INTRODUCTION


Location of project/activities carried out in the
course of the project

History of ministry of Niger Delta Affairs (MNDA)


Scope of works


Organizational chart



Ministers Office
Minister of States Office
Permanent Secretarys Office
Director Highway
Deputy Director Highway
Engineers Representative
Assistant Engrs Representative
Administrator Maintenance Chief Resident Engr
Receptionist Secretary
Clerk/typist
Laboratory Superintendent Resident Engr (1)
Resident Engr (II)
Technology Assistant
Me (industrial trainee)
Maintenance
ACTIVITIES OF DIFFERENT SECTIONS
ON SITE


Earthmoving

Bush clearing carried out by an
excavator.
A bulldozer carrying a leveling process
on the excavated subgrade.
Excavation of unsuitable material.
A sheep-foot roller compacting the
excavated subgrade.
Contd.
Cement stabilization
Spraying of cement by a wheel loader
ready for stabilization process.
A pulverizer carrying out sand-cement
mixing (sand-cement stabilization).
Bridge/Pile construction

Pile work process
A casen used for pile casting.
A reinforcement cage used for pile
casting.
Contd.
Insertion of pile casen by the crane with
the use of a vibro-machine into the
ground.
A drilling rig carrying out a drilling process
in the pile casen.
Contd.
A concrete pump ready for pile casting through the triming pipe inserted into
the drilled pile.
Reinforcement detail used for the pilling work
Size/thickness
of reinforcement
Length
(m)
Lap
length(m)
No of
reinforcement
used
26 T
20
2.8 120 1
26 T
20
11.7 120 2
26 T
25
12 150 1
24 T
32
12 190 1
Contd.
Number of casen used/length of each casen
No of casen used Length of casen(m)
1 7.5
1 12.5
2 5
Contd.
Construction of side drains (U-drain)
A reinforcement cage / A casted drainage base of a U-drain system.
Contd.
Casting of the drainage wall after the drainage form work.
PROBLEMS ENCOUNTERED

Industrial training placement



Poor pay pack



No insurance cover

RELEVANCE OF SIWES PROGRAMM

Acquisition of industrial skills and experiences in
their course of study.


The program prepares students for work
situations/conditions they are likely to meet after
graduation.




WAYS OF IMPROVING THE PROGRAM

Industrial training students should be exposed to
all companies facilities and jobs, since they are
the future of industrialization.

Establishments should be forced to offer
attachment to industrial training students.



ADVICE FOR FUTURE PARTICIPANTS

They should put in their best regardless of the
pay pack.


They should obey safety measure.




ADVICE FOR SIWES MANAGERS

SIWES officials, should carry out a routine check
at their students place of work.



CONCLUSION

SIWES programme is a plus to the Nigerian
educational system, as students are exposed to
practical experience s and good morals.




ACKNOWLEDGEMENT
Ministry of Niger Delta Affairs (MNDA)
Engr. Igwe
Engr. Odia
Engr. Leo
Engr. Henry
Engr. Steve
All Lecturers of Civil Engineering Department /
The School Authority
Surv. K. A. Raheem

Vous aimerez peut-être aussi