Vous êtes sur la page 1sur 16

Introduction for RST

(13 October 2012)


Project Name : LPG Refrigerated Storage Project
Client : PetroVietnam Gas Joint Stock Corporation
Contents
1. General Information
2. Structure
3. Detail Description
4. Insulation
5. Summary
1. General Information
Capacity : 30,000 ton
Content : Propane / Butane
Type : Single Containment
Design Condition
- Pressure : 150 mbarg / -4.9 mbarg
- Temperature : -45
BOG Rate : 0.05 weight % / day
Materials
- Inner Tank : Low Temperature Carbon Steel A537 Class 1
- Outer Tank : Carbon Steel A36
Weight



Total Nozzle Qty : 76 ea (Inner : 22 ea, Outer : 54 ea)

Propane Butane
Empty 2,908 ton 2,908 ton
Operating 34,626 ton 34,698 ton
2. Structure
Inner Tank
Suspended Deck
Outer Tank
Roof
Annular Space
Inner Tank can contain low temperature LPG. (Single Containment)
Annular Space are filled with insulation. + Suspended Deck is covered with insulation
Air(BOG) can move freely between inner tank and outer tank. (Deck Vent, 10mm gap)
Dome area is ambient temperature. No low temperature.
3. Detail Description
Instrument Nozzle
N12 : LTD Level Transmitter
N13A/B : Radar Level Transmitter
N14 : Level Transmitter (High Level)
N15A/B : Temperature Transmitter
N16 : Pressure Transmitter
N17 : Pressure Transmitter
N18 : Pressure Transmitter
N19 : Pressure Transmitter

Filling Nozzle
N1 : Top Fill (20)
N2 : Bottom Fill (20)

3. Detail Description
Pressure Relief & Vacuum Relief
N7A/B : Pressure Relief (12)
N9A~C : Vacuum Relief (12)

Pressure Relief Valve
- 1 Operating, 1 stand-by
- Set Pressure : 150 mbarg

Vacuum Relief Valve
- 2 Operating, 1 stand-by
- Set Pressure : -2.2 mbarg
3. Detail Description
Cool Down Sensor & Leak Detector
N27A/B : Cool Down Sensor (12)
N28 : Leak Detector (12)

Cool Down Sensor (Inner Tank) : Temperature monitoring during cool down
- 13 ea in shell side
- 9 ea in bottom side

Leak Detector (Annular Space) : Leak Detection during operating
- 16 ea in bottom side
3. Detail Description
Manhole
M1 : Manhole (36) For Maintenance
M2 : Manhole (54) For Construction
M3 : Manhole (36) For Construction, Shell Side

M1
M2
M3
Man can access through only M1 Manhole !
3. Detail Description
Davit
1 Ton Davit for Maintenance

3. Detail Description
Perlite Filling
N26 : Perlite Filling 40 ea

3. Detail Description
Cool Down
N4 : Cool Down

13 spray nozzles will be used.

3. Detail Description
Access Way
Spiral Stairway : For access
Vertical Ladder : For emergency
3. Detail Description
4. Insulation
Perlite Powder
Resilient Blanket
(1150 mm)
Dry Sand
FoamGlas
(2125 mm)
Leveling
Concrete
Perlite Concrete Block
Perlite Powder
Resilient Blanket
(1150 mm)
Fiber Glass Blanket
(4100 mm)
4. Insulation
5. Summary
Dry Sand
FoamGlas
Leveling Concrete
Top Fill, Bottom Fill
Leak Detector
Cool Down
Sensor
Use only M1(36) M/H
for access
Cool Down Nozzle
Resilient Blanket
Perlite
Fiber Glass Blanket
Instrument Nozzle
Top Davit

Vous aimerez peut-être aussi