Académique Documents
Professionnel Documents
Culture Documents
Contents
General Information
Company Overview
Company Location
Vision & Philosophy
Business Area
Field of Service
Our Clients
Capabilities
Organization
Overseas Distribution
Manpower Resources
Research and Development
Quality Control & Assurance/HSE
Experience
Major Reference for Process Plant Projects
Company Overview
Year Established
Manpower Strength
Business Area
-
Process Plant
Power & Energy Plant
New Industrial Plant
Infrastructure & Environment
Globalization
Business Area
Field of Service
FULL RANGE OF SERVICE
Onshore Production & Gathering
Offshore (Fixed Facilities &
Floating Mobile Unit)
Oil & Gas Processing
Upstream
Feasibility Study
FEED
PMC Services
Conceptual
Engineering
Midstream
Refinery
Aromatics
LNG
Petrochemical
Chemicals
Fertilizer
Downstream
EPC
FEED
PMC
EP
EP,CM Procurement
Procurement Service
Construction
Construction Management
Commissioning & Start-up
Operation & Maintenance
Organizatio
n
Technology Innovation
& Development Office
Planning Office
Planning
Business Analysis
Public Relation (PR)
Industrial Environment Design
Creative Value for Clients
PROCESS PLANT
technology development
Quality management
Process Management
Analysis
Dae-young Ji
Dong-kyu Paik
INDUSTRIAL PLANT
Won-keuk Lee
Ok-chul Kim
Wee-chul Kim
Upstream Oil&Gas
LNG Facilities
Oil Refinery
Oil Terminal
Petrochemical
Fertilizer &Chemicals
Yoon-young Lee
Infra
Road
Structure
Urban Planning
Architecture
Nam-wook Park
Sang-wook kim
Environment
Water Supply & Sewerage
Water Power
Underground Water
Environment
Jong-ho Lee
Material Procurement
Transportation, L/C
Customs Inspection
Outsourcing Partner (Vendor)
Selection
Overseas Distribution
Iran :
South Pars Phase 4 & 5 (2,000 MMSCFD)
South Pars Phase 2 & 3 (2,000 MMSCFD)
Kuwait :
KNPC New Oil Pier Project
Petroleum Hydrotreatin Catalyst Plant
Romania :
Petrobrazi CPP
Greece :
Crude & Vacuum Distillation
Libya :
Attahaddy Gas Field Development (350 MMSCFD)
Ras Lanuf Petrochemical Complex Phase II
Misurata Thermal Power Plant
Qatar :
QGPC NGL-4 Plant
China :
Chishui Urea Plant
Pingdingshan Urea Plant
Shaanxi Urea Plant
Bangladesh :
Kailashtilla LPG Plant
Meghnaghat CCPP
Korea :
HDO Clean Fuels Project
Hyundai Oil Refinery Phase I & II
Hyundai Petrochemical Complex I & II
Incheon LNG Project
Yongduk Wind Power Plant
FGD Facility for Pyongtaek TPP
Taiwan : Fomosa Lube Base Oil
Vietnam : Pha Lai II Thermal Power Plant
Ba Ria add-on CCPP
Mexico:
FEED of Sempra Baja LNG
Terminal Project
Philippines :
Petron TCCU Revamp & Mixed Xylene
NPC-1159 230KV Substation
Malaysia :
GPP Stage II & III, IV (each 500 MMSCFD)
TAWAU DPP
UAE :
UAE Rebar Mill
Nigeria :
Bonny Terminal Integrated Project
Republic of Equatorial Guinea :
The Potable Water Supply Project,
Overseas Projects
(75%)
Pakistan:
Pirkoh Gas Compression
Project
Thailand :
NPK Fertilizer Complex
Saudi Arabia :
Makkah Taif TPP
Domestic Projects
(25%)
Yemen :
Ras Issa Refinery Project
Indonesia :
Suban I & II Gas Project
Sumpal Gas Project
Miwon CPP
India :
HPCL Hydrogen Generation Plant
GMR MADRAS DPP
Mangalore Barge Mounted CCPP
Colombia:
Colombia Diesel Unit(HDT)
Brazil :
Porto Velho 340 MW CCPP
Human Resources
As of March, 2009
179
126
130
Piping
155
Mechanical
215
Electrical
102
C&I
105
176
Construction Management
106
1,041
Nuclear
PERMANENT EMPLOYEES
107
115
1,552
714
MARKETING
& PROPOSAL
ADMINISTRATIVE
186
ENGINEER
32
148
Procurement
46
Technical Planning
11
R&D / IT
39
53
Commissioning
35
106
Administrative
107
------------------------------------TOTAL
1,765
Staff Experience
Staff Location
---------------------------------Head Office
1,461
Overseas
151
Domestic Site
123
30
----------------------------------Over 20
Years
(20%)
10~20
Years
(47%)
0 ~10
Years
(33%)
-----------------------------------
-----------------------------------
Total
1,765
Principal
Subject
Korea
Korea Research
Research
Institute
Institute of
of
Chemical
Chemical
Technology
Technology
MTO
MTO
Development
Development of
of manufacture
manufacture of
of light
light olefin
olefin from
from methanol
methanol and
and
DME
DME
Korea
Korea Electric
Electric
Power
Power Research
Research
Institute
Institute
nd Stage
CO
CO22 2
2nd
Stage
Scale
Scale up
up and
and Optimization
Optimization Study
Study on
on the
the CO
CO22 recovery Process
utilizing
utilizing high
high performance
performance absorbents
absorbents of
of CO
CO22
Korea
Korea Institute
Institute of
of
Energy
Energy Research
GTL
GTL
KICTEP
KICTEP
LNG
LNG
Development
Development of
of manufacture
manufacture of
of FT
FT synthetic
synthetic oil
oil with
with natural
natural gas
gas
Detailed
Detailed Planning
Planning on
on LNG
LNG plant
plant Area
Area
10
Period
2006.
2006. 11
11 ~ 2009. 10
2006.
2006. 11
11 ~
~ 2009.
2009. 9
9
2006.
2006. 8
8
2009.
2009. 7
7
2007.10
2007.10
2008.
2008. 2
2
COST
REDUCTION
QUALITY
IMPROVEMENT
PRACTICE & ACTION
PLAN
DESIGN&DOCUMENT CONTROL
(DRN, 3D REVIEW)
PROCUREMENT CONTROL
(SPMAT)
SPECIAL PROCESS CONTROL
FIELD MATERIAL CONTROL
CONSTRUCTION CONTROL
COMMISSIONING &
STARTUP CONTROL(FSI)
QUALITY POLICY
CONTROL MANUAL
QUALITY PROCEDURES
WORK PLAN PROCEDURES
INSPECTION AND TEST PLANS
INSPECTION CONTROL
MEASURING CONTROL
TEST EQUIPMENT CONTROL
QUALITY RECORDS CONTROL
INTERNAL QUALITY AUDIT
11
Elect.
