Vous êtes sur la page 1sur 23

Flare

RH

RH

Initial state

SSV
MOV
04-05

DHSVs

MOV 15-07

W#1

ES
D

MOV 010

ESDV
12-11

ESDV 008

V0

MOV 011

09

MOV 012

FT

GOV
113

MOV 08

Pigs

W#2

Flares Phase #2

MOV 013

SEA-LINE # 1

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10

WP1

Piggy back line

RH
Slug Catcher #1
with N2
Line full of fresh water

Line full of MEG

Spool to remove to
connecting
fire water hose
(pushing to WP2)

Piggy back line

Spool to remove
for connecting
dumping line

Position A dedicated
to change block valve
by globe valve
(to control pig velocity)

sea
RH

Dumping line

102-T-102
lean MEG

Network fire water

MOV
04-05

12

ESDV
12-11

MOV 15-07

W#1

Glicol
&
Condensate
Train #1&2

Glicol
&
Condensate
Train # 3&4

MOV 012
RH

MOV 010

Balance line

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

12

SEA-LINE #2

MOV 08

FT

W#2

MOV 013

Gas to
Train # 3&4

BDV 09

Piggy back line

RH

Flare

Slug Catcher #2
with N2

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 1 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Flare

Lining-up WP
1&2
and Phase 2

RH

MOV
04-05

RH

MOV 15-07

ES
D

MOV 010

ESDV
12-11

ESDV 008

V0

MOV 011

09

MOV 012

W#1
FT

GOV
113

MOV 08

Pigs

W#2

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

Lining-up PSVs
and BDV 09s
RH
Slug Catcher

102-T-102
lean MEG

Spool to remove to
connecting
fire water hose
(pushing to WP2)

Balance line

WP1

Flares Phase #2

MOV 013

Network fire water

Glicol
&
Condensate
Train #1&2

Valve A changed
to control pig velocity

sea

RH
MOV
04-05

12

Glicol
&
Condensate
Train # 3&4

MOV 012

RH

Dumping line

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

W#1
MOV 08

FT

W#2

MOV 013

Gas to
Train # 3&4

BDV 09

Piggy back line

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 2 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Flare

RH

MOV
04-05

ESDV
12-11

MOV 15-07

W#1

To assemble Portable US
Flow meter
0.02 m/s

Launching
First pig
with 800 m3
fresh water

RH

ES
D

MOV 010
ESDV 008

V0

MOV 011

09

MOV 012

FT

GOV
113

MOV 08

Pigs

W#2

Flares Phase #2

MOV 013

25 m3/h

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10

WP1

Piggy back line

RH
Slug Catcher
Start pumps

102-T-102
lean MEG

Spool to remove to
connecting
fire water hose
(pushing to WP2)

Balance line

Network fire water

Glicol
&
Condensate
Train #1 &2

With valve A controling


pig velocity 30 m3h.

sea

RH
MOV
04-05

12

Glicol
&
Condensate
Train # 3&4

MOV 012

RH

Dumping line

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

W#1
MOV 08

FT

W#2

MOV 013

Gas to
Train # 3&4

BDV 09

Piggy back line

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 3 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Flare

RH

MOV
04-05

ESDV
12-11

MOV 15-07

W#1

Portable US
Flow meter
0.02 m/s

Launching
Second pig
with 50 m3
of MEG

RH

ES
D

MOV 010
ESDV 008

V0

MOV 011

09

MOV 012

MEG
MOV 08

FT

W#2

Flares Phase #2

MOV 013

25 m3/h
FRESH WATER

SEA WATER

GOV
113

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH
Slug Catcher

102-T-102
lean MEG

Spool to remove to
connecting
fire water hose
(pushing to WP2)

Balance line

WP1

Network fire water

Glicol
&
Condensate
Train #1 &2

With valve A controling


pig velocity 30 m3h.

