DRYER
E.B.
DRYER
= specific heat of
solid
= specific heat of gas
E.B.
Or
2500
=4.187 KJ/KG0K
for water @
Standard
temperature
and
0
=
1.88
KJ/KG
K
press.
for water vapor @
Standard
temperature
and
press.
= 2500 KJ/KG
Heat
of
vaporization
or
latent heat @ T0
M.B.
1 ZONE-I
ZONE-II
E.B.
ZONE-III 4
ZONE-I
ZONE-II
ZONE-III
If
(m is the log mean temperature difference,
The heating time of these zone (III) will be,
EB
ZONE-I
ZONE-II
ZONE-III
Putting
ZONE-I
ZONE-II
ZONE-III
Where, =
ZONE-I
ZONE-II
ZONE-III
If X*= 0
Drying time will have
M.B.
E.B.
(N
tG
DRYER
Where,
and are called the wet bulb depression at the two ends of zone-II
M.B.
DRYER
E.B.
= + 1.97
1 ZONE-I
2 ZONE-II
ZONE-III 4
M.B.
1 ZONE-I
2 ZONE-II
ZONE-III 4
E.B.
Zone-I: removal of moisture above Xc
Zone-II: removal of moisture below Xc
Zone-III: heating of the solid to its exit temperature of 60 0C
The solid remains at the adiabatic saturation temperature of
the drying gas in Zone-I & Zone-II
Given
data:
Wet solid entering : 1000 kg/hr
Dry solid entering (LS) : 1000(1-0.25)=750kg/hr
X1=25/75=0.333
X4=X3=1/99=0.0101
XC=0.08/0.92=0.087
By an Overall moisture balance
X*=0
GS=12000kg/hr (DRY BASIS)
TG4=1000C
Y4=Y3=0.025
12000(Y1-0.025)= 750(0.333-0.0101)
TS4=600C
Y1=0.0452
CPS=0.96kJ/(kg dry solid) . K
CH=1.005+1.88(0.025)
=1.052 kJ/(kg dry air .K)
Given
data:
=0.96+0.333*4.187*(40-0)
=94.2 kJ/(kg dry solid .K)
=0.96+0.0101*4.187*(60-0)
=60.14 kJ/(kg dry solid .K)
e gas temperature TG3 can be calculated by the heat balance over zone III
GSCH(TG4-TG3)=LS(HS4-HS3)
12000(100-TG3)=750(0.96(60-40)
TG3=990C
nce, the heat load of this zone III is small the gas temperature does not change
uch
eat transfer calculation in zone-III
Rate of heat transfer from the gas
= GSCH(TG4-TG3)
=12000*1.052*(100-99)
=12620 kJ/hr
= 59
100-60=400C
99-40=590C
=(59-40)/(ln(59/40))
=490C
12620/(750*0.065)(158)(49)
0.0334 hr
HG4=[1.005+1.88*0.025](100-0)+2500*0.025
=167.7 kJ/kg
12000*(167.7-HG1)=750(60.14-94.2)
HG1= 169.8 kJ/(kg dry air)
2500
169.8=[1.005+1.88*0.0452](-0)+2500*0.0452
12620/(750*0.065)(158)(49)
0.0334 hr
12620/(750*0.065)(158)(49)
0.0334 hr
12620/(750*0.065)(158)(49)
0.0334 hr
moisture to 0.3% final moisture (wet basis) in a rotary dryer at a rate 1500,
kg/hr. hot air enters 1350C with a humidity of 0.015. the exit solid temperature
must not exceed 1100C and the air velocity must not exceed 1.5 m/s in order to
avoid dusting at the solid.
Solution
TS1=260C
TG2=1350C
Y2=0.015
we assume that the exit temperature of gas is , T G1=600C and that of solid is
TS2=1000C
CONTINUE
TEMPERATURE
TG2
TGB
TS2
TGA GAS
TG1
TSA
TSB
SOLID
TS1
1
Zone-III
only heating of the solid occurs in this zone,
there is little water left for vaporization . At the boundary
between zones III and II. The solid is TSB , the wet bulb
temperature of the air at that location.
Assume TSB=TSA=410C
Enthalpy of the solid at the inlet to zone-III
HSB=[1.005+0.00301*4.187](41-0)
=35.37kJ/kg dry
solid
HUMID HEAT OF THE GAS ENTERING ZONE-III
CHB=[1.005+1.88*0.015]
=1.033kJ/kg.K
HEAT BALANCE OVER ZONE-III
LS(HS2-HSB)=GSCHB(TG2-TGB)
1200(86.2-35.77)=10560*1.033(135-TGB)
TGB=1290C
Adiabatic saturation temperature of air entering zone-II (129 0C and
humidity of 0.015) is 41.30C. This is fairly close to the guess value of
410C and TSA=TSB=410C is not changed.
