Vous êtes sur la page 1sur 37

 D efine

M easure
A nalyze
I mprove
Operational C ontrol

Excellence
Six Sigma

Six Sigma: DMAIC; Y=f(x)


Is it a Goal, a Measure, a Process,
a Tool or an expletive deleted?

By Lee Olson
 D efine Presentation to INFORMS
M easure
A nalyze
I mprove
C ontrol
 D efine
M easure

Objectives A
I
nalyze
mprove
C ontrol

l Understand the Basics of the Six Sigma Program


l Understand How Six Sigma Relates to Lean, TOC, TQM
 (Theory Of Constraints; Total Quality Management)
l Ability to Define a Strategy and Roadmap for Success

Operational Excellence Training


 D efine
M easure

Define A
I
nalyze
mprove
C ontrol

l
l
Is it a Goal, a Measure, a Process, a Tool or an expletive
deleted?
l
l
l
lYes

Operational Excellence Training


 D efine
M easure

Define A
I
nalyze
mprove
C ontrol

Six Sigma

l Is a management methodology
 Customer focused
 Data driven decisions
 Breakthrough performance gains
 Validated bottom line results
l

Operational Excellence Training


 D efine
M easure

Customer Focused A
I
nalyze
mprove
C ontrol

ON TIME DELIVERY (sample)


The percentage of sales order line items that ship complete on or before the original customer promise date, for
all line items shipped in the month.

On-Time Delivery

Our Performance Compared to Competitors


Pareto of Drivers
100%
90% 100%
80% 75%

% Impact
70%
60% 50%
50%

Complete
25%
40%
30% 0%

xyz Cell

Credit Hold

Engineering
Deliveries

Unrealistic

on part abc
Always

Orders on
Supplier

Low Yield
Promise
20%

Late

Change
Orders
Late

Date
Target
10%
Importance to Customers

Quality OTD
0%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Reason

Top 5 Action Items


Original Due Current

High
Driver Action Description Status Status Description Ow ner Date Due Date
Late Supplier Deliveries Monthly reporting to suppliers on delivery & On Report Cards Implemented. Adam 5/21 5/21
quality metrics. track

Late Supplier Deliveries Arrange face to face meetings with top On Meetings Complete with top 10 Beth 6/15 6/15
offenders. track Suppliers.

Late Supplier Deliveries Review and approve supplier's corrective action Caution Corrective Action Plan in Place for 2 Carlos 7/15 9/15
plan. major Suppliers

xyz Cell Always Late Kaizen Event to focus on improving throughput On Event held 5/1. 25% throughput Doreen 5/21 5/21
by 40% and improve labor efficiency by 35% track improvement in May. Labor Efficiency
Increase of 30%
Unrealistic Promise Date Focus on custom products to provide realistic Problem Continued lack of progress. Re- Earnest 6/15 8/15
ATP based on inventory and leadtime of structured and focused team.
components. Developing detailed plan.

Training
Moderate-
Price
Shared Goals Complaints to-’Low’

We’re Better They’re Better

Operational Excellence Training


 D efine

Data Driven Decisions M


A
I
easure
nalyze
mprove
C ontrol

Y= f (X)
To get results, should we focus our behavior on the Y or X ?

 Y X1 . . . XN
 Dependent Independent
 Output Input-Process
 Effect Cause
 Symptom Problem
 Monitor Control
 Response Factor

Why should we test or inspect Y, if we know this relationship?

Operational Excellence Training


 D efine
M easure

Breakthrough performance gains A


I
C
nalyze
mprove
ontrol

(Distribution Shifted ± 1.5σ )

σσ PPM
PPM
2 308,537
3 66,807
4 6,210
5 233
6 3.4
Process
Process Defects
Defectsper
perMillion
Million
Capability
Capability Opportunities
Opportunities

Sigma is a statistical unit of measure which reflects process


capability. The sigma scale of measure is perfectly correlated to such
characteristics as defects-per-unit, parts-per million defective, and
the probability of a failure/error.

