Clinker factor= 1-(L.O.

I +by pass+ Dust of


filter)
=1-(0.35+0.02+0.01) = 0.62
Assume that : Clinker factor=0.58
As safety factor
That mean each 1KG raw meal gives 0.58 KG
clinker
X KG raw meal gives 1KG clinker
X=1/0.58 =1.72
That means 1.72 KG raw meal gives 1KG clinker

2 (L.S & Clay)Crushers will operate 6 d/w and 8 h/d


Raw material required for crushers:
Lime stone :

Avg. Moisture =1.4166%

L.S/d=4500*1.72*1.1*0.7271*1.014166= 6278 ton/day

L.S/h =6278*7/(6*8)=916 ton/h

Clay:

Avg. Moisture =17.34%

Clay/d=4500*1.72*1.1*0.2662*1.1734 = 2659 ton/day

Clay/h=2659*7/(6*8)=388 ton/h

Sand:

Sand/d=9000*0.67/100 = 60.3 ton/day

So Sand needs per day = 65 ton/day to be in safe side

Impact crusher 1050 t/h


Working days = 6 days/week
Working shifts= (one shift)=8 hours/day

Daily production = 1050 *8 =8400 t


Weekly production = 8400*6 = 50400 t
Roller crusher 400 t/h
Daily production=400*8 = 3200 t
Weekly production = 3200*6 = 19200 t

5 Trucks with cap. 60 ton (3 for L.S & 2


for Clay)
2 Loaders
2 Bulldozer
Material handling from crushers to plant by
belt conveyors as per flow sheet

Stock pile covers 4 days raw mill feeding (9,000t/d)


Selected longitudinal pile with max. capacity=3,5000 t
Reasons:
1- Different quality of quarry layers
2- Easy for extension
Stacker:
Slewing stacker 1900 t/h ( Operat. cap. 1450t/h)
Reclaimer:
Bridge scraper 500t/h
Raw Material open yard for Sand capacity 5,000 t

Raw Meal factor = 1.72


Moisture content of Mix = 5.65 %
Raw meal required =4,500*1.72*1.0565 = 8,177 ton/day
Safety factor (take over)= 1.1
We will operate the mill 22 h/d
Raw mill capacity =(8,177*1.1)/22= 409 ton/hour
Total raw meal = 9,000 t/d
Max. capacity of Raw mill = 409 t/h
Mill type: Atox roller mill 40 (3 rollers)
Capacity : Design cap. = 427 t/h working 355 day/year
Mill Drive : 2152 KW
Air Separator :RAR 45
Separator drive : 163 KW
Hot gas generator: gas firing system

Air flow =120 Nm3/s (assumption)


Mill fan flow rate Q =120 x 60 x 60
= 432,000 Nm3/h
Mill fan power = 2,300 KW
Raw transportation by collecting air slide
then then to CF silo by using bucket
elevator to reduce power consumption .
There is a sampler before bucket
elevator for controlling quality

One Raw meal silo CF silo with bucket elevator


Capacity: 25,000 ton
=3.14*r*silo length*material density
Height: 52 m
Active height:48m
Internal diameter: 20 m
Bulk density of raw material=1.42 ton/m
Kiln feed tank capacity:100 ton
Bucket elevator capacity=(9000/24)*1.1=420
t/hr

Preheater : In Line Calciner 5 stage


Natural Gas for main burner & calciner

Kiln feed = 4500 x 1.72 / 24 = 323 t/h


Consider Gas lower calorific value = 9250 Kcal/Nm
Consider heat consumption = 800 kcal/kg clinker

The production =4,500 x 1000/24 = 187,500 kg ck/hr


Total heat consumption = 187500 x 800
= 150,000,000 kcal / hr
Gas Req. for Kiln (Nm3/hr) = 150,000,000 / 9250
= 16,216 Nm/hr
Gas Req. for Main Burner = 16,216 x 0.4 = 6,487 Nm/hr
Gas Req. for preCalciner = 16,216 x 0.6 = 9,730 Nm/hr

The air required for combustion:

Lo = [ (Hu-1115) / 808 ] = [ ( 9250-1115 ) / 808 ]


= 10.07 Nm3 air/Nm3 gas
Assuming that excess air 8%
Total excess air= 10.07 x 1.08 = 10.87 Nm3air / Nm Gas
Req. air hourly= 10.87 x16,216 =176,327 NmAir/hr
Smoke gas (Vo) = (1.25 *9250 3025) / 808 = 10.56
Nm3/Nm3 gas
Total smoke gas = 10.56 x16,216 = 171,344 Nm/hr ----1
Assuming that false air 0.5 % O
false air = 0.5/(21-0.5) = 2.5 %
Total false air = (2.5/100 )x 171344 = 4283 Nm/hr---- 2