Markup
Critical
Area
Critical
Area
Critical
Area
Constructability
Q-CAPTAINS
Critical
Area
13
Critical
Area
Critical
Area
AWARENESS TRAINING
QUALITY SYSTEM
for
COMMSIONING & START UP
HEALTH CHECK
(FSI READINESS)
LESSONS LEARNED
WORKSHOP
is
PROGRESS MONITORING
PREPARE Q AREA
PROCEDURES
PREPARE Q AREA
WORK PLAN
14
HSE
Integrated
Implementation
Plan
Harmonizing
between the
Plant and
Environment
Maintaining a
Safe Working
Environment
Achieving the
Target
Established
15
OHSAS 18001
HECs IT SOLUTION
Internal Communication
HECOS (In-house )
ProjectSpace (EDMS)
Engineering Management
Procurement Management
PRIMAVERA
Construction Management
WJCS
HPCM
16
PR
PR
E&I
E&I
SPPID
PI
PI
HPMAC
SPI
Instrument Index
Hook-up Drawing
Loop Diagram
Design Data
BOM
Material Code
Process Data
Equipment
EDIS
ELM
Line
ELD
LDM
Instrument Electrical
SAM
IDM
EDM
LLM
PI
PI
3D CAD
(PDS/PDMS)
HPCM
SPMAT
APTools
Tag No
(Line, Equipment, Instrument Tag)
All
All
Equipment List
List List
Instrument List
Motor List
17
ISO DWG
18
19
R
E
P
O
R
T
Line
Line List
List
Package
Package List
List
M
O
D
U
L
E
Line
LDM
Equipment
Equipment List
List
Loading
Loading D/S
D/S
Nozzle
Nozzle List
List
Load
Load List
List
Motor
Motor List
List
SAM
IDM
EDM
ELM
ELD
ProjectSpace
2D Nav
P&IDs
P&IDs
File
File
Setup
Project
Import
Instrument
Instrument
Process
Process D/S
D/S
Export
D
A
T
A
B
A
S
E
Line
Line Tag
Tag
Line
Data
Inst.
Inst. Tag
Tag
Instrument
Data
Eqp.
Eqp. Tag
Tag
Equipment
Data
CAESAR II
LLM
3D CAD
(PDS/PDMS)
HPMAC
SPPID SPI
EAM(CMMS)
SP Materials
SPF
Legend
20
existing
future
3D CAD System
3D Modeling System
HECs 3D Modeling system has been introduced to improve efficiency of engineering, reduce
construction error and assure operation satisfactory.
All disciplines are assigned in the 3D Modeling system and over 90% of Engineering Works are
designed and reviewed by 3D Modeling system.
Engg
Data
Line List
EDIS
LDM
LDM
SAM
SAM
Line Data
Management
3D
System
System &
&
Specifications
Specifications
In-House
Program
Plot Plan
(ELP)
P&ID
Catalog
Catalog
Equipment
Equipment Detail
Detail
Inline
Inline Instrument
Instrument
Manhole
Manhole
Pipe
Pipe Support
Support Module
Module
Stress Analysis
Management
Structural
Structural
Penetration
Penetration Hole
Hole
U/G
U/G Module
Module
Joint
Joint Detail
Detail
Inst.
Index
Material
Spec.
IDM
IDM
ELM
ELM
Instrument Data
Management
Equipment
Equipment
Hanger
Hanger &
&
Support
Support
HVAC
HVAC
CRM
CRM
MPM
MPM
Clash Review
Module
Modling
Progress Module
Loading
Data
ELD
ELD
Equipment List
Management
Piping
Piping
Equip.
List
Equipment
Loading Data
Electrical
Electrical
EDM
EDM
Electrical Data
Management
Drawing
Drawing &
&
Report
Report
Space
Space
Management
Management
Design
Design Review
Review
Spool
Spool GEN
GEN
IDCM
IDCM
ISO Drawing
Control Module
Spool
Spool Drawing
Drawing
Isometric
Isometric Drawing
Drawing
Spool
Spool BOM
BOM
Purchase
Purchase BOM
BOM
e-Draw
e-Draw //
Plantwave
Plantwave
Plan
Plan Drawing
Drawing
PSMT
PSMT
RCM
RCM
Pipe Support
Material Take-Off
Report Control
Module
SPMat
SPMat
21
3D CAD System
3D Modeling Review System - Smart Plant Review
3D Modeling Review System in 3 Phase for Accessibility, Operability, Maintainability (AOM)
Objective of each Phase
Phase #1 (30%) -To verify the plot plan
Phase #2 (60%) -To define the piping and cable layout to the required detail for starting the preparation
of construction drawings
Phase #3 (90%) -To assure that the model contains sufficient information for the production of final
documents for fabrication and erection and for the final check of the material requirements.
22
Material libraries
on project or
Enterprise level
Material Life Cycle
Library
(MLCL)
Turn engineers
into Procurement
Knowledge
Inventories,
Forecasts &
Issues
Engineering &
Procurement
Integration
(E&PI)
Site Management
(SM)
Procurement
Traffic Expediting
& Inspection
Construction planning
23
Schedule Control
Work Breakdown Structure
Project Master Schedule
Project Detail Schedule
EDMS
(Project Space)
Schedule Analysis
Resource Control
PRIMAVERA
PMSA
Progress Control
Project S-Curve
Progress Summary Progress
Progress Calculation Sheet
Behind Report
Work Done (or To Be Done) Report
24
Pre-Commissioning &
Commissioning
Check List
Punch List
Project Space
(EDMS)
Status Report
Progress Report
Welding Control
Schedule Analysis
Resource Control
NDE/PWHT Control
Spool Control
Tracking
PO/BM/DWG
Spool B/M
Punch Control
WJCS
Short/Stock/Surplus
SPMAT
Procurement Control
25
Project Start
Engineering
Ready for
Start-up
Mechanical
Completion
Pre-commissioning
Commissioning
Ready for
Operation
Start-up
HPCM
INPUT
Project Data
Engineering Data
(Equipment, Line,
Cable,
Instrument)
OUTPUT
Data Management
Import/Export
Subsystem Data
Punch List
Management
Geographical Data
Report Generation
Scheduling Data
Progress Calculation
26
Export
Check List
Punch List
Status Report
Progress Report
Check/Test Sheets
Progress Chart
27
PETROCHEMICAL PLANT
CHEMICALS
LNG FACILITIES
OFFSHORE FACILITIES
D
UN
Y
H
AI
28
CLIENT
NAFTEC Spa/ Algeria
LOCATION
Arzew, Algeria
CONTRACT PERIOD
2009. 01 ~ 2011. 11
CAPACITY
- Rehabilitation Project (Revamping)
Atmospheric Distillation
(60,000 BPSD 90,000 BPSD)
- Adaptation Project (New)
LNHT & ISOM
(7,500 BPSD, RON=88, UOP)
29
CLIENT
Hyundai Oilbank Co., Ltd.
Korea
Project Site
CAPACITY
Heavy Oil Upgrading Plant
- ARDS : 66,000 BPDS
- RFCC : 52,000 BPDS
LOCATION
Daesan , Korea
CONTRACT PERIOD
2008. 5 ~ 2011. 6
30
CLIENT
Map Ta Phut Olefins Co., Ltd.