Operational Excellence Training


I
L mott o BP not ca p m
ri c
e
In
cr
ea
Vo M se
lu at
m er
ia
e lC
In
c. os
w ts
ith
Le
ve
ra
M g e
an
uf
ac
tu
rin
g
Vo
lu
m
e SG
In

Operational Excellence Training


c. &A
No
Le
ve
ra
g e

Ta
x
Factors
es

La
G W bo
en or r
ki
er
al n g
-5 Ca
% p
Pr ita
ic l
e
Assuming a 10% change in the factor

Re
d
Validated bottom line results

uc
tio
n

C
I
A
M
D efine

ontrol
mprove
nalyze
easure
 D efine
M easure

Define A
I
nalyze
mprove
C ontrol

Methodology

l Define
l Measure
l Analyze
l Improve
l Control

Operational Excellence Training


 D efine

Roadmap M
A
easure
nalyze

Example I
C
mprove
ontrol

Define
Customers, Value, Problem Statement Validate
Scope, Timeline, Team Project $
Celebrate Primary/Secondary & OpEx Metrics
Project $ Current Value Stream Map Measure
Control Voice Of Customer (QFD) Assess specification / Demand
Document process (WIs, Std Work) Measurement Capability (Gage R&R)
Mistake proof, TT sheet, CI List Correct the measurement system
Analyze change in metrics Process map, Spaghetti, Time obs.
Value Stream Review Measure OVs & IVs / Queues
Prepare final report

Validate
Project $
Validate
Project $

Improve Analyze (and fix the obvious)


Optimize KPOVs & test the KPIVs Root Cause (Pareto, C&E, brainstorm)
Redesign process, set pacemaker Find all KPOVs & KPIVs
Validate
5S, Cell design, MRS FMEA, DOE, critical Xs, VA/NVA
Project $
Visual controls Graphical Analysis, ANOVA
Value Stream Plan Future Value Stream Map

Operational Excellence Training


Plan Execute  D efine
•Strategic Link to Business Plan defined in Project Selection Process M easure
•Defined Business Impact with Op Ex Champion support A nalyze

DEF
Identify •Structured Brainstorming at all organizational levels I mprove
Problem •Cause and Effect Diagrams identifying critical factors C ontrol
•Primary and Secondary Metrics defined and charted
Operational Excellence

•Multi-Level Pareto Charts to confirm project focus

INE •Develop a focused Problem Statement and Objective


•Develop a Process Map and/or FMEA

PERFECTION
•Develop a Current State Map

ME
Practical
Problem •Identify the response variable(s) and how to measure them
•Analyze measurement system capability
Methodology

Solutions
Practical
•Assess the specification (Is one in place? Is it the right one?)

ASU •Characterize the response, look at the raw data


•Abnormal? Other Clues? Mean or Variance problem?
•Time Observation • Spaghetti Diagram • Takt Time

RE
ANA
Problem •Future State Maps • Percent Loading
Definition •Standard Work Combination
•Use Graphical Analysis, Multi-Vari, ANOVA and basic
statistical tools to identify the likely families of variability

LYZ •Identify the likely X’s


•5S • Set Up Time Reduction (SMED)
•Material Replenishment Systems

E
IMP
Problem •Level Loading / Line Leveling
Solution •Cell Design • Visual Controls
•Use Design of Experiments to find the critical few X’s
•Move the distribution; Shrink the spread; Confirm the results

ROV •Mistake Proof the process (Poka-Yoke)


•Tolerance the process
•Measure the final capability
Problem
Solving
ΠWhat do you want to know?

E
CO
Problem •Place appropriate process controls on How do you want to see what it is that you need
to know?
Control the critical X’s ŽWhat type of tool will generate what it is that you
•Document the effort and results need to see?
•Standard Work What type of data is required of the selected tool?
• TPM
Where can you get the required type of data?
Execute Plan
Based in part on Six Sigma Methodology developed by GE Medical Systems and Six Sigma Academy ,Cra
Incne. Co . Op . Ex . Methodology Originated by MBBs ; D . Braasch , J . Davis , R . D ugg ins , J . O ’ Callaghan , R .
 D efine

Define M
A
easure
nalyze

Key Items I
C
mprove
ontrol

l Customers, Value, Problem Statement


l Scope, Timeline, Team
l Primary/Secondary & OpEx Metrics
l Current Value Stream Map
l Voice Of Customer (QFD)
 (Quality Function Deployment)