sea

RH
MOV
04-05

12

Glicol
&
Condensate
Train # 3&4

MOV 012

RH

Dumping line

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

W#1
MOV 08

FT

W#2

MOV 013

Gas to
Train # 3&4

BDV 09

Piggy back line

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 4 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Flare
ignited with C3

Lining-up
WP1
& Phase 2
and ignition
flares

RH

MOV
04-05

ESDV
12-11

MOV 15-07

W#1

Portable US
Flow meter
0.02 m/s
RH

ES
D

MOV 010
ESDV 008

V0

MOV 011

09

MOV 012
MOV 013

MOV 08

FT

W#2

MEG

FRESH WATER

SEA WATER

GOV
113

Flares Phase #2
ignited with C3
Flares Phase #3
ignited with C3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10

WP1

Piggy back line

RH
Slug Catcher
Pumps stopped

102-T-102
lean MEG

Spool to remove to
connecting
fire water hose
(pushing to WP2)

Balance line

Network fire water

Glicol
&
Condensate
Train #1 &2

Valve A closed

sea

RH
MOV
04-05

12

Glicol
&
Condensate
Train # 3&4

MOV 012

RH

Dumping line

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

W#1
MOV 08

FT

W#2

MOV 013

Gas to
Train # 3&4

BDV 09

Piggy back line

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 5 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Step #1-Production of first well Step #2-Production of second well


througt test separator
througt test separator.
and first well to sea line
Gas and cond. flow-rates are read
Flare
ignited with C3

RH

MOV
04-05

ESDV
12-11

MOV 15-07

Portable US
Flow meter
0.02 m/s

Third pig
pushing with
well gas from
WP1

RH

ES
D

MOV 010
ESDV 008

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013
MEG

GAS

GOV
113

FRESH WATER

MOV 08

FT

W#2

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

P 10 Barg

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH
Slug Catcher

Adjustment of choke-valves

102-T-102
lean MEG

Spool to remove to
connecting
fire water hose
(pushing to WP2)

Balance line

WP1

Network fire water

Glicol
&
Condensate
Train #1 &2

Open Valve A again


to control pig velocity

sea

RH
MOV
04-05

12

Glicol
&
Condensate
Train # 3&4

MOV 012

RH

Dumping line

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

W#1
MOV 08

FT

W#2

BDV 09

Piggy back line

MOV 013

P 10 Barg

Gas to
Train # 3&4

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 6 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

To take samplers
and to check if water
is not concentrated with salts
Flare
ignited with C3

Arrival of
first pig

RH

MOV
04-05

RH

MOV 15-07

W#1

ES
D

MOV 010

ESDV
12-11

ESDV 008

V0

MOV 011

09

MOV 012

GAS

GOV
113

MEG

MOV 08

FT

W#2

Flares Phase #2

MOV 013

1800 m3/h

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH
Slug Catcher

102-T-102
lean MEG

Spool to remove to
connecting
fire water hose
(pushing to WP2)

Balance line

WP1

Network fire water

Glicol
&
Condensate
Train #1 &2

Close Valve A

sea

RH
MOV
04-05

12

Glicol
&
Condensate
Train # 3&4

MOV 012

RH

Dumping line

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

W#1
MOV 08

FT

W#2

MOV 013

Gas to
Train # 3&4

BDV 09

Piggy back line

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 7 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

To take samplers
and to check if water
is not concentrated with salts

Close well #1&2


Flare
ignited with C3

Removal first
pig

RH

MOV
04-05

RH

MOV 15-07

ES
D

MOV 010

ESDV
12-11

ESDV 008

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013
GAS

GOV
113

MEG

MOV 08

FT

W#2

Gas to
Train # 1&2

Vent pig receiving

P 10 Barg

BDV 09

Flares Phase #3

ESDV MOV
114 116 117

ESDV 13
ESDV 10
Piggy back line

RH
Slug Catcher

102-T-102
lean MEG

Spool to remove to
connecting
fire water hose
(pushing to WP2)