Thailand
CAPACITY
Benzene
: 193,000 MTPA
Toluene
: 101,000 MTPA
Mixed Xylene : 139,000 MTPA
LOCATION
Rayong , Thailand
CONTRACT PERIOD
2008. 1 ~ 2010. 1
31
CLIENT
Pak Arab Refinery Ltd. (PARCO)
Pakistan
CAPACITY
Diesel Hydro Desulfurizer Facilities
DHDS Unit : 26,000 BPSD
LOCATION
Mahmood Kot, Pakistan
CONTRACT PERIOD
2008. 6~ 2010. 9
32
CLIENT
Kuwait National Lube Oil Company, Kuwait
CAPACITY
Hydroisomerisation (HIU)
Hydrofinishing (HFU)
Hydrogen Plant (HPU)
Amine Treating (ATU)
: 7,000 BPSD
: 6,500 BPSD
: 4 package
: 2 TPD
LOCATION
Shuaiba, Kuwait
CONTRACT PERIOD
2007. 10 ~ 2011. 4
35 33
CLIENT
SK ENERGY, KOREA
CAPACITY
Alkylation
:
Sulfur
:
Spent Acid Recovery :
Butamer
:
18,000 BPSD
620 TPD
150 TPD
13,000 BPSD
LOCATION
Ulsan, Korea
CONTRACT PERIOD
2006. 2 ~ 2008. 4
36 34
CLIENT
Hyundai Oilbank Co., Ltd.
Korea
CAPACITY
#1 Mogas Hydrotreating Unit
: 20,000 BPSD
#2 Hydrogen Manufacturing Unit : 45,000 Nm3/hr
#3 Gas Oil Hydrotreating Unit
: 25,000 BPSD
LOCATION
Daesan, Korea
CONTRACT PERIOD
2003. 12 ~ 2005. 10
35
Phase 1
(Grass Root)
Capacity (BPSD)
CDU #1
100,000
VDU
44,000
LPG Merox
2,000
Kerosene Merox
7,000
Naphtha Hydrotreater #1
6,000
Catalytic Reformer #1
4,000
Gas Oil Hydrotreater #1
16,000
Hydrocracker
22,000
Delayed Coker
19,000
Hydrogen Generation (MMSCFD) 54
Sulfur Recovery (MT/D)
180
CLIENT
Hyundai Oilbank Co., Ltd.
Korea
LOCATION
Daesan, Korea
CONTRACT PERIOD
Phase 1(Grass Root) 1986 ~ 1988
Phase 2
1994 ~ 1996
Licensor
UOP
UOP
UOP
UOP
UOP
UOP
F/W
KTI
JGC
Phase 2
Capacity (BPSD)
CDU #2
Gas Oil Hydrotreater #1
Kerosene / Gas OilHydrotreater
Kerosene Hydrotreater
Naphtha Hydrotreater #2
Platformer #2
Sulfur Recovery (MT/D)
36
200,000
32,000
24,000
24,000
20,000
20,000
180
Licensor
EXXON
EXXON
EXXON
UOP
UOP
JGC
CLIENT
Formosa Petrochemical Co.
CAPACITY
Base Oil : 10,000 BPSD
#2 VDU : 57,000 BPSD
LHDC
: 25,000 BPSD
MSDW
: 14,000 BPSD
WOU
: 10,000 BPSD
LOCATION
Taiwan
CONTRACT PERIOD
2005. 2 ~ 2007. 6
37
CLIENT
HELLENIC ASPROPYRGOS
REFINERY S.A.
CAPACITY
Atmospheric :
Vacuum
:
54,000 BPSD
15,000 BPSD
LOCATION
Attica, Greece
CONTRACT PERIOD
1997. 7 ~ 2001. 12
38
CLIENT
Hyundai Oilbank Co., Ltd.
Korea
CAPACITY
Paraxylene : 300,000 MTPA
Benzene
: 108,000 MTPA
LOCATION
Daesan, Korea
CONTRACT PERIOD
1996 ~ 1997
39
CLIENT
Petro Vietnam, Vietnam
Hanoi
Refinery
CAPACITY
Polypropylene : 150,000 MTPA
Site
LOCATION
Dung Quat, Vietnam
CONTRACT PERIOD
2008. 1 ~ 2010. 4
Hochi minh
42 40
Site
CLIENT
Arabian Amines Company
CAPACITY
Ethyleneamine : 27,200 MTPA
LOCATION
Al-Jubail, Saudi Arabia
CONTRACT PERIOD
2007. 12 ~ 2010. 1
43 41
42
43
CLIENT
Hyundai Petrochemical Co., Ltd.
LOCATION
Daesan, Korea
CONTRACT PERIOD
Phase I
1988 ~ 1991
Phase II
1995 ~ 1998
Phase
I
Capacity (MTPA)
Licensor
Ethylene
Butadiene
SM
LDPE (Tubular)
LLDPE
HDPE
PP
EO/EG
RPG Hydrotreating
Benzene Recovery
350,000
57,000
100,000
100,000
60,000
100,000
170,000
100,000
430,000
140,000
MW Kellogg
Nippon Zeon
Raytheon (Badger)
BASF
Stamicarbon
Phillips
Himont
Scientific Design
IFP
HRI
Phase
II
Capacity (MTPA)
Licensor
Ethylene
Butadiene
MTBE
SM
EO/EG
EVA/LDPE (Autoclave)
HDPE/LLDPE
PP
VCM
PVC
Benzene Recovery
SBR
44
450,000
104,000
100,000
200,000
200,000
85,000
130,000
160,000
50,000
150,000
190,000
82,000
MW Kellogg
Nippon Zeon
CD-Tech
Raytheon (Badger)
Scientific Design
Exxon
UCC
Technipol
Mitsui Toatsu
Geon
IFP
Goodyear
CLIENT
Ras Lanuf Oil & Gas Processing Co.
CAPACITY
HDPE : 80,000 MTPA (UCC UNIPOL Process)
LLDPE : 80,000 MTPA (UCC UNIPOL Process)
LOCATION
Ras Lanuf, Libya
CONTRACT PERIOD
1991 ~ 1998
45
S-2 Project
CLIENT
Kumgang Korea Chemical Co., Ltd.
(KCC), Korea
CAPACITY
Methyl Chloro Silane Monomer : 50,000 MTPA
- Distillation, Hydrolysis, Polymer,
- HTV, Gum, Polymer Storage (2nd)
LOCATION
Daesan, Korea
CONTRACT PERIOD
2005. 8 ~ 2007. 10
48 46
CLIENT
Kumgang Korea Chemical Co., Ltd.