At the boundary B,
TB=129-41 =880C
AT THE END 2, T2=135-100 =350C
LOG MEAN TEMPERATURE IN ZONE-III , Tm=(88-35)/ln(88/35) =57.50C
NUMBER OF HEAT TRANSFER UNIT (NtG)III = (T2-TGB)/ Tm
= (135-129)/(57.5)=0.104
ZONE-II : in order to calculate (NtG)II, it is required to calculate value of TGA. this
can be obtained by heat balance eqn.
HGB=[1.005+1.88YB](129-0)+2500YB
=170.8kJ/kg SINCE YB=0.015
HSA=[CPS+CPL*X1](TSA-0)
=[0.85+4.187(0.125)](41)
=77.77kJ/kg dry solid
ENTHAPLY BALANCE
LS (HSB-HSA)=GS(HGB-HGA)
1200(35.37-77.77)=10560(170.8-HGA)
HGA=175.6=[1.005+0.O4306*1.88](TGA-0)+(0.04306*2500)
TGA=630C
AT SECTION A, TA=63-41 =220C
Tm=(88-22)/ln(88/22)
=47.60C
Number of transfer units (NtG)II =(TGB-TGA)/ Tm
=(129-63)/47.6=1.386
before calculating (NtG)I, check the value of assumed value of the exit
temperature TG=600C by making the energy balance over zone-I
10560(175.6-HG1)=1200(77.77-49.31)
HG1 AND HENCE TG1=59.60C
ZONE-I
T1=60-26=340C
Tm=(34-22)/ln(34/22)=27.50C
Number of transfer units (NtG)I =(TGA-TG1)/ Tm
=(63-60)/27.5=0.109
TOTAL NUMBER OF TRANSFER UNITS
(NtG) =(NtG)I +(NtG)II+ (NtG)III
=0.109+1.386+0.104 =1.53
THE GAS MASS FLOW RATE
=[(10560)*(1.015)+10560(1.04306)]/2
=10867 kg/hr
Assuming ,
The basis reference temperature is 1000C or 2120F
The material leave the dryer at 2900F and air will be exhaust at 1400C
The heat requirement are approximate as follows
Total heat to evaporate moisture =
500(1.5-0101)[(212-60)+970+0.45(140-212)]
=811752Btu/hr
Heat to rise material sample
CPW*LS(TS2-TS1)
=0.3*500(290-60)
=34500 Btu/hr
Total energy =811752+34500= 846245 Btu/hr
The entering humidity will be 0.03lb/lb dry air to permit the recirculation
This corresponding to 1% relative humidity at 300 0F
The quantity of air required is = [Total energy / (CH(TG2-TG1))]
If CH=0.254 at 3000F
= [846245/ (0.254(300-140))]
=20823 lb/hr
= 500(1.5-0.01)
=745 lb/hr
The humidity of air leave the dryer
=0.03+745/20823
=0.0656
Which corresponding to 48% relative humidity at 140 0F. The wet bulb
temperature corresponding to these condition is 116 0F.
The lb/hr required to recirculate to give the desired entering humidity are
=20823(0.03-0.01)/(0.0656-0.01)
=7490 lb/hr
The heat required for the constant rate section is approximate 70% of total
heat
=846245*0.7
=592371.5
The air temperature at the point where surface drying of solid will be
=140+(300-140)[592371.5/846245]
=252
The number of transfer unit in constant rate section (NTU) C
(NTU)C =ln [(ts-Tw)/(tc-Tw)]
=ln [(252-116)/(140-116)] =1.735
Tm =(136-10)/ln(136/10)
=48.27
(Nt)f =(TG2-TS)/ Tm
=(300-252)/(48.27)
=0.994
Total Nt =1.735+0.994
=2.729
The cross sectional area needed for air flow is = The total air requirement
/allowable vapor velocity
=20823/200
= 10.42 sqr. ft
Assume :
Trays =28 ; area = 9ft^2 ; 1 deep; free surface between trays (b)=1.5
Trucks height = 6ft
LT =19.5*b*G^0.2 where , b= space
LT=19.5*(0.125)*(2000)^0.2
=11.15 ft
Total tunnel length (Z1)= (Nt*LT)=2.73*11.15
=30.44