Vous êtes sur la page 1sur 40

WCDMA RNO Single Site Verification

1.0

Huawei Confidential. All Rights Reserved

Course Contents

Chapter 1 Single site verification overview


Chapter 2 Single site verification preparation
Chapter 3 Single site verification
Chapter 4 Problem example for site verification

Internal Use

Single Site Verification Overview

Internal Use

Single Site Verification Overview

Purpose: The single site verification test is a part of the WCDMA


network optimization to ensure that the basic functions of the cell
are normal, such as call access, call quality, handover and so on.

Internal Use

Single Site Verification Overview

Content: Through the single site function verification, the following


functions for each cell shall be checked as normal :
Verify coverage ( CPICH RSCP & Ec/Io )
Verify scrambling code
Verify no installation faults (e.g. crossed feeders)
Make service call test

Internal Use

Single Site Verification Overview

Tools:
Drive test scanner, used for collecting the pilot signal data. For
ex: DTI Scanner, Agilent E6455C;
Test UE, used for service verification and system message
collection. Qualcomm 6250 & U626;
Data collection software, used to display and log the signal
strength, UE status, signal message and so on in time. Genex
Probe, Agilent E6474A software;
Data analysis software, used to resolve message, analysis
signal, solve problem and so on. Genex Assistant,Actix Analyzer
software.

Internal Use

Course Contents

Chapter 1 Single site verification overview


Chapter 2 Single site verification preparation
Chapter 3 Single site verification
Chapter 4 Problem example for site verification

Internal Use

Single Site Verification Preparation

Before the single site verification, we should only ensure the


following conditions have been met.
Alarms Check
Cell Status Check
Parameters Check

Internal Use

Single Site Verification Preparation

Alarms Check
The product support engineer will be responsible for checking
and resolving all the alarms. It is important for the optimization
engineer prior to any field test to check with product support
engineer regarding any alarms especially intermittent alarms.

Internal Use

Single Site Verification Preparation

Cell Status Check


The product support engineer will be responsible for checking
and resolving all the cell state problems. It is important for the
network optimization engineer prior to any field test to confirm
with product support engineer regarding cell state.

Internal Use

Single Site Verification Preparation

Parameters Check
The optimization engineer need to ensure the radio part
parameters configuration list has been achieved. In the list the
radio part parameters includes: the scrambling code, power
setting, neighbor cell list, handover parameter etc.

Internal Use

Course Contents

Chapter 1 Single site verification overview


Chapter 2 Single site verification preparation
Chapter 3 Single site verification
Chapter 4 Problem example for site verification

Internal Use

Single Site Verification

Site Verification Items:


Installations: CPICH RSCP, CPICH Ec/Io, Rx Antenna Swap
Test
Settings: Frequency & SC, Cell reselection parameters,
LAC/RAC, Neighbor List.
Functions: LA/RA update, 3G<->2G Cell reselection, SMS (MT
& MO), Voice (MT & MO), VP (MT & MO), PS Attach & Detach,
PS service, Voice/VP/PS soft handover, Voice 3G->2G
handover.

S ite Checklis t.xls


Internal Use

Single Site Verification

Test Process step 1


Items: LA update / RA update / PS Attach
Purpose: Verify the LA update and RA update functions are
normal, the PA attach function is normal.
Method: Power on the Qualcomm mobile, if the WCP indication
is shown on the mobile screen, it means the LA update
procedure is OK, the RA update procedure is OK, the PS attach
is OK.
Notes: If the WC is shown on the mobile, it means the LA
update is OK. If the P is shown on the mobile, it means the RA
update and the PS attach is OK.

Internal Use

Single Site Verification

Test Process step 2


Items: PS Detach
Purpose: Verify the PA detach function is normal
Method: Choose Menu -> 5 -> 9 -> 2 on Qualcomm mobile, if
the WCP indication is changed to WC indication on the mobile
screen, PS detach is OK.
Notes: N/A

Internal Use

Single Site Verification

Test Process step 3


Items: Frequency and Scrambling Code
Purpose: Check the frequency and scrambling code for the
verified cell is right or not. If its wrong, maybe the parameter
setting or the Tx antenna installation have some mistake.
Method: Setup the Agilent E6474A software, observe cell
frequency and scrambling code from UMTS CPICH View
window. Check the frequency and scrambling code for the
verified cell is as same as planning.
Notes: N/A

Internal Use

Single Site Verification

Internal Use

Single Site Verification

Test Process step 4

Items: CPICH RSCP and CPICH Ec/Io


Purpose: Check the CPICH RSCP and CPICH Ec/Io for
the verified cell is normal or not. If its abnormal, maybe
the Tx antenna installation or the downlink interference
have some problems.
Method: In the Agilent E6474A software, observe CPICH
RSCP and CPICH Ec/Io from UMTS Status View window.
Check if CPICH RSCP is higher than -85dBm and CPICH
Ec/Io is higher than -8dB.

