Oil was discovered at Bu Hasa in 1962. First well was discovered Bu-12, started in 1962 and by 1965 the field was in production from the Shuaiba Reservoir, followed in 1971 from ThamamaB, and in 1995 from Thamama-F. The oilfield covers an area of approximately 600sq kms, comprising reservoirs formed of shallow-water limestone separated by dense limestone, located at depths between 7500 and 9250ft, known as the Thamama Group.
The oil is produced predominantly by natural flow, currently from 69-single completion, 137 dual completion, 10 oil producer/water injector, and 3 artificial lift wells. The oil flows via single flowlines from each well to one of three Remote Degassing Stations and onward to, or direct to, one of the four Central Degassing Stations . For upto-date well status, refer to the Bu Hasa Monthly Well Status Summary maintained by Production Engineering.
Choke Housing
Swap Valve
Wing Valve Wing Valve Non Return valve
Master valve
Casing/Tubing
Isolation Valve
CRUDE OIL
Short String
Casing /Casing
Expansion Loop
NRV 6 x 900
Test header
Battery Limit Valve
Production header
Transfer Line
By Pass Valve
M1
Bottom Pipe
OIL FLOW
M1
Bottom Pipe
OIL FLOW
From Bank-1
From Bank-2
From Bank-3
GAS
Boot pressure 2.77 PSI
BOOT
OIL
GAS
Flow Suction Tank
OIL WATER
Recycle Valve
Suction MOV
Discharge MOV
BOOSTER PUMP
Orifice Meter
Oil Flow To Sulzer
Turbine Meter
Strainer
The Well Head is located on the top of the well casing string.
X MASS TREE is the combination of valves which is located on top of well head.
A Large Valve on the Xmas tree used to control the flow of oil
Its Mainly used for Wireline Activities and to take closed in or flowing pressure .
Surface controlled sub-Surface Safety valve Used to open or close the well by Hydraulic control panel. Placed in a landing nipple of the tubing string of wells approximately 150 ft (45 m to 75 m).High pilot Trip on 1000 PSI Low pilot Trip on 250 PSI (Emergency Safety Valve).
Valve is mounted on the X-mass tree assembly that protects flow of fluids against High/Low pressures.
High pressure (Separator 1st stage 280 psi & 2nd stage 80 psi ) High level (Separator 1st stage 75 % & 2nd stage 75 % ) Low level (Separator 1st stage 25 % & 2nd stage 25% ) High level Flow suction tank low level Flow suction tank high level Gas Scrubber low pressure Instrument Air
The Capacity of all station are 50,000 B/D Except Bu-1 Bank-1 1st Stage Sep Capacity 20,000 B/D.
Separator
Operating Pressure High pressure trip High level trip low level trip Safety valve set
1st Stage
250psig 280psig 75% 25% 350psig
2nd Stage
45psig 80psig 75% 25% 125psig
A tubular device placed vertically in side and out side a larger vessel, through which wells fluids are conducted before entering the larger vessels. (Separate Oil & Gas. Oil will go to the FST and Gas will go to the GASCO Blower. Operating pressure Safety Valve Set 2.77 psig 8.00 psig
Used to Stabilize the Crude for Constant Supply for Booster Pump and no gas will go to Booster Pump.
Its Fixed Roof Tank Operating Pressure High Pressure alarm 1.5 H2O 3. 5 H2O
BU-1
150,000 B/D
BU-2
BU-3 BU-4 OLD
150,000 B/D
200,000 B/D 300,000 B/D
NEW
Station BU-1 BU-2 BU-3 BU-4 Old BU-4 New HI/Level S/Down 32.25 FT 32.25 FT 31.67 FT 35.33 FT 35.33 FT
300,000 B/D
L/Level Alarm 21.42 FT 21.42 FT 21.5 FT 21.58 FT 21.58 FT L/Level S/Down 19.58 FT 19.58 FT 19.58 FT 19. 67 FT 19. 67 FT
This pump will Boost the pressure of fluid received from the FST and pumped to the next station or sulzer or terminal.
4 Psig.
140 Psig.