Académique Documents
Professionnel Documents
Culture Documents
Executive Summary
Problem Statement
Highly effective and efficient 3rd Party labor
collection system not compatible with Oracle
Capturing Operational Level Actual Hours against
a Work Order is not Possible.
Results
-Support cost reduction
-Conversion productivity loss avoidance
-Productivity loss avoidance
-P&E upgrade/conversion avoidance
Opportunity Statement
-Eliminate Annual 3rd party support cost
-Avoid P&E expenditure for 3rd party solution
-Retain current real-time labor collection capability
that collects direct labor with the transactions of
standard systems and serves as a basis for
managing productivity
CTQs
-No increase in collection cost
-Maximize Oracle standard functionality
Solution
Leverage Oracle Mobile Supply Chain Application
(MSCA) Resource and Move Transaction
day/timestamps as the basis for labor calculations.
Develop the custom logic necessary to calculate
applied time based off of end times. Other than start
of day, start times will not be necessary.
2012 Copyright Genpact. All Rights Reserved.
Key Features
1.
2.
3.
2
GE Title or job number
11/18/2014
Benefits
1.
2.
3.
4.
Gain a single, integrated view of labor, equipment, and WIP for all
activities, from setup to final quality inspection
5.
6.
Supervisory
-Simple, intuitive supervisory interface
-Supervisory approval of time by employee by day
-Error detection and correction capability up to
work order complete status
-Transactional freeze at work order close status
Process Flow
IWB
Work-Order-Num
Employee
1/6/2014 0:00 Creation Date End
Report
Report-Start-Date
Transaction Code
80002 RES_TRAN
3214764 MOVE_TRAN
3225896 MOVE_TRAN
3214764 MOVE_TRAN
1/7/2014 0:00
Detail
1/6/2014 0:00 Report-End-Date
Operation-Seq-Num
Description
9001 ATTENDANCE ON
20 3810 ASSY
20 3810 Final Assembly
20 3810 ASSY
1/8/2014 11:16
Transaction-Date
Start-Time
End-Time
1/6/2014 7:54
1/6/2014 8:51
1/6/2014 8:57
1/6/2014 9:17
4:30:02 PM
7:54:34 AM
8:51:33 AM
8:57:09 AM
7:54:34 AM
8:51:33 AM
8:57:09 AM
9:17:26 AM
3352486 MOVE_TRAN
1/6/2014 9:30
1/6/2014 9:30
9:17:26 AM
3358091 MOVE_TRAN
3214764 MOVE_TRAN
3225896 MOVE_TRAN
3225743 RES_TRAN
80002 RES_TRAN
3225743 MOVE_TRAN
3225743 MOVE_TRAN
3225743 MOVE_TRAN
3221833 MOVE_TRAN
1/6/2014 9:31
1/6/2014 9:43
1/6/2014 9:47
1/6/2014 10:00
1/6/2014 10:21
1/6/2014 11:15
1/6/2014 11:37
1/6/2014 11:56
1/6/2014 12:17
1/6/2014 9:30
1/6/2014 9:43
1/6/2014 9:47
1/6/2014 10:00
1/6/2014 10:21
1/6/2014 11:15
1/6/2014 11:37
1/6/2014 11:56
1/6/2014 12:17
9:30:31 AM
9:30:51 AM
9:43:38 AM
9:47:52 AM
10:00:19 AM
10:21:46 AM
11:15:02 AM
11:37:23 AM
11:56:26 AM
Export
Capable
Time-Difference
063: 24: 32
000: 56: 59
000: 05: 36
000: 20: 16
1/6/2014 7:54
1/6/2014 8:51
1/6/2014 8:57
1/6/2014 9:17
9:30:51 AM
9:43:38 AM
9:47:52 AM
10:00:19 AM
10:21:46 AM
11:15:02 AM
11:37:23 AM
11:56:26 AM
12:17:16 PM
000: 00: 19
000: 12: 47
000: 04: 14
000: 12: 27
000: 21: 26
000: 53: 15
000: 22: 20
000: 19: 03
000: 20: 50
Drill Through To
Individual Transactions
HH:MM:SS-to-Decimal
63.40888889
0.94972222
0.09333333
0.33805556
0.21805556
0.00555556
0.21305556
0.07055556
0.2075
0.3575
0.88777778
0.3725
0.3175
0.34722222
Operations &
Routings
Departments
Capture
Actual
Hours
MSCA
Resources
WIP
Resource
Transactions
References
1. GE TRANSPORTATION ICS US
2. GE TRANSPORTATION FAIRCHILD