(KCC), Korea
CAPACITY
Methyl Chloro Silane Monomer
: 25,000 MTPA
LOCATION
Jeonju, Korea
CONTRACT PERIOD
2001 ~ 2004
49 47
CLIENT
SAUDI ARAMCO
CAPACITY
1) FEED Gas Inlet Facilities
2) Gas Treatment Facilities
(600 MMSCFCD x 3 Trains)
- Acid Gas Removal Unit
- Acid Gas Enrichment Unit
- TEG Gas Drying Unit
- Propane Refrigeration Unit
3) Offsite
LOCATION
Karan Gas Field, Saudi Arabia
CONTRACT PERIOD
2009. 3 ~ 2012. 1
50 48
CLIENT
QATAR SHELL GTL LIMITED
CAPACITY
LPU Package Product
Naphtha
Gas Oil
Base Oil
: 140,000 BPSD
: 17,800 BPSD
: 32,684 BPSD
: 16,616 BPSD
LOCATION
Ras Laffan, Qatar
CONTRACT PERIOD
2006. 7 ~ 2010. 9
51 48
CLIENT
Saudi Aramco
CAPACITY
Sour associated Gas : 563 MMSCFD
Hydrocarbon Condensate : 18.8 MBD
315 MMSCFD of associated Gas
70 MBPCD of C3+ NGL Production
LOCATION
Khurais, Saudi Arabia
CONTRACT PERIOD
2006. 9 ~ 2009. 5
52
49
CLIENT
Agip Iran BV
CAPACITY
500 MMSCFD x 4 Trains
LOCATION
Assaluyeh, Iran
CONTRACT PERIOD
2002. 3 ~ 2005. 2
50
CLIENT
Total Fina Elf NIOC
CAPACITY
500 MMSCFD x 4 Trains
LOCATION
Assaluyeh, Iran
CONTRACT PERIOD
1999. 3 ~ 2003. 3
51
CLIENT
PETRONAS GAS SDN. BHD.,
Malaysia
CAPACITY
Sales Gas : 250 MMSCFD x 3
LOCATION
Kerteh, Terengganu State,
Malaysia
CONTRACT PERIOD
1990 ~ 1994
52
NGL-4 PROJECT
CLIENT
Qatar Petroleum Corporation
CAPACITY
NGL
:
Ethane
:
Propane :
Butane
:
10,200 TPD
3,150 TPD
3,000 TPD
2,100 TPD
LOCATION
Dukhan & Mesaieed, Qatar
CONTRACT PERIOD
1999. 8 ~ 2003. 6
53
CLIENT
Sirte Oil Company
CAPACITY
Gas Treatment
Condensate
: 350 MMSCFD
: 31,000 BPD
LOCATION
Attahaddy, Libya
CONTRACT PERIOD
1999. 9 ~ 2004. 2
CLIENT
Saudi ARAMCO
CAPACITY
Gas Processing
Facilities : 1,600 MMSCFD
LOCATION
Hawiya, Saudi Arabia
CONTRACT PERIOD
1998. 8 ~ 2002. 4
54
CLIENT
Shell Petroleum Development
Company
CAPACITY
Oil Treatment : 1,510,000 BPD
LOCATION
Bonny, Nigeria
CONTRACT PERIOD
2002. 3 ~ 2006. 2
CLIENT
Kuwait National Petroleum
Company
CAPACITY
Trestle 2,960m, Berth 4 units,
Loading Arm 36 units
LOCATION
Mina Al-Ahmadi, Kuwait
CONTRACT PERIOD
2001. 3 ~ 2004. 4
55
CLIENT
Tokyo Gas Engineering Co., Ltd.
Japan
CAPACITY
Terminal and Trunk Line
Phase I : 3,370 KTPA
LOCATION
Zhuhai, China
CONTRACT PERIOD
2007. 10 ~ 2008. 6
56
CLIENT
Korea Gas Corporation
CAPACITY
Berth Facilities
: 75,000 Ton
LNG Storage Tank : 100,000 K x 3 Units
LNG Vaporization & Sendout Facilities
LOCATION
Inchon, Korea
CONTRACT PERIOD
1991. 5 ~ 1996. 12
CLIENT
Korea Gas Corporation
CAPACITY
LNG 7.5 x 10^6 MTPA
Send-Out : 3,060 Ton/Hr
STORAGE TANK
- Above-ground
- In-ground
: 10 Units
: 8 Units
LOCATION
Inchon, Korea
CONTRACT PERIOD
1991 ~ 1998
57
CLIENT
UNOCAL Makassar Ltd.
CAPACITY
TLP (Tension Leg Platform)
FPU (Floating Production Unit)
60,000 bbl/Oil & 150 MMSCFD Gas Processing
LOCATION
Indonesia
CONTRACT PERIOD
2001 ~ 2003
CLIENT
Korea National Oil Corp., Korea
CAPACITY
4 Legged Jacket with 8 Skirt Piles
4 Legged 4 Level Deck
Gas
: 50 MMSCFD
Condensate : 15 BBL/MMSCFD
LOCATION
Korea
CONTRACT PERIOD
2001. 3 ~ 2003. 11
58
CLIENT
ONGC, India
CAPACITY
Gas
: 30 MMSCFD
LOCATION
India
CONTRACT PERIOD
1997 ~ 1999
CLIENT
ONGC, India
CAPACITY
Process Platform :
- Oil
: 128,460 BPSD
- Gas : 2.56 MMSCFD
Water Injection Platform :
229 BWPD Well Platform
LOCATION
India
CONTRACT PERIOD
1992 ~ 1994
59
Algeria
Algeria
Korea
Korea
Project
Arzew
Arzew Refinery
Refinery Project
Project
SK
SK HCC
HCC Project
Project
Plant Description
- Rehabilitation
Rehabilitation Project
Project (Revamping)
(Revamping)
Atmospheric
Atmospheric Distillation
Distillation
(60,000
(60,000 BPSD
BPSD
90,000
90,000 BPSD)
BPSD)
- Adaptation
Adaptation Project
Project (New)
(New)
LNHT
LNHT &
& ISOM
ISOM
(7,500
(7,500 BPSD,
BPSD, RON=88,
RON=88, UOP)
UOP)
VDU
:
70,000
BPSD
VDU : 70,000 BPSD
HCK
HCK :: 40,000
40,000 BPSD
BPSD
Period
2009.
2009. 01
01 ~
~ 2011.
2011. 11
11
2008.
2008. 10
10 ~
~ 2011.
2011. 2
2
VB
VB :: 40,000
40,000 BPSD
BPSD
H2
H2 :: 85MMSCFD
85MMSCFD
SRP
SRP :: 300TPSD
300TPSD
Korea
Korea
HDO#2
HDO#2 HOU
HOU Project
Project
(FEED
(FEED &
& LLI
LLI Procurement)
Procurement)
ARDS
ARDS :: 66,000
66,000 BPSD
BPSD (CLG)
(CLG)
RFCC
RFCC :: 52,000
52,000 BPSD
BPSD (UOP)
(UOP)
GHT
GHT :: 40,000
40,000 BPSD
BPSD (SHELL)
(SHELL)
LMX
LMX :: 25,400
25,400 BPSD
BPSD (UOP)
(UOP)
ALK
ALK :: 16,000
16,000 BPSD
BPSD (DuPont)
(DuPont)
KMX
KMX :: 15,000
15,000 BPSD
BPSD (UOP)
(UOP)
SHU
SHU :: 12,500
12,500 BPSD
BPSD (UOP)
(UOP)
PRU
PRU :: 10,000
10,000 BPSD
BPSD (UOP)
(UOP)
BTU
BTU :: 8,100
8,100 BPSD
BPSD (UOP)
(UOP)
SRU
SRU :: 500
500 TPSD
TPSD (CB&I)
(CB&I)
SAR
:
150
TPSD
(MECS)
SAR : 150 TPSD (MECS)
HMU
HMU :: 110
110 MMSCFD
MMSCFD (HTAS)
(HTAS)
60
2008.