Valve A Closed
RH

Dumping line

Network fire water

RH
MOV
04-05

12

ESDV
12-11

MOV 15-07

Glicol
&
Condensate
Train #1 &2

Glicol
&
Condensate
Train # 3&4

MOV 012

sea
MOV 010

Balance line

WP1

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

W#1
MOV 08

FT

W#2

BDV 09

Piggy back line

MOV 013

P 10 Barg

Gas to
Train # 3&4

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 8 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Flare
ignited with C3

Arrival
second and
third pig

RH

Opened
MOV
04-05

RH

MOV 15-07

W#1

ES
D

MOV 010

ESDV
12-11

ESDV 008

V0

MOV 011

09

MOV 012

GOV
113

GAS + condensate
MOV 08

FT

W#2

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

Fresh water
+ MEG

RH
Slug Catcher

102-T-102
lean MEG

Spool to remove to
connecting
fire water hose
(pushing to WP2)

Balance line

WP1

Flares Phase #2

MOV 013

1800 m3/h

Network fire water

Glicol
&
Condensate
Train #1 &2

Close valve A when


arrival pigs

sea

RH
MOV
04-05

12

Glicol
&
Condensate
Train # 3&4

MOV 012

RH

Dumping line

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

W#1
MOV 08

FT

W#2

MOV 013

Gas to
Train # 3&4

BDV 09

Piggy back line

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 9 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Close well #1&2


Flare
ignited with C3

RH

MOV
04-05

ESDV
12-11

MOV 15-07

Removal second and


third pig
Pressurization Slug
MOV 010
Catcher 1
ESDV 008

RH
Open Full flow to slug
catcher 1
ES
D

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013
GOV
113

GAS + condensate
MOV 08

FT

Flares Phase #3

ESDV MOV
114 116 117
Open and venting

W#2

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10

WP1

Piggy back line

RH
Slug Catcher
Routed MEG and
water to regeneration unit

102-T-102
lean MEG

Spool to remove to
connecting
fire water hose
(pushing to WP2)

Balance line

Network fire water

Glicol
&
Condensate
Train #1 &2

Valve A closed

sea

RH
MOV
04-05

12

Glicol
&
Condensate
Train # 3&4

MOV 012

RH

Dumping line

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

W#1
MOV 08

FT

W#2

MOV 013

Gas to
Train # 3&4

BDV 09

Piggy back line

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 10 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Open well
Flare
ignited with C3

Pressurization
slug catcher 2

RH

MOV
04-05

RH

Open Full flow to slug


catcher 1

W#1

ES
D

MOV 010

ESDV
12-11

MOV 15-07

Open to
Slug Catcher 2

ESDV 008

V0

MOV 011

09

MOV 012

MOV 08

W#2

Flares Phase #3

ESDV MOV
114 116 117

GOV
113

GAS + condensate
FT

Flares Phase #2

MOV 013

1800 m3/h

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH
Slug Catcher

102-T-102
lean MEG

Spool to remove to
connecting
fire water hose
(pushing to WP2)

Balance line

WP1

Network fire water

Glicol
&
Condensate
Train #1 &2

Valve A closed

sea

RH
MOV
04-05

12

Glicol
&
Condensate
Train # 3&4

MOV 012

RH

Dumping line

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011
Routed MEG and
water to regeneration unit

W#1
MOV 08

FT

W#2

MOV 013

Gas to
Train # 3&4

BDV 09

Piggy back line

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 11 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Flare
ignited with C3

End of WP1 dewatering

RH

MOV
04-05

RH

Opened Full flow to slug


catcher 1
ES
D

MOV 010

ESDV
12-11

MOV 15-07

Open full to
Slug Catcher 2

ESDV 008

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013

MOV 08

FT

W#2

Flares Phase #3

ESDV MOV
114 116 117

GOV
113

GAS + condensate

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH
Slug Catcher

102-T-102
lean MEG

Spool to remove to
connecting
fire water hose
(pushing to WP2)

