Vous êtes sur la page 1sur 31

Rotable

Management
Jens Schneberg
Solution Architect MRO/M&E

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 1 Jens Schoeneberg (E2)

Content

Rotable Management in Aerospace

SAP Solution

SAP Future Focus

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 2 Jens Schoeneberg (E2)

Content

Rotable Management in Aerospace

SAP Solution

SAP Future Focus

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 3 Jens Schoeneberg (E2)

What is a Rotable?

Repairable Part
Serialized
Long Life Cycle
Expensive Components
Big / Complex Components
Life Limit Controlled

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 4 Jens Schoeneberg (E2)

Rotable Management Cycle


Aircraft

Stock
Procurement

Scrapping
Serviceable

Unserviceable

In-house Repair

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 5 Jens Schoeneberg (E2)

Subcontracting

Scenarios with/without Intermediate Storage


Open-loop scenario
Technical
object

Part(s)

Part(s)
Warehouse

Replacement
part(s)

Part(s)

Closed-loop scenario
Technical
object

Part(s)

Repair
process

Part(s)

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 6 Jens Schoeneberg (E2)

Repair
process

Rotable Management Requirements


Support of maintenance/repair processes

In-house

Subcontracting

Documentation of all maintenance tasks performed


Traceability of rotable parts back to birth

Inventory

Configuration (production site)

Repair shop (shop floor) / Subcontractor

Handling of rotable part status

Tracking of rotable part conditions

Part number change due to modification

Handling of exchange parts from subcontractors

Valuation according to parts condition

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 7 Jens Schoeneberg (E2)

Business
related

Aviation
Authority
related

Content

Rotable Management in Aerospace

SAP Solution

SAP Future Focus

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 8 Jens Schoeneberg (E2)

As-Maintained Configuration

Functional
location

Technical
objects
Equipment/
Serial
number

Assembly

Material

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 9 Jens Schoeneberg (E2)

Serial Number and Equipment

Equipment master record

Material E-2002
Serial data

Serial number 1351

Stock information
Serial number history

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 10 Jens Schoeneberg (E2)

Rotable Exchange Process

Removal of part

Shipment of part

Workshop /
Subcontractor

Warehouse

Replacement part

(1) Rotable exchange


process

Return of serviced part

(2) Repair process

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 11 Jens Schoeneberg (E2)

Life Controlled Rotables I


Technical Object
Chracteristics of
Classification System

Counter

Flight Hours
Take-offs/Landings

Counter
Reading
Flight hours 2351

Counter
Reading
Landings 511

Input Sources:
- Manually via R/3
- Intranet/Internet
- PM-PCS Interface

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 12 Jens Schoeneberg (E2)

Life Controlled Rotables II

Aeroplane counter

Landing gear counter for tires


12/02.

20 Take-offs/landings

20/02.

30 Take-offs/landings

12.02.

350 Take-offs/landings

20.02.

360 Take-offs/landings

Difference of 10
take-offs/landings
carried forward

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 13 Jens Schoeneberg (E2)

Rotable Exchange
Update on
Flight Hours

Life
Contolled
Rotable

Rotable
Maintenance
Plan R/3
Pump P111

Aircraft Configuration
P111

1 4 5 3 Hours

Automatic
creation

PM/CS
PM/CS
Order
Order

Discrepancy
found
Manual
creation

PM/CS
Notification

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 14 Jens Schoeneberg (E2)

Trigger/Initiate
Rotable
Exchange

Traceability of Rotable within As-Maintained


Configuration
G-BIKA

01. 0
n
o
i
t
lla
Insta

Rem
oval
20.

3.98

Usage list

01.03. - 20.09.98 G-BIKA


01.03. - 20.09.98 G-BIKA

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 15 Jens Schoeneberg (E2)

09.9

Rotable Traceability witin Inventory

Purchasing

Ser No.-1
New

Subcontractor
Ser No.-1

New

Ser. No. 1
Unserviceable

Shipping

In-house

Ser No. 1

Ser. No. 1

Ser No. 1
Serviceable

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 16 Jens Schoeneberg (E2)

Receipt

Valuation Based on Parts Condition

Material
with valuation type A
(condition-based
valuation)

Valuation type
NEW
$ 3,000.00

Valuation type
SERVICE
$ 2,200.00

Valuation type
UNSERVICE
$ 1,280.00

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 17 Jens Schoeneberg (E2)

In-house Repair Process

Removal of part

Shipment of part

In-house
Workshop

Warehouse

Replacement part

(1) Rotable exchange


process

Return of serviced part

(2) In-house repair


process

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 18 Jens Schoeneberg (E2)

Refurbishment Order
Goods issue
with movement
type 261

Stock
Plant 0001
SLoc 0002

Maintenance order 800175


Order type:
PM04
Material
Quantity 3
Serial number
From
To

P-2001 Fuel pump

UNSERVICE

53, 81, 27

UNSERVICE
Plant:0001

SLoc: 0002

SERVICE
Plant: 0001

SLoc: 0001
Goods receipt
with movement
type 101

SLoc = Storage location


2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 19 Jens Schoeneberg (E2)