Operational Excellence Training


 D efine

Project Selection M
A
easure
nalyze

Impact I
C
mprove
ontrol

l Business Impact
 Revenue Growth
 Cost Reduction
 Capital Reduction
 Key Business Objectives
 On Time Delivery
 Lead Time
 Quality
 Customer Satisfaction
l Impact on Operational Excellence Metrics

Operational Excellence Training


 D efine

Evaluate and Rank Suggestions M


A
easure
nalyze

Effort and Risk I


C
mprove
ontrol

l Effort required
 People Resources
 Capital Resources
 Duration of Project
l Probability of success
 Technical Risk

 Management Risk

l Impact vs. Risk vs. Effort


 Assess ROI (Return On Investment)
 Assign priorities to projects

Operational Excellence Training


 D efine
M easure

Evaluate and Rank Suggestions A


I
nalyze
mprove
C ontrol

Project Information Impact Effort Risk

Duration of Project
People Resources

Capital Resources

Management Risk
Capital Reduction

On Time Delivery
Revenue Growth

Cost Reduction

Technical Risk
Total Impact
Key Business

Total Effort
Satisfaction

Total Risk
Lead Time

Customer
Objective

Quality
Mfg
(M)
or
Admin
# (A) Project Description
Variable weightings 20% 15% 10% 15% 20% 5% 5% 10% 100% 50% 20% 30% 100% 40% 60% 100%
1 A Customer Billing Errors 0 2 0 4 4 2 2 5 2.4 2 1 3 2.1 1 4 2.8
Warranty
2 M 0 2 0 1 1 0 3 3 1.1 4 4 5 4.3 4 2 2.8
scrap warranty vs sales
3 A Vendor Delivery Performance 0 2 2 2 5 4 3 0 2.2 1 1 3 1.6 1 2 1.6
4 M On Time Shipping Performance 2 1 2 4 5 0 1 5 2.9 4 1 2 2.8 1 3 2.2
Hiring and Retention
5 A 20% - 24% Turnover 0 3 0 2 1 0 3 2 1.3 3 2 4 3.1 1 4 2.8

New Product Development Cycle Time


6 A 3 4 2 5 3 3 4 5 3.6 5 3 5 4.6 5 5 5.0

Manufacturing Maintenance
7 M 0 3 0 1 2 3 1 0 1.2 1 4 1 1.6 1 1 1.0
Tooling Maintenance
8 A Day Sales Outstanding (DSO) 0 0 4 2 0 0 0 0 0.7 1 0 2 1.1 1 1 1.0
9 M FTY of 65% on product 123 4 4 2 5 4 4 5 5 4.1 2 1 1 1.5 2 1 1.4

 Example tool to rank projects


 0106-01 Project Rating.xls

Operational Excellence Training


 D efine
M easure

Project Risk =
A
I
C
nalyze
mprove
ontrol
Project
Ranking Ball Size
Number
n

4 9
6

3 4
Impact

1
3
2

7 5
1 2
8

0
1 2 3 4 5
Effort

 Example chart to rank projects 0106-01 Project Rating.xls


 D efine
M easure

Measure A
I
nalyze
mprove
C ontrol

l Establish measurement capability


 Validate the database (transactional)
 Gage R&R (Repeatability & Reproducibility)
 Calibration is not enough
 Many (or most) measurement systems are not capable
 How good is the data you are using to make decisions?
l
l Fix the measurement system
 Enables calculation of process capability
 Enables calculation of alpha & beta risks

 This step is often skipped

Operational Excellence Training


 D efine

Analyze M
A
easure
nalyze

(and fix the obvious) I


C
mprove
ontrol

l Find all KPOVs & KPIVs


 (Key Process Output Variables; Key Process Input
Variables)
l FMEA, DOE, critical Xs, VA/NVA
 (Failure Modes Effects Analysis; Design Of Experiment)
l Graphical Analysis, ANOVA
 (Analysis Of Variance)
l Future Value Stream Map

Operational Excellence Training


 D efine
M easure

Improve A
I
nalyze
mprove
C ontrol

l Optimize KPOVs & test the KPIVs


 (Key Process Output Variables; Key Process Input
Variables)
l Redesign process, set pacemaker
l 5S, Cell design, MRS
 (Material Replenishment System)
l Visual controls
l Value Stream Plan

