To design an MTBE plant that produces 100,000 tons of MTBE per year. MTBE is a gasoline additive. The reaction is between isobutene and methanol as follows: (CH3)2C=CH2 + CH3OH (CH3)3C-O-CH3
Process Description
Site Selection
Comparison Factor Utilities: Fuel supply Electric power Water supply Plant location: Raw material availability Energy availability Transportation Facilities Plant location: Water supply Labor supply Site characteristics Waste disposal facilities Score (out of 9) Site (1) Salalah Site (2) Rusail Site (3) Sohar
Heat Exchanger
Purpose Description Sizing Data
Reactor
(CH3)3C-O-CH3
Distillation
Economic evaluations:
Total cost
Cost of Manufacture
Bare Module
Working Capital
Manufacture Cost
General Expenses
Direct
Indirect
Calculations:
To calculate the Cost of Operating Labor (COL):
N=4 vessel + 3 tower + 5 heat exchanger + 4 pumps = 16 NOL = (6.9 +1.71P2 +0.23Nnp)0.5 = (6.29 +31.7*0 +0.23*16)0.5 = 3.16 op/shift NOP = (4.5) shift/day * NOL =4.5 * 3.16= 14.22 14op/day 52900$ = cost of labor (per operator/year) COL = NOP * cost of labor = 14 * 52900$ = $740600/year
To calculate the Cost of Manufacture (COM) without depreciation: COMd= 1.23(CRM + CWT + CUT) +2.73 COL + 0.180 FCI
= 1.23(74932776 + 0 + 15222900) +2.73*740600 +0.180*619000 =$113* 10^6
Con.start
start up
HAZOP
What is it Its purpose Concept Key words
procedure offering potential to improve the safety, reliability and operability of process plants by recognizing and eliminating potential problems when designing
An identifying technique leading methodically to most potential and detectable deviations which could conceivably arise in the course of normal operating routine
1. Taking description of a process, questioning every part of it to establish the deviations 2. Assessment is made. 3. Action is then taken.
Primary
Secondary
FIC
V-901
R-901 Methanol E-903
T-903 V-903
cw
LI C
FIC
P-904 A/B cw
Butylenes feed
FIC
V-902
LI C
T-901
LIC
E-902
hps
MTBE
SET
D
TI 128
CSO CSO
V 3"-P-102
PI 104
SIZE x 1" SET 100 PSIG COOLING WATER RETURN 6"-CW-102 UCD-BA2
2"-P-119
4"-P-104
8"-P-103
2"-P-110
EX-101 FEED/BOTTOM EXCH 1/P COOLEDBOTTOMS TO STORAGE PCD-AA3 2"-P-119 FC 1/P COLUMN FEED FROM FEED DRUM V-101 PCD-AA1 FC
TT 126 LAH 120 FE 101 FT 101 FRC 101 FY 101 FV 101 TI 102 LV 119 LY 119 LIC 119 TR 103
Node: Overhead line 8-P-103 Type: Line EX-102 LIGHT ENDS CONDENCER C-101 Design Conditions: 427.75 kmole/hr at FO LIGHT ENDS STRIPPER 500 kpa & 56.27 C
FY 116
PT 106
N.C.
3"-P-104
FY 116
D D
1/P
2"-P-101
6"-P-113 1/P FROM M.P. STEAM HEADER 3"-S-101 UCD-AC1 FC EX-103 REBOILER TO CONDENSATE RETURN HEADER UCD-AC1 3"-S-102
ST LAL 121 LSL 121 LT 119 TV 126 TY 12 TRC 126
21
Deviation: High pressure Guide Word: High Parameter: Pressure Design Inlet: 500 kpa
TI 117 FRC 116 FT 116 FE 116 LSLL 116 LALL 116 LG 118
1-P-105
UCD-AB1 FO TO FLARE
LT 107
TAL
LSH 120
LAH LAL
LIC 107
1.5"-P-118
MS 122
2"-P-109
Cause: Blocked discharge AUTO START SPARE Consequences: Over 2"-P-106 pressuring of PUMP (P-101S) stripper Safeguards: 1. PVS-105 relieving to flare D 2. Check valve. 3. Isolation valve actuated on reverse flow condition
PSLL 109
PALL 109
FR 106 FE 106
LY 107
1/P
LV 107
FT 106
3"-P-106
MOV 122
CLOSE
3"-P-107
2"-P-116
3"-P-106
2"-P-106
V
PI 123
AUTOSTART
XI 128
XI 129
RUN
STOP
XI 126
XI 127
3"-P-106
PI 110
PI 111
RUN
STOP
XI 113
XI 112
XI 115
XI 114
RUN
STOP
RUN STOP
3"-P-107