2008. 5
5~
~ 2011.
2011. 6
6
Project
Pakistan
Pakistan
MCR
MCR DHDS
DHDS Project
Project
Thailand
Thailand
Aromatics
Aromatics Recovery
Recovery Project
Project
Indonesia
Indonesia
PERTAMINA
PERTAMINA DUMAI
DUMAI Revamping
Revamping
Project
Project
(Process
(Process Design
Design Package)
Package)
Kuwait
Kuwait
Base
Base Oil
Oil Plant
Plant Project
Project
Plant Description
DHDS
DHDS :: 26,000
26,000 BPSD
BPSD
Benzene
:: 193,000
Benzene
193,000 MTPA
MTPA
Toluene
:: 101,000
Toluene
101,000 MTPA
MTPA
Mixed
Mixed Xylene
Xylene :: 139,000
139,000 MTPA
MTPA
CDU
CDU Revamping
Revamping
(100,000
(100,000 BPSD
BPSD to
to 200,000
200,000 BPSD)
BPSD)
VDU
VDU :: 50,000
50,000 BPSD
BPSD
PSA
PSA :: 12,000
12,000 Nm3/h
Nm3/h
Hydroisomerisation
Hydroisomerisation (HIU)
(HIU)
:7,000
:7,000 BPSD
BPSD
Hydrofinishing
Hydrofinishing (HFU)
(HFU)
:6,500
:6,500 BPSD
BPSD
Hydrogen
Hydrogen Plant
Plant (HPU)
(HPU)
:4
:4 package
package
Amine
Amine Treating
Treating (ATU)
(ATU)
:2
:2 TPD
TPD
61
Period
2008.
2008. 6
6 ~ 2010.
2010. 9
9
2008.
2008. 1
1~
~ 2010.
2010. 1
1
2008.
2008. 3
3~
~ 2008.
2008. 8
8
2007.
2007. 10
10 ~
~ 2011.
2011. 4
4
Project
Plant Description
Period
Korea
Korea
SK
SK No.2
No.2 FCC
FCC Project
Project
Alkylation
Alkylation (Stratco)
(Stratco) :: 18,000
18,000 BPSD
BPSD
Sulfur
:: 620
Sulfur (TPA)
(TPA)
620 TPSD
TPSD
2006.
2006. 2
2~
~ 2008.
2008. 4
4
Kuwait
Kuwait
Crude
Crude Export
Export Facility
Facility Project
Project
Crude
Crude Oil
Oil Production
Production :: 3MMBOPD
3MMBOPD
Increase
Increase Oil
Oil Export
Export Potential
Potential
:: 2MMBOPD
2MMBOPD
2005.
2005. 10
10 ~
~ 2008.
2008. 9
9
Taiwan
Taiwan
Lube
Lube Base
Base Oil
Oil Project
Project
Base
Base Oil
Oil :: 10,000
10,000 BPSD
BPSD
#2
#2 VDU
VDU :: 57,000
57,000 BPSD
BPSD
LHDC
:: 25,000
LHDC
25,000 BPSD
BPSD
MSDW
MSDW
WOU
WOU
Korea
Korea
Clean
Clean Fuels
Fuels Project
Project
Korea
Korea
Hydrogen
Hydrogen Plant
Plant Project
Project
:: 14,000
14,000 BPSD
BPSD
:: 10,000
10,000 BPSD
BPSD
1
1 Mogas
Mogas Hydrotreating
Hydrotreating Unit
Unit
:: 20,000BPSD
20,000BPSD
2
2 Hydrogen
Hydrogen Manufacturing
Manufacturing Unit
Unit
:45,000
:45,000 Nm3/hr
Nm3/hr
3
3 Gas
Gas Oil
Oil Hydrotreating
Hydrotreating Unit
Unit
:25,000
:25,000 BPSD
BPSD
Hydrogen
Hydrogen :: 29,000
29,000 MTPA
MTPA
62
2005.
2005. 2
2~
~ 2007.
2007. 6
6
2003.
2003. 12
12 ~
~ 2005.
2005. 10
10
2002.
2002. 7
7~
~ 2004.
2004. 7
7
Greece
Greece
India
India
Philippines
Philippines
Korea
Korea
Project
Crude
Crude &
& Vacuum
Vacuum
Period
:: 15,000
15,000 BPSD
BPSD
:: 44,000
44,000 BPSD
BPSD
1997.
1997. 7
7~
~ 2001.12
2001.12
Distillation
Distillation Unit
Unit
VDU
VDU
ADU
ADU
HPCL
HPCL Hydrogen
Hydrogen
Hydrogen
Hydrogen :: 14,500
14,500 MTPA
MTPA
1998.
1998. 1
1~
~ 2000.12
2000.12
Generation
Generation Unit
Unit
(Haldor
(Haldor Topsoe)
Topsoe)
Petron
Petron TCCU
TCCU Revamp
Revamp &
&
TCCU
TCCU Revamping:
Revamping: 3,000
3,000 BPSD
BPSD
Mixed
Mixed Xylene
Xylene Unit
Unit
(12,000
(12,000 BPSD
BPSD to
to 15,000
15,000 BPSD)
BPSD)
Mixed
Mixed Xylene
Xylene :: 7,200
7,200 BPSD
BPSD (UOP)
(UOP)
Hyundai
Hyundai Aromatics
Aromatics
Paraxylene
Paraxylene :: 300,000
300,000 MTPA
MTPA
Benzene
:: 108,000
Benzene
108,000 MTPA
MTPA
1996
1996 ~
~ 1997
1997
Phase
Phase 1
1 CDU
CDU :: 100,000
100,000 BPSD
BPSD
VDU
VDU :: 44,000BPSD
44,000BPSD
Phase
Phase 2
2 CDU
CDU :: 200,000
200,000 BPSD
BPSD
Phase
Phase 1
1 :: 1986
1986 ~
~ 1988
1988
Phase
Phase 2
2 :: 1994
1994 ~
~ 1996
1996
Complex
Complex Project
Project
Korea
Korea
Plant Description
Hyundai
Hyundai Oil
Oil Refinery
Refinery Project
Project
(Phase1
(Phase1 &
& Phase
Phase 2)
2)
63
1998.11
1998.11 ~
~ 2000.
2000. 2
2
Project
Plant Description
Period
Vietnam
Vietnam
PV
PV TEX
TEX PET
PET Project
Project
Polyester
Polyester 500
500 Ton/Day
Ton/Day
(Staple
(Staple Fiber
Fiber 400
400 T/D,
T/D, Filament
Filament 100
100
T/D)
T/D)
Vietnam
Vietnam
Dung
Dung Quat
Quat PP
PP Project
Project
Polypropylene
Polypropylene :: 150,000
150,000 MTPA
MTPA
2008.
2008. 1
1~
~ 2010.
2010. 4
4
Saudi
Saudi Arabia
Arabia
AAC
AAC Ethyleneamines
Ethyleneamines Project
Project
Ethyleneamine
Ethyleneamine :: 27,200
27,200 MTPA
MTPA
2007.
2007. 12
12 ~
~ 2010.