Operational Excellence Training


 D efine
M easure

Control A
I
nalyze
mprove
C ontrol

l Management of Change
 Owned by project champion and value stream manager
 Critical to long term success of project
 Physical and cultural changes
l Measurement controls
 On-going metrics
l Visual Controls
 Enable workers to self-manage the process

l

Operational Excellence Training


 D efine

Basic Implementation M
A
easure
nalyze

Roadmap I
C
mprove
ontrol

Identify Customer Requirements

Understand and Define


Entire Value Streams
Vision (Strategic Business Plan)
Deploy Key Business Objectives
- Measure and target (metrics)
- Align and involve all employees
- Develop and motivate
Continuous Improvement
(DMAIC)
Define, Measure, Analyze, Improve
Identify root causes, prioritize, eliminate
waste,
make things flow and pulled by customers

Control
-Sustain Improvement
-Drive Towards Perfection

Operational Excellence Training


3.0 Improve Customer Focus

3.1
3.2
2.0 Educate/Get Everyone Involved

2.1
2.2
1.0 Improve the Metrics

1.1
1.2

8
7
6
5
4
3
2
1
1
2
3
4
5
6
Your Manager's 1-Year
Breakthrough
Objectives

Train functional leaders as LGBs


Improve On Time Delivery to 98%
Establish tracking of OTD in every cell

Benefits
Conduct interviews with top 10 customers

Objectives
Train leadership team as Lean Green Belts (LGB)
Trainworkers inhow our products are used by our major customers

Your Annual Breakthrough

Indicator's and Goals


Complete 1 Leadership LGB training course

100% Completion of LGB Projects

Operational Excellence Training


Leaders have ability to map a value stream

Metrics module in all appropriate training sequences

Training projects demonstrate flowdown of metics to


✔ ✔ ✔
✔ ✔

operational level

Develop culture of teams


Trainees participate in customer survey


✔ ✔ ✔ ✔ ✔ ✔ ✔
✔ ✔

Complete 3 functional LGB training courses


✔ ✔ ✔ ✔ ✔ ✔ ✔
Type in
Key:

Bring reps from top 10 customers in for plant tours


-->



4

Implement lean concepts in top 3 volume lines


establish pareto of drivers for OTD


✔ ✔
✔ ✔
✔ Impact

IT
l

Operations


❍ ●

Quality

Engineering
Hoshin
● Owner

Maintenance
❍ ● ❍ ❍ ❍

Resource
m

Marketing



C
I
A
M
D

Training
❍ ❍ ❍ ❍ ❍ ❍ ●


❍ Support
efine

ontrol
mprove
nalyze
easure
 D efine
M easure

ON TIME DELIVERY (sample) A nalyze

The percentage of sales order line items that ship complete on or before the original customer promise date, for I mprove
all line items shipped in the month. C ontrol

On-Time Delivery
Pareto of Drivers
100%
90% 100%
80%
75%

% Impact
70%
60% 50%
50%
25%
40%
30% 0%

Engineering
Credit Hold
xyz Cell

on part abc
Deliveries

Unrealistic
Always

Orders on

Low Yield
Supplier

Promise
20%

Late

Change
Orders
Late

Date
Target
10%
0%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Reason

Top 5 Action Items


Original Due Current
Driver Action Description Status Status Description Ow ner Date Due Date
Late Supplier Deliveries Monthly reporting to suppliers on delivery & On Report Cards Implemented. Adam 5/21 5/21
quality metrics. track

Late Supplier Deliveries Arrange face to face meetings with top On Meetings Complete with top 10 Beth 6/15 6/15
offenders. track Suppliers.

Late Supplier Deliveries Review and approve supplier's corrective action Caution Corrective Action Plan in Place for 2 Carlos 7/15 9/15
plan. major Suppliers

xyz Cell Always Late Kaizen Event to focus on improving throughput On Event held 5/1. 25% throughput Doreen 5/21 5/21
by 40% and improve labor efficiency by 35% track improvement in May. Labor Efficiency
Increase of 30%
Unrealistic Promise Date Focus on custom products to provide realistic Problem Continued lack of progress. Re- Earnest 6/15 8/15
ATP based on inventory and leadtime of structured and focused team.
components. Developing detailed plan.
 D efine
M easure

Does it work?. A
I
nalyze
mprove
C ontrol

The top companies in Customer Satisfaction grow MVA at


nearly twice the rate of their poor-performing counterparts.