Network fire water

RH
12

Glicol
&
Condensate
Train # 3&4

MOV 012

RH

sea
MOV
04-05

Glicol
&
Condensate
Train #1 &2

Open Balance
lines

Valve A closed
Dumping line

Condensate+MEG

Balance line

WP1

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

W#1
MOV 08

FT

W#2

MOV 013

Gas to
Train # 3&4

BDV 09

Piggy back line

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 12 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Flare
ignited with C3

Initial State
de-watering WP2

RH

MOV
04-05

RH

MOV 15-07

ES
D

MOV 010

ESDV
12-11

ESDV 008

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013
GOV
113

GAS + condensate
MOV 08

FT

W#2

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH

Slug Catcher
in service

Condensate+MEG

102-T-102
lean MEG
Balance line

WP1

Full of fresh water

Network fire water

Glicol
&
Condensate
Train #1 &2

Hose connected

sea

RH
MOV
04-05

12

To assemble Portable US
Flow meter
ESDV
12-11

MOV 15-07

W#1

MOV 010
ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

Sea water treated

MOV 08

FT

W#2

Flare
ignited

Glicol
&
Condensate
Train # 3&4

MOV 012

RH

Dumping line

3
Inyection of colorant

BDV 09

Piggy back line

MOV 013
Gas to
Train # 3&4

Prepare mechanism to
push pigs

RH

WP2

Note: Valve in black, closed


Pump in black, stopped

TOTAL SOUTH PARS

Page 13 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Flare
ignited with C3

Portable US
Flow meter
0.02 m/s

Launch of first
pig

RH

MOV
04-05

RH

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
D

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013
GOV
113

GAS + condensate
MOV 08

FT

W#2

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH

Slug Catcher
in service

102-T-102
lean MEG

Full of fresh water


Injection 1000 m3 of
desalinated water
with pig #1

To control velocity
2 m/seg

sea
MOV
04-05

12

Glicol
&
Condensate
Train #1 &2

Glicol
&
Condensate
Train #3&4

MOV 012

RH

Dumping line

Condensate+MEG

Balance line

WP1

ESDV
12-11

MOV 15-07

W#1

RH

Portable US
Flow meter
0.2 m/s

MOV 010
ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

Sea water treated

MOV 08

FT

W#2

MOV 013

Gas to
Train #3&4

BDV 09

Piggy back line

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 14 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Flare
ignited with C3

Portable US
Flow meter
0.02 m/s

Launch of second
pig

RH

MOV
04-05

RH

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
D

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013
GOV
113

GAS + condensate
MOV 08

FT

W#2

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH

Slug Catcher
in service

102-T-102
lean MEG

Full of fresh water


Injection 1000 m3 of
desalinated water
with pig #1

To control velocity
2 m/seg

sea

RH
MOV
04-05

12

Glicol
&
Condensate
Train #1 &2

Glicol
&
Condensate
Train #3&4

MOV 012

RH

Dumping line

Condensate+MEG

Balance line

WP1

ESDV
12-11

MOV 15-07

W#1

Portable US
Flow meter
0.2 m/s

MOV 010
ESDV 008

ES
DV
009

GOV
Fresh water 213

ESDV MOV
214 216 217

MOV 011

Sea water treated

MOV 08

FT

W#2

Sea water

MOV 013

Gas to
Train #3&4

BDV 09

Piggy back line

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 15 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Flare
ignited with C3