2010. 1
1
Korea
Korea
MMA
MMA Project
Project
MMA
MMA (Methyl
(Methyl Methacrylate)
Methacrylate)
:: 90,000
90,000 MTPA
MTPA
-MMA
-MMA Purification
Purification Unit
Unit
Korea
Korea
PMMA
PMMA Project
Project
PMMA
PMMA (Poly
(Poly MethylMethacrylate)
MethylMethacrylate)
:: 40,000
40,000 MTPA
MTPA
-- Polymerization
Polymerization Unit
Unit
-- Extrusion
Extrusion Unit
Unit
64
2009.
2009. 7
7~
~ 2011.
2011. 7
7
2007.
2007. 5
5~
~ 2009.
2009. 2
2
2007.
2007. 4
4~
~ 2008.
2008. 6
6
Project
Plant Description
Period
Iran
Iran
Ethylene
Ethylene Plant
Plant of
of 11th
11th Olefin
Olefin
Project
Project
Ethylene
Ethylene Plant:
Plant: 1,200
1,200 MTPA
MTPA
Low
Temp.
Storage
Tank:
Low Temp. Storage Tank: 10,000
10,000 ton
ton
2006.
2006. 1
1~
~ 2009.
2009. 12
12
Korea
Korea
Lotte
Lotte Offsite
Offsite Expansion
Expansion Project
Project
Naphtha
Naphtha Tank
Tank :: 25,000
25,000 M3
M3 xx 2
2
Benzene
Benzene Tank
Tank :: 10,000
10,000 M3
M3 xx 1
1
2005.
2005. 10
10 ~
~ 2006.
2006. 11
11
Korea
Korea
D-7
D-7 Project
Project
SM
SM Cap.
Cap. Upgrade:
Upgrade: 70,000
70,000 MTPA
MTPA
(100,000
(100,000 MTPA
MTPA ->
-> 170,000
170,000 MTPA)
MTPA)
2004.
2004. 1
1~
~ 2005.
2005. 12
12
Indonesia
Indonesia
UAB#3
UAB#3 Plant
Plant
Linear
Linear &
& Branched
Branched Alkyl
Alkyl Benzene
Benzene
:: 60,000
60,000 MTPA
MTPA
(UOP
(UOP HF
HF Alkylation
Alkylation Process
Process ))
65
1996.
1996. 9
9~
~ 1998.
1998. 4
4
Korea
Korea
Project
Hyundai
Hyundai Petrochemical
Complex
Complex I & II
Plant Description
Phase
Phase II
Ethylene
Ethylene
-SM
-SM
-LDPE
-LDPE
-LLDPE
-LLDPE
-HDPE
-HDPE
-PP
-PP
350,000
350,000 MTPA
MTPA
100,000
100,000 MTPA
MTPA
100,000
100,000 MTPA
MTPA
60,000
60,000 MTPA
MTPA
100,000
100,000 MTPA
MTPA
170,000
170,000 MTPA
MTPA
Period
Phase
Phase II
:: 1988
1988 ~
~ 1991
1991
Phase
Phase II
II
:: 1995
1995 ~
~ 1998
1998
Phase
Phase II
II
Ethylene
Ethylene
-SM
-SM
-HDPE/LLDPE
-HDPE/LLDPE
-PVC
-PVC
450,000
450,000 MTPA
MTPA
200,000
200,000 MTPA
MTPA
130,000
130,000 MTPA
MTPA
150,000
150,000 MTPA
MTPA
-Benzene
-Benzene Recovery
Recovery 190,000
190,000 MTPA
MTPA
- PP
160,000
PP
160,000 MTPA
MTPA
Libya
Libya
Ras
Ras Lanuf
Lanuf Petrochemical
Petrochemical
Complex
Complex
HDPE
HDPE :: 80,000
80,000 MTPA
MTPA
LLDPE
LLDPE :: 80,000
80,000 MTPA
MTPA
Korea
Korea
Yukong-Arco
Yukong-Arco POSM
POSM Complex
Complex
Propylene
Propylene Oxide
Oxide :: 100,000
100,000 MTA
MTA
Styrene
Styrene Monomer:
Monomer: 225,000
225,000 MTA
MTA
66
1991
1991 ~
~ 1998
1998
1988.
1988. 6
6~
~ 1990.
1990. 6
6
Project
Plant Description
Period
Vietnam
Vietnam
PVTEX
PVTEX PET
PET Project
Project
Polyester:
Polyester: 500
500 TPD
TPD
-- Polycondensation
Polycondensation Unit
Unit (Process
(Process Unit)
Unit)
-- Staple
Staple Fiber
Fiber Unit
Unit
-- Filament
Filament Unit
Unit
-- UT/OS
UT/OS Unit
Unit
2009.
2009. 5
5~
~ 2011.
2011. 5
Korea
Korea
P-2
P-2 Project
Project
Polysilicon:
Polysilicon: 3,000
3,000 MTPA
MTPA
2008.
2008. 2
2~
~ 2010.
2010. 5
5
Korea
Korea
S-2
S-2 Project
Project
Methyl
Methyl Chloro
Chloro Silane
Silane Monomer
Monomer ::
50,000
50,000 MTPA
MTPA
Korea
Korea
H
H Project
Project
Ethylene
Ethylene Glycol
Glycol Monobutyl
Monobutyl Ether
Ether (BG)
(BG) ::
54
54 MTPD
MTPD
Diethylene
Diethylene Glycol
Glycol
MonobutylEther(BDG):14
MonobutylEther(BDG):14 MTPD
MTPD
Korea
Korea
KCC
KCC Silicon
Silicon Project
Project
Methyl
Methyl Chloro
Chloro Silane
Silane Monomer
Monomer
:: 25,000
25,000 MTPA
MTPA
67
2005.
2005. 8
8~
~ 2007.
2007. 10
10
2004.
2004. 5
5~
~ 2005.
2005. 6
6
2001
2001 ~
~ 2004
2004
China
China
Project
China
China Pingdingshan
Pingdingshan
Plant Description
Period
Urea
Urea :: 400
400 MTPD
MTPD
1996.
1996. 1
1~
~ 2000.
2000. 6
6
Urea
Urea Plant
Plant
China
China
China
China Shaanxi
Shaanxi Urea
Urea Plant
Plant
Urea
Urea :: 400
400 MTPD
MTPD
1995.
1995. 6
6~
~ 2000.
2000. 6
6
China
China
Chishui
Chishui Urea
Urea Plant
Plant
Urea
Urea :: 500
500 MTPD
MTPD
1993.
1993. 6
6~
~ 1996.
