Vous êtes sur la page 1sur 109

POWER TRANSFORMER

PRESENTATION
BY

HITESH KUMAR
MANAGER(T)
PROTECTION
DELHI TRANSCO
LIMITED

POWER TRANSFORMER
Power Transformer 100 MVA,220/6633/11 kV

POWER TRANSFORMER
WHAT IS A TRANSFORMER?
Transformer is a static piece of apparatus by
means of which electric power is transferred from
one circuit to another without change in
frequency. It can raise or lower the voltages with
a corresponding decrease or increase in current.
It
is
accomplished
by
Faradays
law
of
electromagnetic induction. In simplest form, a
transformer consists of two conducting coils
having mutual inductance. The primary winding is
one, which receives electric power from the
supply, and the secondary winding is the one,
which delivers electric power to the load. The
coils are wound on a laminated core of magnetic
material. It operates on the principle of mutual
inductance between the two circuits linked by a
common magnetic flux through a path of low
reluctance.

POWER TRANSFORMER
MAIN COMPONENTS OF
Windings & Tapings (Primary, secondary, tertiary).
TRANSFORMER

Core.
Frame.
Insulation (paper, perma wood, oil).
OLTC (on load tap changer).
Turret CTs
Main tank.
Bushings(condenser/non condenser type).
Cable sealing box.
Oil conservator tank and dehydrating breather.
MOG
Siphon system (alumina).
Diaphragm/ explosion vent.

POWER TRANSFORMER
MAIN COMPONENTS OF
TRANSFORMER
Buchholz relay(above 500 KVA transformer).

OSR (oil surge relay)


PRV/SPR
Cooling system (fans, pumps, radiators).
WTI/OTI

POWER TRANSFORMER
WHY MAINTENANCE ?

HUMAN SAFETY
EQUIPMENT LIFE
COST OF BREAK DOWN
TIME & COST OF REPAIR
RELIABILITY OF SERVICE

POWER TRANSFORMER
WHY MAINTENANCE IS REQUIRED ?
To avoid premature failure.
REASON OF FAILURE OF TRANSFORMERS:
1. Faulty design and construction.
2. Incorrect erection, operation and maintenance.
3. Wear and tear, aging and other deterioration.
4. Accidents
COMPONENTS
AFFECTING
THE
LIFE
OF
TRANSFORMERS:
1. Insulation.
2. Oil.
INSULATION FAILURE DUE TO: Aging ( function of time and temperature).
Oil contamination.
Heating (over voltages/over loading/loose
connections/poor cooling).
High voltage surges (lightning/switching surges).
Mechanical forces due to external faults.

POWER TRANSFORMER
TYPES OF MAINTENANCE:

BREAK DOWN MAINTENANCE


PREVENTIVE MAINTENANCE
CONDITION BASED MAINTENANCE
RELIABILITY CENTRED MAINTENANCE

POWER TRANSFORMER
Maintenance of :

Oil
Core and winding
Bushings
Conservator oil preservation system (COPS) and
magnetic
oil gauge
Dehydrating breather
Buchholz relay
Temperature indicators
Cooling system
OLTC (diverter/selector switch)

POWER TRANSFORMER
Maintenance Schedule (CBIP):
1. Hourly:
1. Ambient temperature
2. Winding temperature 3. Oil temperature
4. Load(Amp) 5.
Voltage
6. Tap Position
1. Daily:
1. Oil Levels 2. Oil Level/colour in bushings
3.
Breather 4. Leakage of water 5.Cooling System
2. Quarterly:1. Bushings. 2 Oil leaks(indoor transformers)

POWER TRANSFORMER
Maintenance Schedule (CBIP):
3.Yearly:
1.Physical check of oil levels.
2. Oil quality (DGA).
3. Cooling system.
4. OLTC.
5. WTI/OTI calibration.
6. Buchholz relay.
7. Protection system.
8. Earth resistance.
9. Tan delta of bushings & windings.
10. PI.
11. Cable boxes, connections.

POWER TRANSFORMER
Maintenance Schedule (CBIP):
4. 10 Yearly:
and coils.
5. 20 Years:

1. Overall inspection of core


1. Life assessment.

POWER TRANSFORMER
Maintenance Schedule (BHEL):
1. Hourly:
1. Amb temp.
2. Winding temp.
3. Oil temp.
4. Load amp/ load voltage.
2. Daily:
1. Oil level in main conservator tank.
2. Oil level in tap changer diverter
switch.
3. oil level in bushings.
4. Pipe and accessories for
leakages.

POWER TRANSFORMER
Maintenance Schedule (BHEL):
3. Monthly:
1. Buchholz relay.
2. Dehydrating breather (silica gel).
3. Leakage of water in to cooler.
4. Quarterly:
1. Bushings.
2. Transformer oil and tap changer oil
(BDV & moisture).
3. Cooling system.
4. OLTC.
5. Dehydrating breather (oil & air
passages).

