island operation
Monitoring of Key
parameters
during
island operation.
BLACK OUT
Plant Safety
Considerations
Turbine lube oil system
Hydrogen Seal Oil System
RAH and GRF rotation
Condenser pressure
monitoring
Plant SAFETY
CONSIDERATIONS
.We have to protect each equipment at plant
specially Check all running of D.C operated
emergency back up auxiliaries, such as DC
H2 seal oil pump, DC turbine lube oil
pumps
Drain steam lines against water hammering
Note: Confirmation from local is must
Manager operation should himself
check the oil flow from sight glasses and
turbine and RAH turning
Sharing the
responsibilities
Prime considerations in
Black out
IS LAND OPERATION
IS LAND OPERATION
The term Is land operation is used
due to the similarity of same
scenario faced at any Is land in the
ocean, where you have to survived
with out the assistance of rest of the
world and depends on the facilities
available at Is Land for living till the
assistance received from rest of the
world .
I
General Note
In general as per protection logic
units at BQPS1 were not facilitate to
re-synchronized with network after
attaining Is land conditions on dead
bus bar.
Unit no 5 and 6 are now made
available by E/M after modification in
logic, SOP is developed with the
consultation with E/M
which must be reviewed periodically
during normal conditions by
operation staff and officers
Is Land Operation
MONITORING OF
KEY PARAMETERS
DURING IS LAND
OPERATION
Is Land Operation
NCR staff
Case A
Note any protection relays and alarm
operated on protection panel
Coordinate control to stabilized the
system frequency and voltage.
HITAS selector reset to auto or
manual(U1256)
Re synchronized the unit on Is Land.
Turbine Operator.
Observe CV and CRV position and load
variation.
Maintained RH pressure to around 8 bar to
avoid reverse power protection.
Check HP and LP bypass operation, put
control on manual if required, coordinate
with boiler operator regarding drum level
Check and control
HP Heater and LP
Heater level control
from local, open
bypass valve from local if required.
Is Land Operation
NCR
In case of KESC total supply failure
and Units 5 or 6 or both have safe
isolation on ISLAND mode, following
steps will be taken for their safe resynchronization on 220 KV GIS Dead
Bus Bar.
At UNIT 6
Syn.circuit off
Syn.key on manual
P.B (main release) press down on
control panel. Unit 6 will
synchronized on dead bus bar.
At UNIT 5
Syn. Circuit OFF
Syn.Circuit.Key set on Manual (6.6
kv syn.key to be insert) at unit 5
P.B press down ( provided for the
purpose at unit 5),unit no.5 will
synchronized on dead bus bar.
Actions required to
stabilized the unit during Is Land
operation
Case A or B
Boiler operator
Maintained Fuel burner inlet pr to
safe value, Six burner will cut off as
per logic.
Maintained Boiler drum level, put
control on manual if required.
Control Main steam temperature well
Turbine Operator.
Observe CV and CRV position and load
variation.
Maintained RH pressure to around 8 bar to
avoid reverse power protection.
Check HP and LP bypass operation, put
control on manual if required, coordinate
with boiler operator regarding drum level
Check and control
HP Heater and LP
Heater level control
from local, open
bypass valve from local if required.
Actions required at
the units which are
not facing Is Land
operation in case B
total break down
BOILER SIDE
After loss of auxiliary electric power
confirm that RAH is rotating on air motor.
Open Air Heater bypass gas damper and
close Air Heaters inlet gas dampers. If air
supply of RAH drive is lost, rotate Air
Heaters by manual handle operation
(ensure motor breaker racked out)
Open FDF inlet vanes & outlet dampers
for natural draft purging for at least 20
minutes
When auxiliary power is available, put
Air Heaters on electric drive. Close boiler
Turbine Side
Is Land condition
Case B
Energize without delay, the 6.6 KV
emergency bus A3BCA / A3BCB from the
unit which is on Is land operation to ensure
instrument air compressor supply.
When unit on Is land is established and
A3BCA/B fed from unit supply, confirm
opening of 6.6 KV breakers of start up 1
and 2