1996. 6
6
68
Project
Saudi
Saudi Arabia
Arabia
KARAN
KARAN Gas
Gas Facilities
Facilities Project
Project
Qatar
Qatar
Pearl
Pearl GTL
GTL C5
C5 Project
Project
Saudi
Saudi Arabia
Arabia
Khurais
Khurais Gas
Gas Processing
Processing Facilities
Facilities
Kuwait
Kuwait
DOW-PIC
DOW-PIC Olefin
Olefin Project
Project
Plant Description
1)
1) FEED
FEED Gas
Gas Inlet
Inlet Facilities
Facilities
2)
2) Gas
Gas Treatment
Treatment Facilities
Facilities
(600
(600 MMSCFCD
MMSCFCD xx 33 Trains)
Trains)
-- Acid
Acid Gas
Gas Removal
Removal Unit
Unit
-- Acid
Acid Gas
Gas Enrichment
Enrichment Unit
Unit
-- TEG
TEG Gas
Gas Drying
Drying Unit
Unit
-- Propane
Propane Refrigeration
Refrigeration Unit
Unit
3)
3) Offsite
Offsite
LPU
LPU Package
Package Product:
Product: 140,000
140,000 BPSD
BPSD
Naphtha
:
17,800
BPSD
Naphtha
: 17,800 BPSD
Gas
:: 32,684
Gas Oil
Oil
32,684 BPSD
BPSD
Base
:: 16,616
Base Oil
Oil
16,616 BPSD
BPSD
Sour
Sour associated
associated Gas
Gas :: 563
563 MMSCFD
MMSCFD
Hydrocarbon
Hydrocarbon Condensate
Condensate :: 18.8
18.8 MBD
MBD
315
315 MMSCFD
MMSCFD of
of associated
associated Gas
Gas
70
70 MBPCD
MBPCD of
of C3+
C3+ NGL
NGL Production
Production
Berth
Berth 31,32
31,32 Upgrade
Upgrade
New
New Berth
Berth 34,35
34,35 and
and Topside
Topside Installation,
Installation,
Construct
Construct 44 Buildings
Buildings
69
Period
2009.
2009. 3
3~
~ 2012.
2012. 1
1
2006.
2006. 7
7~
~ 2010.
2010. 9
9
2006.
2006. 9
9~
~ 2009.
2009. 5
5
2006.
2006. 4
4~
~ 2008.
2008. 3
3
Project
Plant Description
Period
Nigeria
Nigeria
EGP-3
EGP-3 Project
Project
Gas
Gas Processing
Processing Facility
Facility :: 395
395 MMSCFD
MMSCFD
(285
(285 MMSCFD
MMSCFD ->
-> 680
680 MMSCFD)
MMSCFD)
Slug
Slug Catcher,
Catcher, Dehydration,
Dehydration, NGL
NGL
Extraction,
Extraction, LPG
LPG Fractionation
Fractionation
2005.
2005. 6
6~
~ 2007.
2007. 12
12
Kuwait
Kuwait
New
New Ethane
Ethane Recovery
Recovery Plant
Plant
Project
Project
Ethane
Ethane Recovery
Recovery :: Ethane
Ethane 96%
96%
(Recovery
(Recovery from
from 1,140
1,140 MMSCFD
MMSCFD Gas)
Gas)
2005.
2005. 6
6~
~ 2007.
2007. 11
11
Kuwait
Kuwait
Kuwait
Kuwait Facility
Facility Upgrade
Upgrade Project
Project
Kuwait
Kuwait
KNPC
KNPC BERTH
BERTH #
# 5&6
5&6 Expansion
Expansion
Project
Project
Indonesia
Indonesia
Suban
Suban II
II Gas
Gas Project
Project
Nigeria
Nigeria
Bonny
Bonny Terminal
Terminal Integrated
Integrated
Project
Project
LP
LP Separator,
Separator, TV/HP
TV/HP Gas
Gas compressor,
compressor,
Hydro-Cyclone,
Hydro-Cyclone, Desalter
Desalter Package,
Package,
Chemical
Chemical
Berth:
Berth: 20,000
20,000 to
to 120,000
120,000 DWT
DWT xx 2
2
-- Marine
Marine Loading
Loading Arm
Arm :: 12
12 Sets
Sets
-- Metering
:: 12
Metering System
System
12 Sets
Sets
-- Automatic
Automatic Gangway
Gangway :: 2
2 Sets
Sets
-- Quick
Quick Release
Release Hook
Hook :: 24
24 Sets
Sets
Well
Well Site
Site Facilities
Facilities &
& Gathering
Gathering Station
Station
Trunk
Trunk Line
Line (26/43.5km)
(26/43.5km)
Revamping
Revamping Work
Work at
at existing
existing Grissik
Grissik
Central
Central Gas
Gas Plant
Plant
Oil
Oil Treatment
Treatment :: 1,510,000
1,510,000 BPSD
BPSD
70
2005.
2005. 5
5~
~ 2007.
2007. 6
6
2005.
2005. 9
9~
~ 2007.
2007. 6
6
2004.
2004. 9
9~
~ 2006.
2006. 8
8
2002.
2002. 3
3~
~ 2006.
2006. 2
2
Project
Plant Description
Period
Iran
Iran
South
South Pars
Pars Field
Field Development
Development
Phase
Phase 4&5
4&5
Gas
Gas Processing
Processing Facilities
Facilities ::
500
500 MMSCFD
MMSCFD xx 4
4 Trains
Trains
Kuwait
Kuwait
VSM
VSM Driven
Driven Crude
Crude Transit
Transit Pumps
Pumps
at
at 11
11 GCs
GCs
10
10 Pumps
Pumps :: 160,000
160,000 BOPD
BOPD
1
:: 120,000
1 Pump
Pump
120,000 BOPD
BOPD
Control
Control System
System Modification
Modification
2003.
2003. 1
1~
~ 2004.
2004. 7
7
Kuwait
Kuwait
KOC
KOC Pipeline
Pipeline Facilities
Facilities
Pipeline
Pipeline from
from Kuwait
Kuwait North
North to
to CMM
CMM Area
Area
in
in KOC
KOC :: 48
48 Inch
Inch xx 121
121 KM
KM
2002.
2002. 10
10 ~
~ 2004.
2004. 6
Kuwait
Kuwait
New
New Oil
Oil Pier
Pier &
& Associated
Associated
Topside
Topside Facilities
Facilities at
at MAA
MAA
Refinery
Refinery
New
New MAA
MAA Pier
Pier
(Trestle
(Trestle 2,962m,
2,962m, Berth
Berth 4
4 Units,
Units, Loading
Loading
Arm
Arm 36
36 Units)
Units)
2001.
2001. 3
3~
~ 2004.
2004. 4
4
Indonesia
Indonesia
Suban
Suban Gas
Gas Project
Project
Gas
Gas Processing
Processing :: 2
2 xx 150
150 MMSCFD
MMSCFD
Well
Well Site
Site Facilities
Facilities &
& Gathering
Gathering Station
Station
2001.
2001. 3
3~
~ 2003.
2003. 4
4
71
2002.
2002. 3
3~
~ 2005.
2005. 2
2
Indonesia
Indonesia
Project
Sumpal
Sumpal Gas
Gas Project
Project
Plant Description
Well
Well Site
Site Surface
Surface Piping,
Piping, Flowlines
Flowlines
Trunklines
Trunklines (16
(16 // 4.5Km,
4.5Km, 28
28 // 9
9 Km)
Km)
Period
2001.
2001. 3
3~
~ 2002.
2002. 12
12
Grissik
Grissik Central
Central Gas
Gas Plant
Plant Expansion
Expansion
Libya
Libya
Attahaddy
Attahaddy Gas
Gas Development
Development
Project
Project
Gas
Gas Treatment
Treatment :: 350
350 MMSCFD
MMSCFD
Condensate
:: 31,000
Condensate
31,000 BPD
BPD
1999.