POWER TRANSFOMER

Maintenance Schedule (BHEL):

5. Yearly:
1. Oil quality (DGA).
2. Cable boxes. 3. Alarms and protection circuit.
4. Oil level in OTI/WTI.
5. Earth strips.
6. Packing gasket of fans.
7. Fan motors.
8. Tank and accessories.
9. Gasket joints.
10. Diverter switch inspection/servicing/oil filtration.
11. Cleaning/ touchup Painting of tank
cover/conservator.
12. Bushing top connections.

POWER TRANSFORMER
Maintenance Schedule (BHEL):
6. Two yearly:
1. Conservator oil preservation system
(COPS) and oil gauge
2. Transformer oil examination as per
IS:1866.
3. Buchholz relay.
7. 7-10 yearly:
1. Transformer and tap changer assembly
(overall
internal inspection including
lifting of core and
coil assembly).

POWER TRANSFORMER
BUCHHOLZ RELAY
Operation depends on nature of fault
1. Minor faults (Alarm):
a) Failure of insulation of core bolts.

b) Over heating.

c) Capacitance discharge to earth.


d) Corona discharge in
bad oil.
e) Release of air from fresh oil, winding, core etc.
2. Major faults (Trip):
a) Short circuit in windings, winding turns, winding taps.
b) Bushing puncture.
c) Open circuit.
3. Mechanical fault (Alarm/Trip):
a) Oil in relay sinks down.

b) Loss of oil, oil

POWER TRANSFORMER
On-Line
Monitoring
1.
DGA to be
monitored on all transformers
periodically. Periodicity depends on the nature
of evaluation of gases.
2. HYDRANE directly mounted on the
transformer and in contact with transformer
oil.
The use of this device is to detect the change
in fault gases, to monitor their evolution. As
an alarm is triggered oil is sampled from the
transformer to evaluate the nature and
severity of the fault.

POWER TRANSFORMER
3. Acoustic PD measurement.
In case DGA results indicate the presence of high
discharges Acoustic PD measurement is done.
Acoustic PD detector consists of sensor which can
sense sound vibrations produced due to occurrence
of discharges in oil.
The sensor has pre-amplifier and filter circuit to
eliminate environmental noise.
4 Infrared thermography
With the help of infrared thermo-vision camera, the
thermo-image of transformer is prepared
This scanning helps in detecting overheated zones,
loose & corroded connection.

POWER TRANSFORMER
LAMINATED CORE

POWER TRANSFORMER
CONDUCTORS

POWER TRANSFORMER
WINDINGS

POWER TRANSFORMER
WINDING

POWER TRANSFORMER

POWER TRANSFORMER
Winding

POWER TRANSFORMER
Complete Core Coil Assembly with OLTCs

POWER TRANSFORMER
CORE COIL ASSEMBLY

POWER TRANSFORMER
CORE & COIL ASSEMBLY

POWER TRANSFORMER
Internal View:

POWER TRANSFORMER
Diverter Switch

POWER TRANSFORMER
Diverter Switch

POWER TRANSFORMER
DIVERTER SWITCH CHAMBER

POWER TRANSFORMER
Selector Switch

POWER TRANSFORMER
OLTC Equalizing Pipes

POWER TRANSFORMER
Bushing CT/ Bushing Bottom Terminal Connection

POWER TRANSFORMER
HV Condenser bushing

POWER TRANSFORMER
Neutral Bushing

POWER TRANSFORMER
LV Bushing

POWER TRANSFORMER
Lead and bus

POWER TRANSFORMER
Frame and Winding

POWER TRANSFORMER
Turret & Turret CT

POWER TRANSFORMER
Turret & Turret CT Terminals

POWER TRANSFORMER
Turret CT.

POWER TRANSFORMER
Turret CT.

POWER TRANSFORMER
OTI with alarm & trip contacts.
trip contacts.

WTI with alarm &

POWER TRANSFORMER
Magnetic oil gauge with low level alarm/trip contact.

POWER TRANSFORMER
Oil Conservator Tank

POWER TRANSFORMER
Silica gel breather

POWER TRANSFORMER
Alumina for Siphon
THERMOSYPHON
Activated Alumina is used
It helps in absorbing acids and gases present in
insulating oil.
Improves oil properties.
Can be re generated at 140-210C
Comprises of
Al2 O3 (Aluminum Oxide)
93%
Na2O3 (Sodium carbonate)
0.7%
Fe2O3 (iron oxide)
0.1%
SiO2
(Silicon dioxide)
0.1%
Loss of ignition
6.0%
(at 1100C)

POWER TRANSFORMER
Magnetic oil gauge with low level alarm contact.

Indicates
oil
level
in
transformer
conservator tank.
Shows relation between temperature &
volume.

