2. Section II 3. Section III. 1 4. Section III. 2 5. Section III. 3 6. Section IV. 1 7. Section IV. 2
: Purwakarta : South Purwakarta Plered : Plered Cikalong Wetan : Darangdan Cikalong Wetan : Cisomang Bridge : Cikalong Wetan Cikubang : Cikubang Bridge
8. Section IV. 3
9. Section IV. 4 10. Summarize
04.11.2004
1. General Overview
1. Total Length is 40 km
2. Divided by 9 Sections 3. Starting in March 2004 & done before April 25, 2005 (The 50th Anniversary of Asia Africa Conference in Bandung, West Java) 4. Starting with earthworks in March 2004 & continuing with concrete works in July 2004 5. Girder produce insitu & by precaster (Adhi Precast, Wika Beton, & Saeti)
04.11.2004
2. Section I : Purwakarta
1. Main Contractor is Mawatindo
2. Supervision Consultant is Virama Karya 3. Total Length is 9 km
04.11.2004
2. Section I : Purwakarta
04.11.2004
3. Total Length is 8 km
4. Concrete supplied by Adhimix 5. Concrete Volume 80,000 m3 for Rigid Pavement only
04.11.2004
04.11.2004
6. Admixture supplied by Fosroc (SP 337 & RP 264 M) to Yasa Readymix & Grace to Multi Structure
7. Girder produced in situ with total 153 pieces using Yasa Readymix
04.11.2004
04.11.2004
3. Total Length is 4 km
4. Concrete supplied by Dwi Dinamika 5. Concrete Volume 40,000 m3
04.11.2004
10
04.11.2004
11
04.11.2004
12
04.11.2004
13
3. Total Length is 5 km
4. Concrete supplied by Focon Indo Beton 5. Total Concrete Volume is 30,000 m3
6. Admixture supplied by BASF (Pozz. 101 Ri & Rheobuild 1100) & Sika (Plastiment R & Sikament NN )
7. Girder supplied by Wika Beton ( Glenium 317 from BASF & M 21 N from KAO)
04.11.2004 14
04.11.2004
15
7. Girder supplied by Wika Beton ( Glenium 317 from BASF & M21N from KAO)
04.11.2004
16
04.11.2004
17
04.11.2004
18
04.11.2004
19
3. Total Length is 4 km
4. Concrete supplied by Beton Indotama Surya 5. Total Concrete Volume is 30,000 m3
04.11.2004
20
04.11.2004
21
11. Summarize
1. We got about 50 % share of the project
2. We supply to Adhimix Citapen (1 BP), Focon Indo Beton (1 BP) & Farika Duta Agung (2 BP in Purwakarta & 1 BP in Padalarang)
3. Sales value more than 500 million in 6 months (July to December 2004)
4. Farika Duta Agung Padalarang gave the biggest contribution for our sales value
04.11.2004
22
THANK YOU
04.11.2004
23