference other. Cannot be opened with Navisworks Freedom NWC Created when exported from Revit or brought in from AutoCAD
EXPORTING
From Revit Install Navisworks Exporter Tool Set up Navisworks 3D Export View Shared and Internal Coordinates From CAD - Set up view - Save as DWG file
1 2
8 3 4
5 6 6 7
1. APPLICATION BUTTON AND MENU 2. RIBBON 3. CLASH DETECTIVE AND SELECTION 4. PROPERTIES
5. 6. 7. 8.
NAVIGATING
View Cube Navigation Wheel Orbit, Constrained and Free Look Around Panning Walking, Gravity and Collision Flying
INCREASE PRODUCTIVITY
SETUP
FILE ORGANIZATION
1. Create a separate clash detection folder 2. Do not have any dates or version numbers!
MEETING AGENDA
11X17 Clash summary
LARGE PROJECTS
May want to separate by floors Adjust naming for easier clash detection
FIRST MEETING
PROCEDURE
1. Review clashes during meeting 2. Comment and tag
MEETING FOLLOW-UP
SAVING VIEWPORTS
1. Check options editor for viewport settings to save override materials and transparencies 2. Save reports as html and print to PDF
NAVISWORKS FREEDOM
Save as a NWD file for consultant and contractor review. Free viewer - Redlines and comments visible - Navigation tools available - Unable to make any changes or add comments
FOLLOWING MEETINGS
PROCEDURE
1. 2. 3. 4. 5. Get updated files from everyone! Make sure file name is the same Update tests Review both old and new clashes Repeat meeting and follow up procedure
CONTEXT VIEW
1. Set up home view 2. Change view in context from view all to go to home view
SECTIONING TOOL
Viewports < Enable Sectioning
3D GRIDLINES
Create Entourage 3D Gridlines in Revit
BACKGROUNDS
View < Scene View < Background
PROCEDURE
1. 2. 3. 4. Select objects from the selection tree Go to Sets Right Click Add current selection
PROCEDURE
1. 2. 3. 4. 5. Go to Find Items Select file/files to search Create search criteria and Find all Sets and Right Click Add Current Search
ANIMATIONS
TIMELINER
QUESTIONS?