Assuming that kiln decalcination about 15% and our L.O.I = 35%
Total volatized CO in kiln = (0.35/1.977) x 0.15 x 187,500=
4,980 Nm3 CO2/hr ----3
Assuming that firing in kiln 40% --- Preheater 60%
Kiln smoke gases=0.4 x 171,344 = 68,535 Nm3 / hr ------4
Total kiln gases = (2)+(3)+(4)
=77,800 Nm/hr
Depending on CL content we have 20% By pass + safety factor
15%
By pass=0.35 x 77800.347 = 27,230 Nm3 / hr
Total kiln gas without by pass = total kiln gases by pass gases
= 77800.347-27230.12= 50,570 Nm/hr -------5

Total smoke gases in preheater (60%) =0.60 x 171,344


=102,806 Nm/hr --------6
Considering decalcination in preheater is about 85 % and our
L.O.I=35%

Volatized CO2 = (0.35/1.977) x 187500 x 0.85


=28215.1 Nm/hr ---------------7
Assuming O2 after ID fan is 5% so

Total false air in preheater =[(5-2)/ [(21-5) x(102,806+28,215) ]


=24,566 Nm/hr -------------8
Total gases after preheater = 5+ 6 + 7+8 =206158.29 Nm/hr

Taking 15% Safety factor = 206158.29*1.15=237082.03 Nm/hr


So ID fans capacities are 237082.03 Nm/hr

Kiln production/h =(4500 x 1000)/24=187500kg/h


Burner Fuel = 800 kcal x 0.4=320 Kcal/Kg clinker
Total thermal load = 187500 x 320= 6 x 107Kcal/h
Assume burning zone thermal load in case of in line calciner = 4.1 x
106Kcal/h/m
Active cross section = (6 x 107 )/ 4.1 x 106 =14.63m
Active cross section = 3.14 x (D-0.44)/4
So Kiln Diameter (D)=4.75m
Assume Volumetric load =4.2TPD/m
4.2=4500/[(D-0.44) x (3.14/4) x L]
So kiln length (L) = 74m
Speed rotation of Kiln : 4.0 rpm
Kiln Slope = 4 %
Filling Degree = ( 3.2 x prod. t/d ) / ( Diam x slope % x RPM )
= ( 3.2 x 4,500 ) / ( 4.75 x 4 x 4.0 ) = 8.2 %
Retention time = ( 23 x kiln L ) / ( Kiln D x RPM x slope% )
= ( 23 x 74 ) / ( 4.75 x 4 x 4 ) = 22.5 Min

we

will use Duoflex burner ( multi channel


) due to :
- Good controlling system
- low primary air consumption
- adjustable swirling
- good air nozzle area
- central fuel
injection
- suitable for
alternative fuels

ID fan gas temp. 290 C


Bag house filter before final fan
Reasons:
1- reduce power consumption
2- Pollution control
Dust emission ~ 25 mg/m3

Bypass fan for volatile gases from


kiln inlet
quenching air fan for cooling
condition tower
Bag House Filter

Assume specific load for cross section 46 TPD/m


Cross section area = TPD/sp. load=4500/46
=98 m
Module dimension(F.L sys) =1.3Width*4.2Length
=5.46 m
No. of modules =98/5.46=17.8 ~ 20 module
Kiln D.= 4.75 m then cooler width must be larger
So we need 4 module in width and 5 module in
length
Cooler Width=4*1.3=5.2m
Cooler length = 5*4.2=21m

Cooler has 7 cooling fans


Total prod./h =4500*1000/24=187500Kg/h
From F.Ls system cooling rate =1.8
Nm/Kg Ck
Cooling air req.=1.8*187500=337500
Nm/h
Cooler crusher : Hammer crusher
Pan conveyor cap. =4500*1.6/24=300 t/h

2 clinker silo each one 20000 tons


Each silo have 6 automatic discharge gate
sys. For feeding cement mills
1 off-standard silo 700 ton
Material handling from silos to cement mills
in flow sheet

Two tube mills closed circuits with max cap. 130


t/h
Separator:
- high eff. Sep. fls sepax
- one dyn. Sep. with 4 cyclones
Filling degree 30 %
Speed 74 % from critical speed
Length / diam. = 3.5
Bulk weight balls charge = 4.5 t/m
Using bucket elevator for cement trans to silos

Ass. Blaine 3500 cm/gm from fig 22


Sp. Power consumption = 43 Kw.h/t
The power req. for 130 t = 43 * 130 =
5600 Kw
Ass. Gear box eff. = 95 %
The mill motor power = 5600/ 0.95 = 5895
Kw From fig. 10
- Di = 4.54 m
- Dn = Di + Lining thickness = 4.54 +
0.26 = 4.8 m

Total Mill length = 3.5 * 4.54 =15.9 m


Compartment length
- Com. 1 = 0.35 * 15.9 = 5.565 m
- Com. 2 = 0.65 * 15.9 = 10.335 m
Balls charge
- Com. 1 = 121.618 t
- Com. 2 = 225.852 t

3 cement silos
Capacity : 15 000 t x 3
Having bulk discharge
Discharge rate 260 ton/hr
Cement production / day = 5 720 ton

Use 3 machines
Type : ventomatic
Capacity : 120 t/h for each one
Running hour : 24 hr
Total packing = 8,640 t / day