Strategic
Program Target/
Program
Start
Content
Verification
Sign Off
2
Theme
Selection
Theme Program
Confirm Lock Down
Product
& Process
Design
Complete
S1
Start
S0
Start
S2
Start
V1
SOF
PS
Pre
Series
Job 1
Production
Launch
Market
Launch
Kick-Off
Feasibility
Briefing /
Pre Spending
Approval
Sheet 0
Contract
Step 2
Style
Freeze
Step 3
Tooling
Launch
VP
Process
Verification
Launch
Commercial
Approve
Concept
Direction
Feasibility
Briefing/
Pre-Spending
Approval
Program
Theme
Selection (Initiative) &
Style
(2:1)
Approval
Step 2
Style
Freeze
Step 3
Tooling
Kickoff
Step 5
Production
Designs
Complete
VP
Verification
of Process
Build
PVP
Pre
Volume
Prod
(PreSeries)
Build
Job 1 Commercial
Offline Launch
0 wk
0m
Major Milestones
Vehicle Level Checkpoints
New
Chrysler
Fiats
Common
Secondary Milestones
Area Level Checkpoints
Note: Secondary events are not shown on
Fiat Executive review charts
SPV2
Program
Start
Theme
Select
Theme
Confirm &
Program
Lockdown
Class
B Surface
Release
PPDC
S1
S2
Approve
Concept
Direction
Feasibility
Briefing /
Pre-Spending
Approval
Theme
Selection
(2:1)
Program
(Initiative)
& Style
Approval
Step 2
Style
Freeze
Step 3
Tooling
Kickoff
Job 1
Market
Launch
V1 SOF
1w 0m
Step 5
Production
Designs
Complete
VP
Verification
of Process
PVP
Pre
Volume
Prod
Job 1 Commercial
Launch
Offline
0w
0m
Changes:
Eliminated SPV1
Eliminated Target Content Signoff (H)
Eliminated S0 (unless needed, then will be called Proto build)
Recognize maturity of geometry and data using Step process
Measure week 0 from Job 1 Offline (vs Start of Framing of 1st production vehicle
Major Milestones
Vehicle Level Checkpoints
Secondary Milestones
Area Level Checkpoints
Note: Secondary events are not shown on
Fiat Executive review charts
Approve
Concept
Direction
Feasibility
Briefing/
Pre-Spending
Approval
Program
Theme
Selection (Initiative) &
Style
(2:1)
Approval
Step 2
Style
Freeze
Step 3
Tooling
Kickoff
Styling
Freeze
Style
Class B
Math
Style Class
A Math
Step 5
Production
Designs
Complete
VP
Verification
of Process
Build
PVP
Pre
Volume
Prod
(PreSeries)
Build
Job 1 Commercial
Launch
Offline
0 wk
0m
Sketch
4:2
Selection Models
& CDD
& CDD
Release Release
Theme
Selection
2:1
Models &
CDD
Release
Style
Class C
Math &
CDD
Release
Conformity
Model
Confirm
Style Class
A Certified
Math
Master
Model
Approval
CAD
Step A
2nd
Geometry
Release for
Attribute
Assessment
CAD
Step B
Theme
Select
Geometry
Release
Morph &
Attribute
Assessment
11w
2.5m
11w
2.5m
CAD
Step C
CAD Step 1
CAD
Step 2
Geometry
Release for
Morph &
Attribute
Assessment
Geometry
Release
for BIW
Process
Devt
CAD Step 5
Geometry
Complete
CAD Step 3
Geometry
Release for
Tooling
Major Milestones
Vehicle Level Checkpoints
Secondary Milestones
Area Level Checkpoints
Note: Secondary events are not shown on
Fiat Executive review charts
Definition
Preliminary concept or product opportunity proposed by Marketing for further exploration based on a
vehicle placeholder in the Long Range Plan.
Product Briefing presented by Marketing describing the initial business case, customer (VOC) & regulatory
requirements for the program.
If accepted, approval is given to proceed with the concept direction.
The projects business case and potential for achieving functional and technical requirements have been
assessed with a feasible outcome and results.
Authorization is received to assign manpower to the project, begin detailed definition of functional and
operational objectives, and prepare a program contract.
If funding is required to support early design or development, pre-spending authorization may be obtained
(pre-spending = funding prior to Program (Initiative) & Style Approval.)
Production designs complete including packaging with component, system and vehicle functional capability
verified & assembly & logistics processes defined for both the supplier and Chrysler Assembly plant.
Remaining open issues are understood and plans are in place to prevent necessity to modify tooling later
in the program.
Kick-off of component production tooling to meet the Verification of Process build.
Start of the build that verifies that the vehicle design meets defined program requirements.
Vehicles are built at the assembly plant to verify that supplier and assembly plant production tooling,
equipment, processes and facilities meet customer and program objectives.
Start of the build that is the final validation the vehicle meets functional and build objectives.
Vehicles built with PPAPed parts.
Confirmation of supplier and assembly plant process readiness to execute vehicle launch and build
customer ordered vehicles.
Job 1 Offline
1st customer unit built. Start of volume production and launch ramp-up. Containment released.
Commercial Launch
Update 02/12/16
Definition
CAD Step 0
CAD Step A
CAD Step B
(Concurrent with Theme Selection)
CAD Step C
(Concurrent with Program (Initiative) & Style Approval)
CAD Step 2
(Concurrent with Styling Freeze)
Release of top hat type components - 3D math models with preliminary holes,
buttonholes & beams.
CAD Step 3
(Concurrent with Tooling Kick-Off)
CAD Step 5
(Concurrent with Production Design Complete)
Update 02/12/16
Definition
Initiate Sketches
Emotional sketches are created by Product Design Office (PDO) & reviewed with Advanced Vehicle Engineering (AVE)
& Product Planning prior to release of official styling constraints.
Realistic sketches are started by PDO after receipt of styling constraints (people package, critical cross sections, hard
points and architectural requirements) from AVE
Initial sketches are selected by Senior Management for further development around the Feasibility Briefing / PreSpending Approval. Sketches shown conform to all styling constraints defined by AVE.
Senior Management narrows the focus of design development work to two (or one) theme per brand.
Designs selected are at minimum 30% feasible to manufacturing & stamping
Styling conforms to Engineering requirements providing high level feasibility to functional objective requirements.
Senior Management narrows the focus of design development to one theme per brand.
Styling design selection occurs for all price classes and markets.
Designs selected are at minimum 60% feasible to manufacturing & stamping.
All aesthetic surface (A-side surfaces) accepted by Engineering and achieve the functional objective requirements..
Coincides with CAD Step B release.
Style Approval
(Concurrent with CAD Step C)
Senior Management approves the design which becomes plan of record for future engineering work.
Styling design approval occurs for all price classes and markets.
Designs are at minimum 80% feasible to manufacturing, stamping, functional objectives.
A-side surface (aesthetic surface) final CDD Release.
Coincides with CAD Step C release.
Any future changes to the A-side surface are directed by Engineering & made by Surfacing group.
Style Class C Math release at Fiat (Owner Styling).
Styling Freeze
(Concurrent with CAD Step 2)
Final release of the B-side surface with any required A-side surface changes completed.
Designs are 100% feasible to manufacturing, stamping, functional objectives.
Designs released by Engineering. Coincides with CAD Step 2 release.
Style Class B Math release at Fiat (Owner Engineering).
Paste Foam Model that is built from the Style Class B Math data. Used for final reflectivity studies. Coincides with CAD
Step 3 release.
Style Class A Math release at Fiat (Owner Engineering)
Update 02/12/16