Académique Documents
Professionnel Documents
Culture Documents
Quality Assurance
Under The Guidance : 1) Prof AR Kolhe.
2) Prof Manish Khandare
Presented By : 1) Sanyam Soni
2) Aakash Chopda
3) Manish M. Patil
4) Sanket K Ghadge
Aim
The aim of these project is present the role of
Quality control with its analytical assurance in
such a complex manufacturing process like
building construction.
Contents
ABSTRACT
INTRODUCTION
LITERATURE REVIEW
OBJECTIVES
COMPARISION CHART
ECONOMY STATISTICS
SCHEDULING
LITERATURE REVIEW
REFERENCES
Abstract
Introduction
People are ready to pay a huge amount but are looking forward
for the desired quality in the construction patterns.
Literature review
Sr
No.
Author
Paper
Finding
G. Satyanarayana reddy
Utility of quality
control tool &
statistical process
control
International journal
of review
S. Topolska
Journal of
achievement in
material &
manufacturing
engineering
C. Arum
An international multi
Disciplinary journal
Sandeep mantri
Practical building
construction and its
management
Objectives
Comparison chart
Definiti
on
Focus
on
Goal
Quality
Assurance
Quality Control
Quality Control
The ability to make the same thing the same way, over and over
again
Quality Assurance
Quality Analysis
The construction industry is the second largest industry of the country after
agriculture.
Real Estate is a 8 billion or Rs. 558.94 billion (by revenue) Industry in India.
Real Estate is linked to about 250 ancillary industries like cement, brick and steel
through backward and forward linkages.
The Indian real estate industry is likely to grow from Rs. 490.03
billion in 2005 to Rs. 4,060.24 billion in by 2015.
Scheduling
Analytical details
1.
2.
3.
4.
Deciding
Objectives
Introduction
Collection Of
Technical Papers
Literature
review
Deciding
Parameters
Study And
Analysis Of
Data
Mumbai
Site Visit
Analysis Of
site data
Graphical
representatio
n of site data
Result &
Conclusion
Pune
Methodology
LABOUR PRODUCTIVITY
0.333333
0.2
0.142857
0.25
0.5
0.333333
0.2
0.25
0.5
0.166667
0.333333
0.142857
0.333333
0.25
0.25
0.5
0.2
0.142857
0.25
0.25
0.333333
TOTAL
25
11.36667
19.45
2.235714
14.5
21.83333
5.47619
AVERAGE
0.04
0.029326
0.010283
0.063898
0.017241
0.022901
0.06087
0.034931
3.493111
0.12
0.087977
0.102828
0.089457
0.206897
0.229008
0.045652
0.125974
12.59739
Results
RESULT (AHP)
RESULT (AHP)
37.43
21.21
12.6
3.49
9.82
9.39
6.06
Results
RESULT (AHP)
3.49
21.21
12.6
9.82
6.06
9.39
37.43
CONCLUSION
The second parameter which has the highest weightage and ranking
that is quality control laboratory gives us a true impression that the
quality control of the materials while execution achieves the desired
standards.
But altogether all the parameters are very much important for the
achievement of the quality during the middle stage construction order.