ENVIRONMENTAL ISSUES
POWER DEMAND-SUPPLY GAP COMMERCIAL
STAGES OF PLANNING
CONSTRUCTION STAGE INVESTMENT DECISION STATUTORY CLEARANCES EVALUATION & APPRAISAL ENVIRONMENTAL TECHNO ECONOMIC COST ESTIMATE FEASIBILITY REPORT/ OTHER INPUTS DETAILED PROJ REPORT CIVIL, MECH, ELECT & C&I INPUTS BASIC ENGG SITE SPECIFIC STUDIES/INVESTIGATIONS PROJECT SITE SELECTION/PRE-FEASIBILITY STUDIES FEASIBLITY
Basic Inputs :
BASIC INPUTS
LAND
Location & Approach Requirement Site Specific Data Siting Criteria of MOEF Land Use Plan Land cost
BASIC INPUTS
FUEL
FEASIBILITY REPORT
COST ESTIMATES & FINANCIAL ANALYSIS FINANCIAL APPRAISAL BY FIs INVESTMENT APPROVAL OF THE PROJECT
TOPOGRAPHICAL SURVEY
FR PREPARATION
EIA STUDIES
MODEL STUDIES FOR CW SYSTEM MGR & RAILWAY SIDING STUDIES AREA DRAINAGE STUDIES SEISMIC STUDIES
Site Clearance from MOEF (pithead) Land Commitment (State Govt.) Water Commitment (State Govt.) Fuel Commitment (SLC-LT) Fuel Transportation Clearance (Min. of Railways) Defence Clearance (Min. of Defence) Comfort Letters from Beneficiaries Resolution in Respective REB Meeting in respect of Absorption of Power from the Project
Associated Transmission System (ATS) Clearance NOC from Airports Authority of India Minutes of Public Hearing from SPCB Concurrence of Central Water Commission/ MOWR on Water Availability Environmental Clearance from Ministry of Env. and Forests
Tie-up of Basic Inputs Conduct Site Specific Studies/ Investigations Basic Engg./System Finalisation Technical Inputs (Write up, BOQ, Drawings) Inputs other than Technical Clearances / Commitment Financing Plan Cost Estimates
Financial Appraisal by FIs post FR/ DPR Finalisation TEC of CEA Pre and Post Electricity Act- 2003 Scenario Development of Infrastructure Financial Appraisal by FIs prior to Investment Decision Statutory Clearances/ Commitments
Executive Summary Introduction Demand Analysis and Justification Feasibility Studies Layout Systems Civil Works Mechanical Systems Electrical Systems Control & Instrumentation Systems
Environmental Aspects Technical Data & Bill of Quantity Cost Estimate & Financial Analysis Project Implementation Manpower training & Placement Operation & Maintenance Philosophy Marketing Philosophy List of Annexure List of Exhibits
INFRASTRUCTURE DEVELOPMENT
Initiate activities for land acquisition under Land Acquisition Act Construction of Boundary Wall/ Fencing of the acquired land Construction of Site Office, Stores and other temporary building to facilitate construction activities Site Levelling of Plant incl. Priority Area of Township Construction Power & Start-up Power
INFRASTRUCTURE DEVELOPMENT
Construction Water Scheme Communication & EDP facilities Training Centre, Public Information Centre and other R&R activities Primary Health Care Establishment of Security Complex
INVESTMENT APPROVAL
Availability of Infrastructure All clearances/ commitments in position PPAs signed with beneficiaries ATS finalised and would be implemented matching power project schedule. Financial Appraisal by FIs prior to Investment Decision
Green Field
Expn. Project
Site Selection/Pre FR
Specs. Preparation 10 7
3
10
0
7
12
12 13
9 10
NIT
14
OBD
17
14 Environmental Clearance 19 16
Financial Appraisal
18
15
20
17
Investment Approval
19
16
Simhadri-II
Bongaigaon North Karanpura Barh-II
1000
750 1980 660
Nabinagar JV
Darlipali Mauda Ultra Mega Project
1000
800 500 800
Total
21,690
14,930
Project Name
Kawas CCPP, Stage-II* J. Gandhar CCPP, Stage-II* Rajiv Gandhi (Kayamkulam) CCPP, Stage-II**
Total
* **
4,550
To be taken up after fuel availability is ascertained.
4,550
Project Name
Total
2,211
2,211
Grand Total
28,771
21,851
Location
Capacity (MW)
Rihand-III
Integrated Project in Talcher Area (JV with CIL) Lara Integrated Project Tanda-II Talcher Area (Orissa) Raigarh (Chhattisgarh) Ambedkar Nagar (U.P.)
500
3200 4000 1000
Nuclear Total
2000
20,160
Capacity (MW)
Kalai-I
Kalai-II Hutong-I
Ar. Pradesh
Ar. Pradesh Ar. Pradesh
1450
1200 588
Hutong-II
Etalin Attunli
Ar. Pradesh
Ar. Pradesh Ar. Pradesh
1250
4000 500
Total
9248