In Billions $
50
$42
Market Value Added

1999 40
73 companies
Ralston Purina 30 $23
Quaker Oats
Hilton Hotels
Coca-Cola 20
Unilever
etc.
10
0
Low High
Customer Satisfaction Index Score
Source: American Customer Satisfaction Index, U Michigan, HBR, 2001

Operational Excellence Training


 D efine
M easure

What about Lean, TOC, TQM A


I
nalyze
mprove
C ontrol

l Six Sigma
 Remove defects, minimize variance
l Lean
 Remove waste, shorten the flow
l TOC
 Remove and manage constraints
l TQM
 Continuous Improvement

Operational Excellence Training


 D efine
M easure

Value Stream Map - Current State A


I
nalyze
mprove
C ontrol

6 WEEK Production 90/60/30 day


Forecast Control Forecasts Customer

y
Suppliers ekl
We ax MRP Order
Entry
F Demand = 45 per day
Orders/d 2 shifts
ay
Lead Time - 34 = 36 Takt Time
Days Queue = 18.2 Minutes
WEEKLY SCHEDULE = 1.5
Days Competitive Lead Time
= 3 Days

1X
Daily

I
Coils Stamping S. Weld # 1 Assembly Test Shipping
5 days I I
342 I I I
81 122 90
202
CT=1sec CT=3 min CT= 15 min CT= 67 min CT= 4 min Lead Time
Co=1 hr. Co=10 min. Co=0 min. Co= 23 min Co=0 =23.6 days
Uptime=85% Uptime=70% Uptime=100% FTY = 67% Uptime=100%
2 shifts 2 shifts Touch Time
1 shift 1 shift 2 shifts
= 89 min

5 days 7.6 days 1.8 days 2.7 days 4.5 days 2 days
1 sec 3 min 15 min 67 min 4 min
Demand = 45/day
Customer Data  D
M
efine
easure

On-Time Delivery
A nalyze
I mprove
C ontrol
Takt Time = 18.2 min
6 WEEK Production 90/60/30 day
Forecast Control Forecasts Customer
Competitive LT = 3 days
y
Suppliers ekl
We ax MRP Order
Entry
F Demand = 45 per day
Orders/d 2 shifts
ay
Lead Time - 34 = 36 Takt Time
Days Queue = 18.2 Minutes
WEEKLY SCHEDULE = 1.5
Days Competitive Lead Time
= 3 Days

1X
Daily

I
Coils Stamping S. Weld # 1 Assembly Test Shipping
5 days I I
342 I I I
81 122 90
202
CT=1sec CT=3 min CT= 15 min CT= 67 min CT= 4 min Lead Time
Co=1 hr. Co=10 min. Co=0 min. Co= 23 min Co=0 =23.6 days
Uptime=85% Uptime=70% Uptime=100% FTY = 67% Uptime=100%
2 shifts 2 shifts Touch Time
1 shift 1 shift 2 shifts
= 89 min

5 days 7.6 days 1.8 days 2.7 days 4.5 days 2 days
1 sec 3 min 15 min 67 min 4 min
 D efine

Raw = 5 days Inventory M


A
I
easure
nalyze
mprove
C ontrol
WIP = 12.1 days
6 WEEK Production 90/60/30 day
Forecasts Customer
FG = 6.5 days Forecast Control

y
Suppliers ekl
We ax MRP Order
Entry
F Demand = 45 per day
Orders/d 2 shifts
ay
Lead Time - 34 = 36 Takt Time
Days Queue = 18.2 Minutes
WEEKLY SCHEDULE = 1.5
Days Competitive Lead Time
= 3 Days

1X
Daily

I
Coils Stamping S. Weld # 1 Assembly Test Shipping
5 days I I
342 I I I
81 122 90
202
CT=1sec CT=3 min CT= 15 min CT= 67 min CT= 4 min Lead Time
Co=1 hr. Co=10 min. Co=0 min. Co= 23 min Co=0 =23.6 days
Uptime=85% Uptime=70% Uptime=100% FTY = 67% Uptime=100%
2 shifts 2 shifts Touch Time
1 shift 1 shift 2 shifts
= 89 min

