Vous êtes sur la page 1sur 12

Team Building for

Sem 4 Students,
Chemical Engineering
Department
CDB2043 REACTION ENGINEERING
CDB2052 CHEMICAL ENGINEERING LAB 1
CDB2063 SEPARATION PROCESS II

"Alone we can do so little, together we can do


so much "
-Helen Keller1

THE SCENARIO
Heavy workloads
Too many groups and meetings
Unable to focus

OBJECTIVE
Improve students time management by
introducing integrated group projects for all
courses
To instill sense of belonging to the group

TIME AND GROUP MANAGEMENT


GROUP A1

GROUP A2

GROUP B1

GROUP B2

16

7 12

13 17

18 24

CDB 2043 REACTION


ENGINEERING

CDB 2063
SEPARATION
PROCESS II

GROUP A1

Tuesday (12-1 pm)

Tuesday (2-3 pm)

GROUP A2

Tuesday (2-3 pm)

Tuesday (12-1 pm)

GROUP B1

Thursday (10-11 am)

Thursday (11-12 pm)

GROUP B2

Thursday (11-12 pm)

Thursday (10-11 am)

CDB 2052 CHEMICAL ENGINEERING LAB 1

GROUP A1, A2

Thursday Morning (8-12


pm)

GROUP B1, B2

Thursday Afternoon (3-7


pm)

INTEGRATED GROUP PROJECT


Reaction Engineering & Separation Process II Sept 2015
First 7 weeks of this semester.
Reaction Engineering

Online quiz using quiz creator tools


Separation Process II

Chapter 1: Introduction & Mole


Balance

Chapter 1: Introduction,
Material & Heat Balance

Chapter 2: Conversion &


Reactor Sizing

Chapter 2: Crystallization:
Theory & Equipment

Chapter 3: Rate Law &


Stoichiometry

Chapter 3: Evaporation: Process


& Principles

Chapter 4: Isothermal Reactor


Design

Chapter 4: Single & Multiple


Effect Evaporators

Chapter 5: Collection &


Analysis of Rate Data

Chapter 5: Drying: Principles &


Equipment

INTEGRATED GROUP PROJECT

1. Prepare e-portfolio, each member should have a dedicated tab to


include the following:
a. Biodata of the member (with picture, not too formal, but decency is
a must!)
b. What is your contribution to this project
c. Reflection of what you have learn in this semester up to the date
(please provide a concept map use Prezi, or any other mind map
software) for all the subjects in your dedicated tab
d. And to put suggestion, how does each subject can gain your
interest

http://group1ceproject.wix.com/6bombs6
2. Other tabs should be reserved for:
e. Group Project where you put your online quiz

http://www.group3krd.wix.com/worldofreac
6
tors

INTEGRATED GROUP PROJECT


Your Milestones:
Milestone
(Tutorial Day)
Week 4
Week 5

Activity
Finalizing the online quiz concept

Week 8

E-portfolio site is up with some write up on the project the


link need to be shared to get the comment from other groups
(in the Facebook page)
At least half part of the quiz questions and answers are
ready - hardcopy
Questions are uploaded online

Week 9

Project is ready for submission

Week 6

ChemEng 2/2 (Sept15)


The online quiz must be made
available on your group eportfolio by week 9 (19 Nov 2015
before 5pm).
7

The quiz will be tested and


assessed by your classmates
during the tutorial sessions in
Week 10.

THE WEIGHTAGE
Total from final marks is 40% (20% for each course; RE & SePro)

Breakdown

Percentage (40%)

Online Quiz

30

E-Portfolio

10

TOTAL

40

Remember!!
Peer evaluation will be introduced. Your contribution towards the
success of your team will be evaluated by your team members.

10

ALL THE BEST!


11

12

Vous aimerez peut-être aussi