Internal Use

Single Site Verification

Notes:

The mobile shall be near the site


The CPICH RSCP and Ec/Io can be seen
from scanner or Qualcomm mobile. Use the
Qualcomm mobile to check the CPICH
RSCP and CPICH Ec/Io.
When we use the Qualcomm mobile to
check the CPICH RSCP and CPICH Ec/Io,
the Io and Ec/Io shall be obtained, the
CPICH RSCP shall be obtained through
calculation: RSCP = Ec/Io + RSSI

Internal Use

Single Site Verification

Internal Use

Single Site Verification

Test Process step 5


Items: Voice Call (MT & MO)
Purpose: Verify the voice call function is normal and the voice
call quality is good
Method: Make the dialing test of 3G speech service between
two 3G mobiles, one for the terminating call and another one for
the originating call. Test the speech communication quality by
your feel.
Notes: Qualcomm or Motorola mobile

Internal Use

Single Site Verification

Test Process step 6


Items: VP Call (MT & MO)
Purpose: Verify the VP call function is normal and the VP call
quality is good
Method: Make the dialing test of 3G VP service between two 3G
mobiles, one for the terminating call and another one for the
originating call. Test the speech and photo communication
quality by your feel.
Notes: Motorola mobile

Internal Use

Single Site Verification

Test Process step 7


Items: PS service
Purpose: Verify the PS function is normal and the PS quality is
good.
Method: Make the dialing test of 3G PS service, which include
WWW browsing and file downloading. Test the PS connection
quality by your feel.
Notes: Qualcomm or Motorola mobile

Internal Use

Single Site Verification

Test Process step 8


Items: SMS (MT & MO)
Purpose: Verify the SMS function is normal
Method: Make the dialing test of 3G SMS service between two
3G mobiles, one for the terminating call and another one for the
originating call.
Notes: Motorola mobile

Internal Use

Single Site Verification

Test Process step 9


Items: Cell reselection parameters, LAC/RAC, Neighbor List
Purpose: Check the parameters setting for the verified cell.
Method: UE shall read the system information when UE is in idle
mode. Collect UE reserved message and check the parameters
with Actix Analyzer software after the drive test.
Notes:

Cell reselection parameters: SIB3


LAC/RAC: SIB1
Neighbor list: SIB 11

Internal Use

Single Site Verification

Test Process step 10


Items: 3G->2G voice handover, 3G->2G cell reselection, 2G>3G cell reselection
Purpose: Verify the 3G->2G handover and 3G<->2G cell
reselection functions are normal.
Method: Find a place where there is 2G signal without 3G
signal. One mobile is keeping a voice call and another one is in
idle mode. Move from 3G to 2G, the mobile with voice call shall
handover to 2G and the mobile in idle mode shall reselect to
2G. Move from 2G to 3G, the mobile in idle mode shall reselect
to 3G.
Notes: Use the Motorola mobile to do the test, the 3G or 2G
indication is shown on the mobile screen

Internal Use

Single Site Verification

Test Process step 11


Items: Antenna swapping test
Purpose: Verify the Rx feeder installation is right.
Method: Switch the transmitter from one feeder to another,
check the RSCP changed or not. If no change happened, it
means that the feeder is correct.
Notes: Check the RSCP from scanner

Internal Use

Single Site Verification

Internal Use

Single Site Verification

Test Process step 12


Items: Soft handover (Voice, VP, PS)
Purpose: Verify the soft handover function is normal
Method: Take a speech service or VP service or PS service call
and keep it. Verify the soft handover from one sector to another
sector. During the process, observe the CPICH scrambling code
changing from Agilent UMTS CPICH View, and observe the
active set update message from UMTS Protocol Messages
View.
Notes: N/A

Internal Use

Single Site Verification

Internal Use

Single Site Verification

Internal Use

Single Site Verification

Troubleshooting:
The problem recording list should be filled in and the product support
engineer should be encouraged to solve the problems.
Track the problems until they are solved.

Internal Use

Single Site Verification

Notice items 1: Test Point Choice


We shall choose the test point where the CPICH RSCP of target
sector is high enough and that of other sector is poor.
The test points should be chosen near the site and ideally with
line-of-sight to the site.
The test points should not be chosen under the site as the
signal of other sectors of same site is strong too.

Internal Use

Single Site Verification

Notice items 2: Test Route Choice


The driving test route should connect the test points of the sectors. It is
required that signals not be shadowed by buildings along the test route
to avoid turning the test into a coverage test.

Internal Use

Single Site Verification

Notice items 3: Antenna Swapping Test Purpose


If the receive antenna crossed, the uplink diversity receive gain is loss,
and the uplink interfere is doubled. It will affect the uplink capability.

Internal Use

Course Contents

Chapter 1 Single site verification overview


Chapter 2 Single site verification preparation
Chapter 3 Single site verification
Chapter 4 Problem example for site

verification

Internal Use

Problem Example for Site Verification

In the site verification, following problems have been found


Scrambling Code Setting is wrong: The scrambling code from
scanner and mobile is different from the planning
After feeder swapped, the CPICH RSCP is 20dB lower than
before.

Internal Use

Answers

Scrambling Code Setting is wrong


The Scrambling Code may be wrong in RNC, check the
datasheet in RNC.
If the Scrambling Code from scanner is the same as that of
another sector in same site planned, maybe the TX/RX feeder
is crossed to the another sector.

Internal Use

Answers

After feeder swapped, the CPICH RSCP is 20dB lower than before:
The RX feeder is crossed to the antenna of another sector. In
this case, the CPICH RSCP will be high in the coverage area of
the other antenna. Check the connection between the feeder
and the antenna.

Internal Use

Huawei Confidential. All Rights Reserved

Vous aimerez peut-être aussi