5 days 7.6 days 1.8 days 2.7 days 4.5 days 2 days
1 sec 3 min 15 min 67 min 4 min
Lead Time = 23.6 days
Flow of Value  D
M
efine
easure

Lead Time
A nalyze
I mprove
C ontrol
Touch Time = 89 min
6 WEEK Production 90/60/30 day
Forecast Control Forecasts Customer

y
Suppliers ekl
We ax MRP Order
Entry
F Demand = 45 per day
Orders/d 2 shifts
ay
Lead Time - 34 = 36 Takt Time
Days Queue = 18.2 Minutes
WEEKLY SCHEDULE = 1.5
Days Competitive Lead Time
= 3 Days

1X
Daily

I
Coils Stamping S. Weld # 1 Assembly Test Shipping
5 days I I
342 I I I
81 122 90
202
CT=1sec CT=3 min CT= 15 min CT= 67 min CT= 4 min Lead Time
Co=1 hr. Co=10 min. Co=0 min. Co= 23 min Co=0 =23.6 days
Uptime=85% Uptime=70% Uptime=100% FTY = 67% Uptime=100%
2 shifts 2 shifts Touch Time
1 shift 1 shift 2 shifts
= 89 min

5 days 7.6 days 1.8 days 2.7 days 4.5 days 2 days
1 sec 3 min 15 min 67 min 4 min
Max Wip = 7.6 days
Constraints  D
M
efine
easure

OTD, Lead Time


A nalyze
I mprove
C ontrol
CT (67) > Takt Time (18)
6 WEEK Production 90/60/30 day
Forecast Control Forecasts Customer

y
Suppliers ekl
We ax MRP Order
Entry
F Demand = 45 per day
Orders/d 2 shifts
ay
Lead Time - 34 = 36 Takt Time
Days Queue = 18.2 Minutes
WEEKLY SCHEDULE = 1.5
Days Competitive Lead Time
= 3 Days

1X
Daily

I
Coils Stamping S. Weld # 1 Assembly Test Shipping
5 days I I
342 I I I
81 122 90
202
CT=1sec CT=3 min CT= 15 min CT= 67 min CT= 4 min Lead Time
Co=1 hr. Co=10 min. Co=0 min. Co= 23 min Co=0 =23.6 days
Uptime=85% Uptime=70% Uptime=100% FTY = 67% Uptime=100%
2 shifts 2 shifts Touch Time
1 shift 1 shift 2 shifts
= 89 min

5 days 7.6 days 1.8 days 2.7 days 4.5 days 2 days
1 sec 3 min 15 min 67 min 4 min
CO = 1 hour
Setup Times  D
M
efine
easure

OP Margin, Lead Time


A nalyze
I mprove
C ontrol
CO = 23 min
6 WEEK Production 90/60/30 day
Forecasts Customer
CO = Changeover
Forecast Control

y
Suppliers ekl
We ax MRP Order
Entry
F Demand = 45 per day
Orders/d 2 shifts
ay
Lead Time - 34 = 36 Takt Time
Days Queue = 18.2 Minutes
WEEKLY SCHEDULE = 1.5
Days Competitive Lead Time
= 3 Days

1X
Daily

I
Coils Stamping S. Weld # 1 Assembly Test Shipping
5 days I I
342 I I I
81 122 90
202
CT=1sec CT=3 min CT= 15 min CT= 67 min CT= 4 min Lead Time
Co=1 hr. Co=10 min. Co=0 min. Co= 23 min Co=0 =23.6 days
Uptime=85% Uptime=70% Uptime=100% FTY = 67% Uptime=100%
2 shifts 2 shifts Touch Time
1 shift 1 shift 2 shifts
= 89 min

5 days 7.6 days 1.8 days 2.7 days 4.5 days 2 days
1 sec 3 min 15 min 67 min 4 min
Uptime = 70%
Maintenance  D
M
efine
easure

OTD, Lead Time


A nalyze
I mprove
C ontrol

6 WEEK Production 90/60/30 day


Forecast Control Forecasts Customer

y
Suppliers ekl
We ax MRP Order
Entry
F Demand = 45 per day
Orders/d 2 shifts
ay
Lead Time - 34 = 36 Takt Time
Days Queue = 18.2 Minutes
WEEKLY SCHEDULE = 1.5
Days Competitive Lead Time
= 3 Days

