Académique Documents
Professionnel Documents
Culture Documents
Construction
Delivery
Self-leveling Concepts
Screed Response versus Distance
Forces Acting on a Screed
Construction
Delivery
Construction
Construction
Delivery
1 inch movement
at Tow Point
Construction
Delivery
Direction of Paving
63%
87%
96%
Screed Path
98%
1L
2L
3L
4L
99%
Tow Point Path
5L
6L
Delivery
Delivery
Construction
Delivery
Screed Depth
Crank
F3
Tow Point
Pivot Point
F2
F1
Construction
Delivery
Construction
Delivery
10
Correct
Elevation
Construction
Auger
Overloaded
Delivery
Auger
Underloaded
11
Travel
Angle of Attack
Construction
Delivery
12
Construction
Delivery
13
Construction
Delivery
14
Ridability
Noticeable pavement defects that destroy
smoothness are caused by
Stop and Go Operation
Transverse Joint Construction
To avoid these irregularities
Keep the paver moving
Pick up trucks on the run
Adjust paver speed to match the mix arrival rate
Keep a uniform head of material
Take time to make good
Construction
Delivery transverse joints
15
Construction
Delivery
16
Construction
Delivery
17
Construction
Delivery
18
Pavement Profile
Direction of Paving
Construction
Delivery
19
Direction of Paving
63%
87%
96%
Screed Path
98%
1L
2L
3L
4L
99%
Tow Point Path
5L
6L
Delivery
20
Construction
Delivery
21
Screed Compaction
Screed With Tamping bar
Moved up and down 4mm at a rate of 1500
tamps per minute
Construction
Delivery
22
Construction
Delivery
23
Screed Compaction
Vibrating Screed
Consists of a curved, trough-shaped plate
that has an electric vibrator (3600 vpm with
a few thousands of an inch amplitude)
Construction
Delivery
24
Screed Compaction
Vibratory Screed with Strike-Off Plate
Construction
Delivery
25
Screed Heaters
Heating the screed plate to 150C
Ensures that the first material placed does
not stick to the screed plate and tear, giving
mat a rough texture
Crown Control
Assist in draining rainfall off the road surface
adjust a turnbuckle device to flex the bottom
of the screed
Construction
Delivery
26
Screed Extensions
Basic width of the paver : 2.4 m or 3.0m
Paving width can be extended
Rigid Screed Extensions
Hydraulically-operated Screed Extensions
Hydraulically extendible screed are more
economical
Surface texture is different and density is
lower under the screed extension than the
basic screed unit
Construction
Delivery
27
Construction
Delivery
28
Construction
29
Grade sensors
Longitudinal Grade Sensor
Transverse cross slope Device
Dual Grade Sensors
Construction
Delivery
30
Stringlines
Delivery
31
Construction
Delivery
32
Construction
Delivery
33
Delivery
34
Balancing Production
HMA
Facility
Paving
Trucking
Construction
Compaction
Delivery
35