POWER TRANSFORMER
Buchholz relay with alarm & trip contacts.

A protective device for oil immersed


transformers.
Provides alarm & trip facility.
Generated gases is collected in this relay
and gives alarm.
Installed generally in transformers of
1600 KVA rating.

POWER TRANSFORMER
Buchholz relay

POWER TRANSFORMER
Buchholz relay

POWER TRANSFORMER
Buchholz relay

POWER TRANSFORMER
Buchholz relay

POWER TRANSFORMER
Buchholz relay

POWER TRANSFORMER
Buchholz relay

POWER TRANSFORMER
Buchholz relay

POWER TRANSFORMER
Sudden pressure relay
Very sensitive safety device.
Provides alarm & trip facility.
Works on the principle of
differential pressure.
Senses rate of change of
pressure
( App. 0.25 kg/cm 20% ,
Fukunda
Instrument co. ).

Transformer trips on
abnormality.
Used in large EHV class
transformers.

POWER TRANSFORMER
Pressure relief valve.

A safety device.
Provides alarm & trip facility.
Releases pressure excess to pre-set value
( 0. 50 0.60 kg/cm ).

Installed in transformers of rating


KVA.

500

POWER TRANSFORMER
Testing of PRV

POWER TRANSFORMER
PRV Testing

POWER TRANSFORMER
Transformer Testing in Work Shop

POWER TRANSFORMER
Impulse Generator

POWER TRANSFORMER
Testing in Work Shop

POWER TRANSFORMER
Transformer Testing in Work Shop

POWER TRANSFORMER
100 MVA/220 66-330/11kV Pr. Tr. (ERECTION)

POWER TRANSFORMER
315 MVA 400/220/33 kV

POWER TRANSFORMER
100 MVA, 220/66-33/11 kV Pr. Tr.

POWER TRANSFORMER
100 MVA 220/66-33/11kV

POWER TRANSFORMER
100MVA 220/66-33/11kV

POWER TRANSFORMER
100 MVA, 220/66-33/11 kV Pr. Tr.

POWER TRANSFORMER
100 MVA 220/66-33/11 kV

POWER TRANSFORMER
100MVA 220/66-33/11kV

POWER TRANSFORMER
100 MVA 220/66-33/11 kV Tr. All LV bushings damaged

POWER TRANSFORMER
100 MVA 220/66-33/11 kV Power Transformer

POWER TRANSFORMER
16 MVA 33/11kV

POWER TRANSFORMER
220 kV Condenser Bushing

POWER TRANSFORMER
16 MVA 33/11 kV Pr. Tr.

POWER TRANSFORMER
16 MVA,33/11 kV Pr. Tr.

POWER TRANSFORMER
Contact Resistance Measurement

POWER TRANSFORMER
16 MVA 33/11kV Pr. Tr. LV winding Ph-N shorted

POWER TRANSFORMER
16 MVA, 33/11kV Pr. Tr.

POWER TRANSFORMER
Internal View of Top of 220 kV Bushing

POWER TRANSFORMER
OSR(Oil Surge Relay)

POWER TRANSFORMER
Oil surge relay for OLTC with trip contact.

POWER TRANSFORMER
Core and Frame

POWER TRANSFORMER
TOP CORE & FRAME ASSEMBLY

POWER TRANSFORMER
TOP CORE & FRAME ASSEMBLY

POWER TRANSFORMER
HV Leads

POWER TRANSFORMER
LV Leads

POWER TRANSFORMER
OLTC TAP CHANGING:
Tap 2

6
5
4
3
2
1

POWER TRANSFORMER
OLTC TAP CHANGING:
Tap 2=>3

6
5
4
3
2
1

POWER TRANSFORMER
OLTC TAP CHANGING:
Tap 2=>3

6
5
4
3
2
1

POWER TRANSFORMER
OLTC TAP CHANGING:
Tap 2=>3

6
5
4
3
2
1

POWER TRANSFORMER
OLTC TAP CHANGING:
Tap 3

6
5
4
3
2
1

POWER TRANSFORMER

POWER TRANSFORMER
Infrared Thermography

POWER TRANSFORMER
Bushing current monitoring

POWER TRANSFORMER
River Crossing: What a beautiful arrangement?

POWER TRANSFORMER
Ohh..

POWER TRANSFORMER
INSULATION MEASUREMENT OF CORE & FRAME

POWER TRANSFORMER
66 KV BUSHING

POWER TRANSFORMER
66-33 KV BUSHING
& LEADS

POWER TRANSFORMER
OLTC ASSEMBLY

POWER TRANSFORMER
11 KV BUSHING &
LEADS

POWER TRANSFORMER
CORE & FRAME

POWER TRANSFORMER
RATIO CHANGING LINKS

POWER TRANSFORMER
COPS

Vous aimerez peut-être aussi