SERVICE

Stock
Plant 0001
SLoc 0001

EnjoySAP - Refurbishment
Automatic change of valuation type during goods movement
Stock
Stock

Material
P-2001
Serial number 53

UNSERVICE

Stock
Stock

SERVICE

Plant
1000
Storage location
0002
Batch
UNSERVICE

Material
P-2001
Serial number 53
Plant
1000
Storage location
0001
Batch
SERVICE

Proposal of serial numbers during goods issue


Refurbishment
Refurbishment
order
order
Object list:
- Serial number 1
- Serial number 2
- Serial number 3

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 20 Jens Schoeneberg (E2)

Goods
Goods
issue
issue
Object list:
- Serial number 1
- Serial number 2
- Serial number 3

Subcontracting Process

Removal of part

Shipment of part

Subcontractor

Warehouse

Replacement part

(1) Rotable exchange


process

Return of serviced part

(2) Subcontracting
process
New with
IS A&D 4.6

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 21 Jens Schoeneberg (E2)

Purchase Order for Subcontracting

MRO Provider

Subcontractor
+

Purchase Order
10 L

1pc DISC SerNr 47


1pc DISC SerNr 47
2pc BLADE

DISC Serial Number 47


2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 22 Jens Schoeneberg (E2)

Part that will be receipt back


Parts that will be provided
to the subcontractor

Picking, Packing, Shipping

xxxxxxxxxxxx
xxxxxxxxxx
xxxxxxxxxx
xxxxxxxxx

xxxxxxxxxxxx
xxxxxxxxxx
xxxxxxxxxxxxx
xxxxxxxxx

Warehouse

Purchase order
Subcontracting
DISC
1pc
BLADE 2pc

SC inventory monitor
DISC
BLADE

(1) Create SD
delivery
(2) Post goods
issue for P/O

SC vendor SUBC1
SC = Subcontracting

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 23 Jens Schoeneberg (E2)

Vendor
stock

Goods Receipt

SC vendor
Comp.: DISC
Goods receipt
of rotable

Purch. Order
history

1) Goods receipt for the


serviced rotable
2) Component consumption

Warehouse
SC = Subcontracting
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 24 Jens Schoeneberg (E2)

Goods Receipt
Consumption of
parts from
SC vendor stock

Goods receipt of
servicable parts
Part number change
Serial Number change
Valuation change

Three scenarios are supported at the time of the goods receipt:

Rotable with the same material and serial number is received

Material number of rotable changes (due to upgrade), but serial number remains the
same

Subcontractor sends back replacement part, with different serial number

The new parts condition might require a valuation change


For traceability reasons, the history for a specific serial number must be complete

SC = Subcontracting
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 25 Jens Schoeneberg (E2)

Warranty Assignment

Tail G-BIKA
Valid from 5.1.1998

Master warranty
Description
Warranty services
Warranty counter

Measuring point:
Flight hours
Cycles

Assignment
Tail C-678
Valid from 12.10.1998
Measuring point:
Flight hours
Cycles

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 26 Jens Schoeneberg (E2)

Content

Rotable Management in Aerospace

SAP Solution

SAP Future Focus

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 27 Jens Schoeneberg (E2)

EnjoySAP - Rotable Exchange Process


Easy-to-use transaction for exchange of
rotable part during line maintenance

Removal of part

Supported functions

Creation of PM/CS notification to


document discrepancies and which is
used as rotable part traveller

IPC access to identify replacement part

Configuration update at time of removal /


installation

Configuration completeness check

Automatic goods movement postings for

Goods receipt/issue
Change of ownership
Change of parts condition
Valuation change

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 28 Jens Schoeneberg (E2)

Warehouse

Replacement part

Initial Provisioning / Follow up Procurement*

Level 1

Level 2

Level 3

No of Aircraft

No of Locations

Budget

No of Parts per Aircraft

Flying hours per Aircraft a


Day

Turn around time per


Location

Costs (have to be
calculated)

Stock transfer time

Mean Time Between


Removal

Turn Around Time

Service Level

....

Repair Float
required

Repair Float
required
per location

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 29 Jens Schoeneberg (E2)

Optimal Stock
per location
* Depends on client funding

Integrated Planning for Rotables Using APO*


Fulfillment System

Planning System

R/3

APO

Maintenance plan

Forecast
DP

Historical data
PM/CS order
Detailed Planning
SNP

Inventory
Refurbishment order
P.O. subcontracting

Fullfillment Planning
PP/DS

P.O. new part


Synchronize
2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 30 Jens Schoeneberg (E2)

P.O. = Purchase order


* Depends on client funding

Reliability Monitoring in BW

Development of Extractors for


the following Key Performance
Indicators (KPIs):

Mean Time Between Removal


(MTBR)

Mean Time Between


Unscheduled Removal (MTBUR)

Mean Time Between Failure


(MTBF)

2000 SAP AG European A&D Information Forum 2000, March 14./15.2000 / 31 Jens Schoeneberg (E2)

Vous aimerez peut-être aussi