1X
Daily

I
Coils Stamping S. Weld # 1 Assembly Test Shipping
5 days I I
342 I I I
81 122 90
202
CT=1sec CT=3 min CT= 15 min CT= 67 min CT= 4 min Lead Time
Co=1 hr. Co=10 min. Co=0 min. Co= 23 min Co=0 =23.6 days
Uptime=85% Uptime=70% Uptime=100% FTY = 67% Uptime=100%
2 shifts 2 shifts Touch Time
1 shift 1 shift 2 shifts
= 89 min

5 days 7.6 days 1.8 days 2.7 days 4.5 days 2 days
1 sec 3 min 15 min 67 min 4 min
 D efine

FTY = 67% Quality M


A
I
easure
nalyze
mprove
C ontrol

6 WEEK Production 90/60/30 day


Forecast Control Forecasts Customer

y
Suppliers ekl
We ax MRP Order
Entry
F Demand = 45 per day
Orders/d 2 shifts
ay
Lead Time - 34 = 36 Takt Time
Days Queue = 18.2 Minutes
WEEKLY SCHEDULE = 1.5
Days Competitive Lead Time
= 3 Days

1X
Daily

I
Coils Stamping S. Weld # 1 Assembly Test Shipping
5 days I I
342 I I I
81 122 90
202
CT=1sec CT=3 min CT= 15 min CT= 67 min CT= 4 min Lead Time
Co=1 hr. Co=10 min. Co=0 min. Co= 23 min Co=0 =23.6 days
Uptime=85% Uptime=70% Uptime=100% FTY = 67% Uptime=100%
2 shifts 2 shifts Touch Time
1 shift 1 shift 2 shifts
= 89 min

5 days 7.6 days 1.8 days 2.7 days 4.5 days 2 days
1 sec 3 min 15 min 67 min 4 min
Flow of Value  D
M
efine
easure
Who is setting the pace?
OTD, Lead Time
A nalyze
I mprove
C ontrol
What is the pitch time?
6 WEEK Production 90/60/30 day
Forecast Control Forecasts Customer

y
Suppliers ekl
We ax MRP Order
Entry
F Demand = 45 per day
Orders/d 2 shifts
ay
Lead Time - 34 = 36 Takt Time
Days Queue = 18.2 Minutes
WEEKLY SCHEDULE = 1.5
Days Competitive Lead Time
= 3 Days

1X
Daily

I
Coils Stamping S. Weld # 1 Assembly Test Shipping
5 days I I
342 I I I
81 122 90
202
CT=1sec CT=3 min CT= 15 min CT= 67 min CT= 4 min Lead Time
Co=1 hr. Co=10 min. Co=0 min. Co= 23 min Co=0 =23.6 days
Uptime=85% Uptime=70% Uptime=100% FTY = 67% Uptime=100%
2 shifts 2 shifts Touch Time
1 shift 1 shift 2 shifts
= 89 min

5 days 7.6 days 1.8 days 2.7 days 4.5 days 2 days
1 sec 3 min 15 min 67 min 4 min
 D efine
M easure

Making it happen A
I
nalyze
mprove
C ontrol

Three major roles


l Implementer
 Learns the tools
 Works the process
 Solves day to day problems
l Manager Where do you
 Learns the methodology need to focus?
 Manages a value stream
 Reviews project teams
l Leader
 Establishes the vision for the future
 Sets priorities
 Encourages

Operational Excellence Training


 D efine
M easure

What Is a Sigma? A
I
nalyze
mprove
C ontrol

l A metric that indicates how well a process is performing.


 Higher is better
 Measures the capability of the process to perform defect-
free work
 Also known as “z”, it is based on standard deviation for
continuous data
 For discrete data it is calculated from DPMO

Operational Excellence Training


 D efine
M easure
A nalyze
I
The Normal Curve and Capability
mprove
C ontrol

Units of Measure
Performance
Limit
Area of Yield Probability
of a Defect µ Units of Measure
µ

Units of Measure

Excellent
Poor Process Process
Capability Capability
VeryHigh VeryHigh VeryLow VeryLow
Probability Probability Probability Probability
of Defects of Defects of Defects of Defects

LSL USL LSL USL

Low
LowSigma
Sigma High
HighSigma
Sigma

Operational Excellence Training

Vous aimerez peut-être aussi