Portable US
Flow meter
0.02 m/s

Launch of third
pig with gas

RH

MOV
04-05

RH

MOV 15-07

ES
D

MOV 010

ESDV
12-11

ESDV 008

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013
GOV
113

GAS + condensate
MOV 08

FT

W#2

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH

Slug Catcher
in service

102-T-102
lean MEG

2
Full of fresh water

Injection 1000 m3 of
desalinated water
with pig #1

To control velocity
2 m/seg

Condensate+MEG

Balance line

WP1

Glicol
&
Condensate
Train #1 &2

First, open by pass


Second, open MOV

Place back the spool

RH

Dumping line
sea

RH
MOV
04-05

12

Glicol
&
Condensate
Train #3&4

MOV 012
open

ESDV
12-11

MOV 15-07

Portable US
Flow meter
0.2 m/s

MOV 010
ESDV 008

ES
DV
009

GOV
Fresh water 213

ESDV MOV
214 216 217

MOV 011

W#1
Sea water
MOV 08

FT

W#2

Fresh water

MOV 013

Gas to
Train #3&4

BDV 09

Piggy back line

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 16 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Portable US
Flow meter
0.02 m/s
Flare
ignited with C3

RH

RH

Arrival first pig

MOV
04-05

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
D

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013
GOV
113

GAS + condensate
MOV 08

FT

W#2

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH

Slug Catcher
in service

Condensate+MEG

102-T-102
lean MEG
Balance line

WP1

Full of fresh water


Injection 1000 m3 of
desalinated water
with pig #1
Close

Glicol
&
Condensate
Train #1 &2

Analyses of salt

sea

RH
MOV
04-05

12

Glicol
&
Condensate
Train #3&4

MOV 012

RH

Dumping line

ESDV
12-11

MOV 15-07

Portable US
Flow meter
0.2 m/s

MOV 010
ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

W#1
Fresh water
MOV 08

FT

W#2

Fresh water

gas

MOV 013

Gas to
Train #3&4

BDV 09
Looking colorant by
sampling
Piggy back line

RH
Open line

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 17 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Flare
ignited with C3

Portable US
Flow meter
0.02 m/s

Injection 50 m3 of
MEG

RH

MOV
04-05

MOV 010

ESDV
12-11

MOV 15-07

RH

ES
D

ESDV 008

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013
GOV
113

GAS + condensate
MOV 08

FT

W#2

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH

Slug Catcher
in service

Condensate+MEG

102-T-102
lean MEG
Balance line

WP1

Injection 1000 m3 of
desalinated water
with pig #1

Start pumps

Glicol
&
Condensate
Train #1 &2

To make sure position


pig for push
To assemble original spool

Open and controlling velocity

RH

RH
MOV
04-05

12

ESDV
12-11

MOV 15-07

Portable US
Flow meter
0.2 m/s

MOV 010

Glicol
&
Condensate
Train #3&4

MOV 012

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

W#1
Fresh water
MOV 08

FT

W#2

Fresh water

gas

MOV 013

Gas to
Train #3&4

BDV 09

Piggy back line

RH
Open line

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 18 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Flare
ignited with C3

Portable US
Flow meter
0.02 m/s

Push with gas the


3 pigs

RH

MOV
04-05

MOV 010

ESDV
12-11

MOV 15-07

RH

ESDV 008

ES
D

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013
GOV
113

GAS + condensate
MOV 08

FT

W#2

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH

Slug Catcher
in service

Condensate+MEG

102-T-102
lean MEG
Balance line

WP1

Injection 1000 m3 of
desalinated water
with pig #1

Stop pumps

Glicol
&
Condensate
Train #1 &2

Open wells

RH
MOV
04-05

12

Glicol
&
Condensate
Train #3&4

MOV 012

RH

ESDV
12-11

MOV 15-07

Portable US
Flow meter
0.2 m/s

MOV 010
ESDV 008

ES
DV
009

GOV
Fresh water 213

ESDV MOV
214 216 217

MOV 011

W#1
gas
MOV 08

FT

W#2

Fresh water

MOV 013

Gas to
Train #3&4

BDV 09

Piggy back line

RH
Close line

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 19 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Portable US
Flow meter
0.02 m/s
Flare
ignited with C3