1999. 9
9~
~ 2004.
2004. 2
2
Qatar
Qatar
NGL-4
NGL-4 Project
Project
NGL
NGL
Ethane
Ethane
Propane
Propane
Butane
Butane
1999.
1999. 8
8~
~ 2003.
2003. 6
6
Iran
Iran
South
South Pars
Pars Field
Field Development
Development
Phase
Phase 2&3
2&3
Gas
Gas Processing
Processing Facilities
Facilities ::
500
500 MMSCFD
MMSCFD xx 4
4 Trains
Trains
72
:: 10,200
10,200 TPD
TPD
:: 3,150
TPD
3,150 TPD
:: 3,000
3,000 TPD
TPD
:: 2,100
2,100 TPD
TPD
1999.
1999. 3
3 ~ 2003.
2003. 3
3
Project
Plant Description
Pakistan
Pakistan
Pirkoh
Pirkoh Gas
Gas Field
Field Development
Development
Project
Project
Gas
Gas Compression
Compression Plan:
Plan: 250
250 MMSCFD
MMSCFD
Saudi
Saudi Arabia
Arabia
Hawiyah
Hawiyah Inlet
Inlet and
and Auxiliary
Auxiliary
Facilities
Facilities
Gas
Gas Processing
Processing :: 1,600
1,600 MMSCFD
MMSCFD
Malaysia
Malaysia
Gas
Gas Process
Process Plant
Plant 2&3,4
2&3,4
Sales
Sales Gas
Gas :: 250
250 MMSCFD
MMSCFD xx 3
3
73
Period
1997
1997 ~
~ 1999
1999
1998.
1998. 8
8~
~ 2002.
2002. 4
4
1990
1990 ~
~ 1994
1994
Project
Plant Description
Period
Korea
Korea
Inchon
Inchon LNG
LNG Receiving
Receiving Terminal
Terminal
(2nd
(2nd Extension)
Extension)
Berth
Berth Facilities
Facilities :: 75,000
75,000 Ton
Ton
LNG
LNG Ship
Ship Jetty
Jetty &
& Trestle
Trestle
Above
Above LNG
LNG Storage
Storage Tank
Tank ::
100,000kl
100,000kl xx 4
4 Units
Units
In-ground
In-ground LNG
LNG Tank
Tank ::
140,000kl
140,000kl xx 2
2 units
units
In-ground
In-ground LNG
LNG Tank
Tank ::
200,000kl
200,000kl xx 8
8 units
units
LNG
::
LNG Vaporization
Vaporization &
& Send-out
Send-out Facility
Facility
2,730
2,730 ton/h
ton/h
1995.
1995. 12
12 ~
~ 2009.
2009. 11
11
China
China
Zhuhai
Zhuhai LNG
LNG Terminal
Terminal FEED
FEED
Services
Services
Terminal
Terminal and
and Trunk
Trunk line
line
Phase
Phase II :: 3370
3370 KTPA
KTPA
2007.
2007. 10
10 ~
~ 2008.
2008. 6
6
Korea
Korea
Kwang
Kwang Yang
Yang LNG
LNG Terminal
Terminal
Extension
Extension Project
Project
LNG
LNG Tank
Tank
Send-Out
Send-Out
Sempra
Sempra Baja
Baja LNG
LNG Terminal
Terminal
Project
Project
Receiving
Receiving Terminal
Terminal :: 220,000m3
220,000m3 LNG
LNG
Tankers
Tankers
Mexico
Mexico
:: 8
8 Unit
Unit
:: 2,020
2,020 T/H
T/H
(Unloading
(Unloading Arms
Arms :: 3
3 Sets)
Sets)
74
2004.
2004. 9
9~
~ 2005.
2005. 6
6
2001.
2001. 3
3~
~ 2003.
2003. 8
8
Project
Plant Description
Korea
Korea
In-chon
In-chon LNG
LNG
Receiving
Receiving Terminal
Terminal
(1
(1stst Extension)
Extension)
LNG
LNG :: 7.5
7.5 xx 10^6
10^6 MTPA,
MTPA,
Send-Out
Send-Out :: 3,060
3,060 Ton/Hr,
Ton/Hr,
STORAGE
STORAGE TANK
TANK
Above-ground
Above-ground :: 10
10 Units
Units
In-ground
:: 8
In-ground
8 Units
Units
Korea
Korea
In-chon
In-chon LNG
LNG
Receiving
Receiving Terminal
Terminal
Berth
:: 75,000
Berth Facilities
Facilities
75,000 Ton
Ton
LNG
LNG Storage
Storage Tank
Tank :: 100,000
100,000 K
K xx 3
3
75
Period
1991
1991 ~
~ 1998
1998
1991.
1991. 5
5~
~ 1996.12
1996.12
Project
Plant Description
Period
Korea
Korea
Donghae-1
Donghae-1 Natural
Natural Gas
Gas
Production
Production Facilities
Facilities
4
4 Legged
Legged Jacket
Jacket with8
with8 Skirt
Skirt Piles
Piles
4
4 Legged
Legged 4
4 Level
Level Deck
Deck
Gas:
Gas: 50
50 MMSCFD
MMSCFD
Condensate:
Condensate: 15
15 BBL/MMSCFD
BBL/MMSCFD
2001.
2001. 3
3~
~ 2003.
2003. 11
11
Indonesia
Indonesia
West
West Seno
Seno Field
Field Development
Development
Project
Project
TLP(Tension
TLP(Tension Leg
Leg Platform)
Platform)
FPU(Floating
FPU(Floating Production
Production Unit)
Unit)
-- Oil
:: 60,000
Oil
60,000 bbl/oil
bbl/oil
-- Gas
Gas :150
:150 MMSCFD
MMSCFD
2001.
2001. 9
9 ~
~ 2003.
2003. 4
4
Korea
Korea
Tokdo
Tokdo Observation
Observation
Offshore
Offshore Platform
Platform Project
Project
India
India
India
India
BCP-A
BCP-A &
& BCP-B
BCP-B Booster
Booster
Compressor
Compressor
Platform
Platform Project
Project
ONGC
ONGC Neelam
Neelam Process
Process Complex
Complex
Project
Project
Main
Main Deck
Deck for
for Accommodation
Accommodation and
and
Laboratory,
Laboratory, Cellar
Cellar Deck
Deck for
for Generator
Generator
1998.11
1998.11 ~
~ 1999.
1999. 5
5
4
4 Legged
Legged Jacket
Jacket (Dia
(Dia 32
32 inch)
inch)
Gas
Gas
:: 30
30 MMSCFD
MMSCFD
Process
Process Platform
Platform ::
-- Oil
:: 128,460
Oil
128,460 BPSD
BPSD
-- Gas
Gas :: 2.56
2.56 MMSCFD
MMSCFD
Water
Water Injection
Injection Platform
Platform :: 229
229 BWPD
BWPD
Well
Well Platform
Platform
76
1997
1997 ~
~ 1999
1999
1992
1992 ~
~ 1994
1994
Thank you