Preface
This presentation provide operators with an overview of the fuel test requirement for
RIB boom repair. Presentation is issued prior to SB 57-8062/70 issuance and
therefore may be subject to slight changes.
It is not intended to provide a complete guide or instruction, moreover a quick and
simple familiarisation of the fuel system tests.
Detailed test instruction are available in the AMM tasks referenced in this
presentation or will be detailed in SB 57-8062/70.
Page 2
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
November 2012
Agenda:
1. Background
2. Fuel pressure tests
3. Air Pressure tests
4. Overflow test
5. Visual inspection
6. Summary
Page 3
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
November 2012
1.BACKGROUND:
Fuel System removal for RBR access:
1.Refuel/Transfer galleries All pipes in the RIB repair area.
2.Feed system All pipes in the RIB repair area.
3.Venting system Pipes removal minimised as follow, to optimised fuel test:
Mid Tank between RIB 17-18
Outer Tank between RIB 36-40
Feed tank 2(3) between RIB 2-7
Page 4
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
November 2012
Page 5
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
November 2012
Line to be
Tested
Diffuser replaced by
Blanking Cap for
Test.
FUEL FEED
LINE
Page 6
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
FUEL/OIL Heat
Exchanger
November 2012
Page 7
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Page 8
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
November 2012
November 2012
-Access at RIB 14
-Access for repair difficult.
-Appropriate standard tools to be
used(offsets, short drills & long drills)
Page 9
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
November 2012
Blanking
caps-RIB 2
Vent gallery from FT3 connected to MID, INR and Surge tanks
Alternate test defined to avoid extra maintenance in other tanks (MID, INR and Surge)
Test Procedure defined in SB57-8065:
Free flow test Confirm no partial or complete blockage in the line.
Air pressure test Confirm sealing assembly.
Tool provided in kit P/N:98L28004034000
No overflow required from this tank.
Page 10
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
November 2012
Page 11
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
November 2012
te
Ou
k
an
tT
n
Ve
Page 12
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
k
an
T
r
ank
eT
g
r
Su
1(4
November 2012
-Source of light in
the surge tank by a
torch
e
Fe
te
Ou
k
an
tT
n
Ve
Page 13
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
k
an
T
r
ank
eT
g
r
Su
nk
Ta
1(4
November 2012
SB/FUEL TEST-Summary
Page 14
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Use Tab 'Insert - Header & Footer' for Presentation Title - Siglum - Reference
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS S.A.S. No intellectual property rights are granted by the
delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS S.A.S. This document and its content shall not be
used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting
grounds for these statements are not shown, AIRBUS S.A.S. will be pleased to explain the basis thereof.
AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks.
Page 15
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Month 200X