RH

RH

Arrival fist pig

MOV
04-05

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
D

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013
GOV
113

GAS + condensate
MOV 08

FT

W#2

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH

Slug Catcher
in service

Condensate+MEG

102-T-102
lean MEG
Balance line

WP1

Injection 1000 m3 of
desalinated water
with pig #1

Glicol
&
Condensate
Train #1 &2

Open wells

RH
MOV
04-05

12

Glicol
&
Condensate
Train #3&4

MOV 012

RH

ESDV
12-11

MOV 15-07

Portable US
Flow meter
0.2 m/s

MOV 010
ESDV 008

ES
DV
009

GOV
Fresh water 213

ESDV MOV
214 216 217

MOV 011

W#1
gas
MOV 08

FT

W#2

Fresh water

MOV 013

Gas to
Train #3&4

BDV 09

Piggy back line

RH
Close line

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 20 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Portable US
Flow meter
0.02 m/s
Flare
ignited with C3

RH

RH

Removal fist pig

MOV
04-05

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
D

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013
GOV
113

GAS + condensate
MOV 08

FT

W#2

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH

Slug Catcher
in service

Condensate+MEG

102-T-102
lean MEG
Balance line

WP1

Injection 1000 m3 of
desalinated water
with pig #1

Stop pumps

Glicol
&
Condensate
Train #1 &2

Close wells

RH
MOV
04-05

12

Glicol
&
Condensate
Train #3&4

MOV 012

RH

ESDV
12-11

MOV 15-07

Portable US
Flow meter
0.2 m/s

MOV 010
ESDV 008

ES
DV
009

GOV
Fresh water 213

ESDV MOV
214 216 217

MOV 011

W#1
gas
MOV 08

FT

W#2

Fresh water

MOV 013

Gas to
Train #3&4

BDV 09

Piggy back line

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 21 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Flare
ignited with C3

Portable US
Flow meter
0.02 m/s

Removal second
& third pig

RH

MOV
04-05

RH

MOV 15-07

ES
D

MOV 010

ESDV
12-11

ESDV 008

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013
GOV
113

GAS + condensate
MOV 08

FT

W#2

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH

Slug Catcher
in service

Condensate+MEG

102-T-102
lean MEG
Balance line

WP1

Injection 1000 m3 of
desalinated water
with pig #1

Stop pumps

Glicol
&
Condensate
Train #1 &2

Close wells

RH

Valve to changer

RH
MOV
04-05

12

ESDV
12-11

MOV 15-07

Portable US
Flow meter
0.2 m/s

MOV 010

Glicol
&
Condensate
Train #3&4

MOV 012

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

W#1
Gas + condensate
MOV 08

FT

W#2

MOV 013

Gas to
Train #3&4

BDV 09

Piggy back line

RH

Flare

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 22 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Flare
ignited with C3

RH

Final state

MOV
04-05

RH

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
D

V0

MOV 011

09

MOV 012

W#1

Flares Phase #2

MOV 013
GOV
113

GAS + condensate
MOV 08

FT

W#2

Flares Phase #3

ESDV MOV
114 116 117

Gas to
Train # 1&2

BDV 09
ESDV 13
ESDV 10
Piggy back line

RH

Slug Catcher
in service

Condensate+MEG

102-T-102
lean MEG
Balance line

WP1

Stop pumps

Glicol
&
Condensate
Train #1 &2

Wells opened

RH
MOV
04-05

Glicol
&
Condensate
Train #3&4

MOV 012

RH

MOV 010

ESDV
12-11

MOV 15-07

ESDV 008

ES
DV
009

GOV
213

ESDV MOV
214 216 217

MOV 011

W#1
Gas + condensate
MOV 08

FT

W#2

MOV 013

Gas to
Train #3&4

BDV 09

Piggy back line

RH

Flare

Slug Catcher
in service

WP2
Note: Valve in black, closed
Pump in black, stopped

TOTAL SOUTH PARS

Page 23 of 23

De-watering sea lines WP #1&2


August2K-Carlos Herrera-Rev 1

Vous aimerez peut-être aussi