Clay:
Clay/h=2659*7/(6*8)=388 ton/h
Sand:
Assuming that kiln decalcination about 15% and our L.O.I = 35%
Total volatized CO in kiln = (0.35/1.977) x 0.15 x 187,500=
4,980 Nm3 CO2/hr ----3
Assuming that firing in kiln 40% --- Preheater 60%
Kiln smoke gases=0.4 x 171,344 = 68,535 Nm3 / hr ------4
Total kiln gases = (2)+(3)+(4)
=77,800 Nm/hr
Depending on CL content we have 20% By pass + safety factor
15%
By pass=0.35 x 77800.347 = 27,230 Nm3 / hr
Total kiln gas without by pass = total kiln gases by pass gases
= 77800.347-27230.12= 50,570 Nm/hr -------5
we
3 cement silos
Capacity : 15 000 t x 3
Having bulk discharge
Discharge rate 260 ton/hr
Cement production / day = 5 720 ton
Use 3 machines
Type : ventomatic
Capacity : 120 t/h for each one
Running hour : 24 hr
Total packing = 8,640 t / day